Home

Results 1 - 10 of 729,424 for Alarm Systems. Search took 3.418 seconds.  
Sort by date/Sort by relevance
First consultations, carried out in Switzerland, showed that the Rhine alarm system and the Swiss part of the industrial accidents notification system could be easily linked through fax or other communication channels. (...) Huijes, RIZA) to examine the compatibility of the river alarm and industrial accident notification systems for the respective national parts of the Danube and the Rhine. Country B Country A Transboundary river Industrial installation Point of contact at local level TEIA national point of contact TEIA national point of contact Alarm system water monitoring station TEIA notification system Possible integration of notification and alarm systems Point of contact at local level
Language:English
Score: 1044067.7 - https://unece.org/fileadmin/DA...tings/wgma/doc/wgma-2003-9.pdf
Data Source: un
They fired pellets, broke windows and threw bags filled with paint.  The attacks were reported to the Argentine Federal Police.  The Embassy is in ongoing contact with the local police.  The local police provide a security detail when peaceful demonstrations are scheduled.  The Embassy is equipped with such preventive security technology as closed-circuit television, theft alarms, fire alarms, access control and security doors.  Documents are inspected using Garrett metal detectors and related inspection procedures. (...) This feature prevents unauthorized access to the offices. The system is connected to the fire alarm system so that the doors can open while the alarm is activated. It also has reserve power that allows it to run without a direct electrical supply for 24 hours - A fire alarm system, supplemented by fire extinguishers.
Language:English
Score: 1011923 - https://www.un.org/en/ga/sixth...tSecSaf/Addendum/Chile_Eng.pdf
Data Source: un
L.21 : Fire detection and alarm systems, detector and sounder devices   Français   Español     Home : ITU-T : Publications : Recommendations : L Series : L.21 Recently posted  -  Search Recommendations     L.21 : Fire detection and alarm systems, detector and sounder devices Recommendation L.21 In force components Number Title Status L.21 (10/96)   Fire detection and alarm systems, detector and sounder devices   In force   Top  -  Feedback  -  Contact us  -  Copyright © ITU  2008 All Rights Reserved Contact for this page :  ITU-T Publications Updated : 2014-05-15  
Language:English
Score: 992712.4 - https://www.itu.int/rec/T-REC-L.21
Data Source: un
Inputs for Gaza 6,099.14 Procurement of Animal Sheds for Gaza Strip 234,799.20 Procurement of Galvanized Steel Columns 42,507.16 Procurement of Material for Water Harvest Ponds 37,685.53 AL WOSTA COMPANY Total 321,091.03 ALES 24 FACILITY SRL Italy HQ - office renovations 40,705.56 HQ - office renovations 40,705.56 HQ - office renovations 6,784.26 HQ - office renovations 36,431.15 HQ - office renovations 20,217.10 HQ - office renovations 3,411.53 HQ - office renovations 72,862.31 HQ - office renovations 27,359.78 HQ - office renovations 4,957.67 HQ - office renovations 14,370.62 HQ - office renovations 3,153.86 HQ - office renovations 133,007.46 HQ - office renovations 1,646.33 ALES 24 FACILITY SRL Total 405,613.19 ALLIANZ SUISSE Switzerland Insurance provision 237,542.00 ALLIANZ SUISSE Total 237,542.00 AL-RIDA FARMS Syrian Arab Republic Laying hens for 8 locations in Syria 261,000.00 Laying hens, Syria 463,500.00 Poultry feed. 82,500.00 AL-RIDA FARMS Total 807,000.00 AMA SPA Italy Garbage Collection and Differentiated Waste Disposal Service 384,462.86 AMA SPA Total 384,462.86 AMI Services Plus Niger Seeds 199,215.71 AMI Services Plus Total 199,215.71 ARMOURED PROJECT VEHICLES LTD (APV LTD) #N/A Armoured Vehicle for Projects 146,194.25 ARMOURED PROJECT VEHICLES LTD (APV LTD) Total 146,194.25 AUTOCAR INTERNATIONAL BV Netherlands 2 vehicles 114,960.00 AUTOCAR INTERNATIONAL BV Total 114,960.00 AYS AT YOUR SERVICE Italy International Courier and Dipomatic Pouch Services 112,413.79 AYS AT YOUR SERVICE Total 112,413.79 AZBIL TELSTAR TECHNOLOGIES SLU Spain Freezer Dryer (Lyopholizers) for Pakistan 165,793.00 AZBIL TELSTAR TECHNOLOGIES SLU Total 165,793.00 BAGHANEM CORPORATION Saudi Arabia Aquaculture System 235,366.00 BAGHANEM CORPORATION Total 235,366.00 BALTIC CONTROL LTD Denmark Inspection and Sampling Services 79,746.90 Inspection and Sampling Services 3,000.00 Inspection and Sampling Services 3,000.00 Inspection and Sampling Services 6,256.00 Inspection and Sampling Services 10,652.50 Inspection and Sampling Services 608.00 Inspection and Sampling Services 3,460.00 Inspection and Sampling Services 2,240.00 Inspection and Sampling Services 2,000.00 Inspection and Sampling Services 20,899.00 Inspection and Sampling Services 1,100.00 Inspection and Sampling Services 1,500.00 Inspection and Sampling Services 5,000.00 Inspection and Sampling Services 5,350.00 Inspection and Sampling Services 12,000.00 Inspection and Sampling Services 6,000.00 Inspection and Sampling Services 3,700.00 Inspection and Sampling Services 3,250.00 Inspection and Sampling Services 1,500.00 Inspection and Sampling Services 6,050.00 Inspection and Sampling Services 4,800.00 Inspection and Sampling Services 4,900.00 Inspection and Sampling Services 1,500.00 Inspection and Sampling Services 9,750.00 Inspection and Sampling Services 4,650.00 Inspection and Sampling Services 1,950.00 Inspection and Sampling Services 1,050.00 Inspection and Sampling Services 2,010.00 Inspection and Sampling Services 3,525.00 Inspection and Sampling Services 1,500.00 Inspection and Sampling Services 10,000.00 Inspection and Sampling Services 3,000.00 Inspection and Sampling Services 8,000.00 Inspection and Sampling Services 1,500.00 Inspection and Sampling Services 1,500.00 Inspection and Sampling Services 3,000.00 Inspection and Sampling Services 1,500.00 Inspection and Sampling Services 3,000.00 Inspection and Sampling Services 1,350.00 Inspection and Sampling Services 4,120.00 BALTIC CONTROL LTD Total 249,917.40 BANGLADESH AGRICULTURAL DEVELOPMENT CORPORATION Bangladesh DAP and MOP Fertilizer 46,077.67 DAP and MOP Fertilizer 11,417.48 DAP and MOP Fertilizer 22,265.37 Vegetable Seeds 14,320.39 DAP and MOP Fertilizer 11,506.02 BANGLADESH AGRICULTURAL DEVELOPMENT CORPORATION Total 105,586.93 BANICO Mali Travaux d'amenagement d'un pont Barrage dans le bas fonds du village de Banankoro ( Kolokani) GCPS/MLI/029/SPA 140,072.43 BANICO Total 140,072.43 BASF SOUTH AFRICA (PTY) LTD South Africa Green Muscle 146,846.00 BASF SOUTH AFRICA (PTY) LTD Total 146,846.00 BILMARK GROUPS LIMITED Somalia Additional Security Enhancement Works 70,222.00 Construction of Sheikh Osman Bridge, Somaliland 139,580.00 BILMARK GROUPS LIMITED Total 209,802.00 BIOVET SARL Lebanon Magnifying lenses 4,000.00 FMD Vaccine 348,000.00 BIOVET SARL Total 352,000.00 BMZ Yemen Fishing nets 132,172.00 BMZ Total 132,172.00 BOTSWANA VACCINE INSTITUTE LTD (BVI) Botswana Anthrax Vaccine & Foot and Mouth Disease (FMD ) inactivated Trivalent Vaccine 339,465.34 Anthrax Vaccine & Foot and Mouth Disease (FMD ) inactivated Trivalent Vaccine 1,009,632.59 Foot and Mouth Disease (FMD ) inactivated Trivalent Vaccine 1,525,463.59 BOTSWANA VACCINE INSTITUTE LTD (BVI) Total 2,874,561.52 CFAO MOTORS BURKINA FASO Burkina Faso Two vehicles 98,604.22 Vehicle parts 531.01 Two vehicles 63,964.72 Vehicle parts 517.11 Vehicle parts 160.48 Vehicle parts 157.83 Vehicle parts 157.83 CFAO MOTORS BURKINA FASO Total 164,093.20 COMPLEXE SOCIAL POUR LE DEVELOPPEMENT DE LA FEMME CONGOLAISE (CSDFC)Congo, The Democratic Republic Seeds 45,962.00 Seeds 7,560.00 Seeds 74,760.00 Seeds 28,042.00 COMPLEXE SOCIAL POUR LE DEVELOPPEMENT DE LA FEMME CONGOLAISE (CSDFC) Total 156,324.00 CONSTANCE HOTELS & RESORTS Mauritius Accomodation 64,258.30 Meeting costs 76,531.87 CONSTANCE HOTELS & RESORTS Total 140,790.17 CPVR SARL Mauritania Achat chèvres suitées ,suivant les spécifications ci-jointes- 145,993.33 Achat Produits Veterinaires Projet 4,966.38 Albendazole 2500 mg Bolus en boites 32,998.33 CPVR SARL Total 183,958.04 DANOFFICE APS Denmark Computer hardware 3,651.70 Video Conference Kit 18,345.00 Computer hardware 16,968.00 Computer hardware 5,462.00 Computer hardware 1,480.00 Computer hardware 905.02 Computer hardware 5,610.00 Computer hardware 9,132.00 Computer hardware 1,465.00 Computer hardware 10,925.00 Computer hardware 10,925.00 Computer hardware 1,689.00 Computer hardware 1,540.00 Computer hardware 3,405.00 Computer hardware 3,472.00 Computer hardware 16,908.50 Computer hardware 13,863.25 Computer hardware 330.00 Computer hardware 11,337.00 Computer hardware 1,890.00 Computer hardware 936.22 Computer hardware 11,562.00 Computer hardware 20,052.50 Computer hardware 3,165.00 Computer hardware 8,755.00 Computer hardware 19,437.00 Computer hardware 1,681.00 Computer hardware 9,142.00 Computer hardware 9,922.50 Computer hardware 7,580.00 Computer hardware 6,714.00 Computer hardware 2,550.00 Computer hardware 3,150.00 Computer hardware 1,305.00 Computer hardware 1,495.00 Computer hardware 2,612.00 Computer hardware 2,612.00 Computer hardware 1,675.00 Computer hardware 755.00 Computer hardware 1,325.00 Computer hardware 1,675.00 Computer hardware 15,272.00 Computer hardware 1,848.00 Computer hardware 58,494.00 Computer hardware 53,785.00 Computer hardware 705.00 Computer hardware 1,965.00 Computer hardware 1,200.00 Computer hardware 6,390.00 Computer hardware 1,615.00 Computer hardware 3,114.00 Computer hardware 4,555.00 Computer hardware 375.00 Computer hardware 961.00 Computer hardware 22,254.00 Computer hardware 80.00 DANOFFICE APS Total 430,017.69 DATAMETRICA CONSULTORIA, PESQUISA E TELEMARKETING Brazil Estudo sobre acesso das mulheres as politicas de credito PRONAF e PRONAF Mulher 236,508.11 DATAMETRICA CONSULTORIA, PESQUISA E TELEMARKETING Total 236,508.11 DHL EXPRESS (ITALY) SRL Italy FAO's International Courier and Diplomatic Pouch Services 300,689.66 DHL EXPRESS (ITALY) SRL Total 300,689.66 DRREF AGRI PRODUCTS MARKETING Philippines Certified Rice Seed 21,977.05 Certified Rice Seed 176,292.81 DRREF AGRI PRODUCTS MARKETING Total 198,269.86 Eco-Niger sarl Niger Animal feed 246,872.70 Eco-Niger sarl Total 246,872.70 EDISCO SRL Italy Technical support services 9,496.58 Technical support services 28,610.12 Technical support services 1,641.59 Technical support services 1,203.83 Technical support services 24.83 Technical support services 483,420.68 Technical support services 5,427.41 Technical support services 1,321.38 Technical support services 3,034.48 Technical support services 1,427.59 Technical support services 648.28 Technical support services 1,982.07 EDISCO SRL Total 538,238.84 EMERGING MARKETS COMMUNICATIONS INC United States VSAT connectivity services 5,544.00 VSAT connectivity services 11,868.00 VSAT connectivity services 53,994.00 VSAT connectivity services 11,520.00 VSAT connectivity services 29,736.00 VSAT connectivity services 29,404.00 EMERGING MARKETS COMMUNICATIONS INC Total 142,066.00 ETS DJAZZ-Junior Central African Republic Outils agricoles pour divers projets 298,172.11 ETS DJAZZ-Junior Total 298,172.11 ETS KJL SERVICES Central African Republic Outils agricoles pour divers projets 314,420.37 ETS KJL SERVICES Total 314,420.37 Ets Samaila Nassamou Niger Animal feed 209,003.71 Ets Samaila Nassamou Total 209,003.71 ETS-ACHIEKH AHMAT Central African Republic Outils agricoles pour divers projets 309,211.03 ETS-ACHIEKH AHMAT Total 309,211.03 FETHO NEGOCE Central African Republic Achat Houe pour divers Projet 386,824.33 FETHO NEGOCE Total 386,824.33 FLYTOUR BUSINESS TRAVEL VIAGENS E TURISMO LTDA Brazil Travel Services 63,802.64 Travel Services 1,999.27 Travel Services 736.04 Travel Services 5,000.00 Travel Services 2,500.00 Travel Services 5,000.00 Travel Services 13,380.00 Travel Services 42,535.09 Travel Services 21,267.55 Travel Services 715.98 Travel Services 1,637.39 Travel Services 4,780.44 Travel Services 1,513.58 Travel Services 2,353.16 Travel Services 1,173.11 Travel Services 32,893.94 FLYTOUR BUSINESS TRAVEL VIAGENS E TURISMO LTDA Total 201,288.19 G4S LEBANON Lebanon Security Services 52,580.00 Security Services 47,800.00 G4S LEBANON Total 100,380.00 GALA SPA Italy Supply of Electricity 2,593,103.45 Supply of Electricity 16,282.23 GALA SPA Total 2,609,385.68 GEO&LAND LLC Kosovo Kosovo Forest Information System (KFIS) 176,475.00 GEO&LAND LLC Total 176,475.00 GHULAM MOHAMMAD DIN COMPANY LTD Afghanistan DAP & Urea Fertilizers for Hirat Province 286,125.00 Procurement of Hand Tools 77,220.00 GHULAM MOHAMMAD DIN COMPANY LTD Total 363,345.00 GIC RIBAOU Cameroon Semences vivrières 493,305.61 GIC RIBAOU Total 493,305.61 GROUPE LUBEIRATE PHARMA Mauritania Achat chèvres suitées ,suivant les spécifications ci-jointes 139,532.56 GROUPE LUBEIRATE PHARMA Total 139,532.56 HATZIIOAKIMIDIS SA Greece Abattoir equipment 868,913.33 HATZIIOAKIMIDIS SA Total 868,913.33 HIGH TRUST GHANA LTD Ghana RENOVATION WORKS AT FAO GHANA AND IFAD PREMISES 172,869.52 Renovation Works 1,889.89 HIGH TRUST GHANA LTD Total 174,759.41 HITRAC ENGINEERING GROUP SRL Italy Maintenance of A/C and heating systems 807,060.30 Maintenance of A/C and heating systems 19,606.84 Maintenance of A/C and heating systems 32,877.66 Maintenance of A/C and heating systems 5,084.33 Maintenance of A/C and heating systems 35,201.09 Maintenance of A/C and heating systems 5,431.42 Maintenance of A/C and heating systems 19,287.60 Maintenance of A/C and heating systems 12,083.13 Maintenance of A/C and heating systems 14,154.17 Maintenance of A/C and heating systems 14,530.87 Maintenance of A/C and heating systems 1,286.97 Maintenance of A/C and heating systems 20,028.30 Maintenance of A/C and heating systems 5,886.96 Maintenance of A/C and heating systems 20,087.12 Maintenance of A/C and heating systems 1,686.80 Maintenance of A/C and heating systems 19,287.60 Maintenance of A/C and heating systems 15,753.38 Maintenance of A/C and heating systems 10,484.90 Maintenance of A/C and heating systems 1,856.88 Maintenance of A/C and heating systems 7,759.59 Maintenance of A/C and heating systems 37,300.47 Maintenance of A/C and heating systems 18,380.37 Maintenance of A/C and heating systems 19,445.91 Maintenance of A/C and heating systems 3,559.22 Maintenance of A/C and heating systems 3,252.52 Maintenance of A/C and heating systems 4,363.75 Maintenance of A/C and heating systems 10,569.51 Maintenance of A/C and heating systems 10,545.65 Maintenance of A/C and heating systems 30,660.12 Maintenance of A/C and heating systems 18,403.32 Maintenance of A/C and heating systems 15,018.92 HITRAC ENGINEERING GROUP SRL Total 1,240,935.67 HYGROTECH SA PTY LTD South Africa Cowpea IT18 Seeds 115,604.03 HYGROTECH SA PTY LTD Total 115,604.03 IBAH Travaux Mali Travaux d'amenagement d'un pont barrage dans le bas fonds 129,427.77 IBAH Travaux Total 129,427.77 ICI PAKISTAN LIMITED Pakistan Sunflower seeds 199,943.15 seeds 15,069.57 ICI PAKISTAN LIMITED Total 215,012.72 IMAD HAMADA AND BROTHERS COMPANY Palestine Chicken Units in Gaza Strip 271,057.31 IMAD HAMADA AND BROTHERS COMPANY Total 271,057.31 INTERNATIONAL FUND FOR AGRICULTURAL DEVELOPMENT (IFAD) Italy Organizational staff costs 95,809.49 Organizational staff costs 18,325.31 INTERNATIONAL FUND FOR AGRICULTURAL DEVELOPMENT (IFAD) Total 114,134.80 ITALIA LOGISTICA SRL Italy Handling of the Organization’s Publications 124,830.39 ITALIA LOGISTICA SRL Total 124,830.39 Kenana Sugar Company LTD Sudan Procurement of animal feeds 186,088.15 Kenana Sugar Company LTD Total 186,088.15 KIF Construction Ethiopia Construction 148,391.80 Construction of Central UPS House 9,998.77 KIF Construction Total 158,390.57 KING AGRO Burkina Faso Agricultural tools 124,608.88 KING AGRO Total 124,608.88 KONE SPA Italy Lift Maintenance 126,187.25 KONE SPA Total 126,187.25 Korjan Engineering Enterprise Somalia Rehabilitation of Irrigation Canal Systems in Beer,Burao, Somaliland 249,110.00 Korjan Engineering Enterprise Total 249,110.00 LE BATISSEUR DU SAHEL Burkina Faso Construction de boulis dans 204,995.57 LE BATISSEUR DU SAHEL Total 204,995.57 LUSNA Makine San ve Tic Ltd Sti Turkey Agricultural Machinery and Milking Equipment for Azerbaijan, Kyrgyzstan and Tajikistan 111,640.00 LUSNA Makine San ve Tic Ltd Sti Total 111,640.00 MAALOUF TRADING CO Lebanon Concentrate Animals Feeds for Dairy Cows and Small Ruminants 991,750.00 MAALOUF TRADING CO Total 991,750.00 MADAGASCAR AUTOMOBILE (MADAUTO) Madagascar Vehicle repairs services 1,297.18 Vehicle repairs services 2,527.34 Vehicle 127,360.00 Vehicle parts 65,147.51 Vehicle repairs services 1,159.75 MADAGASCAR AUTOMOBILE (MADAUTO) Total 197,491.78 MEDIPHARM (EAST AFRICA) LTD Kenya Vaccinces 84,400.00 Vaccinces 1,970.50 Veterinary Equipment 31,700.00 MEDIPHARM (EAST AFRICA) LTD Total 118,070.50 MESSRS KHAN BROTHERS Bangladesh Croaker Gill Net(Poma Jal) 154,485.44 Ducks,Poultry sheds and Poultry Feed 2,884.86 Goat Sheds 19,404.62 Poultry Sheds 25,304.01 Veterinary Medicine 19,692.56 MESSRS KHAN BROTHERS Total 221,771.49 MICROSOFT IRELAND OPERATIONS LTD United Kingdom Software Contract 1,003,566.10 MICROSOFT IRELAND OPERATIONS LTD Total 1,003,566.10 MIDAIR France Aerial Survey and Locust Control Services with Fixed-wing aircraft in Madagascar 820,600.00 MIDAIR Total 820,600.00 Ministry of Animal Resource Fisheries & Range Land Sudan Vaccines 56,319.14 Veterinary Medicine 56,319.14 Ministry of Animal Resource Fisheries & Range Land Total 112,638.28 MITSA SRL Italy Water Treatment of heating/cooling and disinfection of a/c systems 555,468.62 MITSA SRL Total 555,468.62 MODERN TIME ENTERPRISES Philippines Urea and Fertilizers 121,892.32 MODERN TIME ENTERPRISES Total 121,892.32 MUSA ABU HATAB EST. (...) Total 316,328.43 UNITED NATIONS United States Office rent 252,483.00 Administration Charges 3,415.67 Telephone and fax charges 12,968.52 UNITED NATIONS Total 268,867.19 UNITED NATIONS MISSION IN SOUTH SUDAN #N/A Diesel to FAO offices in South Sudan 153,915.46 UNITED NATIONS MISSION IN SOUTH SUDAN Total 153,915.46 UNIVERSAL HARVESTER, INC Philippines Urea Fertilzer 300,801.43 UNIVERSAL HARVESTER, INC Total 300,801.43 V & W ENGINEERING & INSTALLATIONS (PVT) LTD Zimbabwe Borehole equipment. 80,893.80 Borehole equipment. 51,729.20 V & W ENGINEERING & INSTALLATIONS (PVT) LTD Total 132,623.00 VAKAMAT (PVT) LTD Zimbabwe Supply building and hardware materials 114,506.55 Supply building and hardware materials 19,377.00 Hardware Materials 1,851.70 Complete tool set kits 1,848.44 VAKAMAT (PVT) LTD Total 137,583.69 VICTORIA SEEDS LIMITED Uganda Crop Seeds-Sorghum, Maize and cowpea 308,442.00 VICTORIA SEEDS LIMITED Total 308,442.00 Voluntary Organization for Social Development(VOSD) Bangladesh Input distribution services 135,270.68 Voluntary Organization for Social Development(VOSD) Total 135,270.68 WORLD FOOD PROGRAMME (WFP) Afghanistan WFP-FAO Support charges 15,369.00 Bangladesh WFP-FAO Support charges 22,809.00 Haiti Warehousing 10,670.40 Liberia Warehousing 35,049.30 United Arab Emirates Camping Equipment for Madagascar - 27,457.25 HF Codan with accessories 20,615.52 #N/A Advance payment for FAO movement and operations 60,000.00 WORLD FOOD PROGRAMME (WFP) Total 191,970.47 YEGHEGNADZOR BKT OJSC Armenia Contract 2014/ARM/REUTD-CPA 308390 151,091.25 YEGHEGNADZOR BKT OJSC Total 151,091.25 ZANZI SERVIZI SPA Italy Maintenance of electrical installations, fire detection and alarm systems 163,884.37 Maintenance of electrical installations, fire detection and alarm systems 1,328.91 Maintenance of electrical installations, fire detection and alarm systems 7,891.59 Maintenance of electrical installations, fire detection and alarm systems 4,463.14 Maintenance of electrical installations, fire detection and alarm systems 6,282.56 Maintenance of electrical installations, fire detection and alarm systems 4,178.97 Maintenance of electrical installations, fire detection and alarm systems 1,064.29 Maintenance of electrical installations, fire detection and alarm systems 21,137.73 Maintenance of electrical installations, fire detection and alarm systems 4,665.90 Maintenance of electrical installations, fire detection and alarm systems 6,350.00 Maintenance of electrical installations, fire detection and alarm systems 6,910.05 Maintenance of electrical installations, fire detection and alarm systems 7,763.68 Maintenance of electrical installations, fire detection and alarm systems 1,984.86 Maintenance of electrical installations, fire detection and alarm systems 10,015.98 Maintenance of electrical installations, fire detection and alarm systems 4,919.77 Maintenance of electrical installations, fire detection and alarm systems 9,845.96 Maintenance of electrical installations, fire detection and alarm systems 46,870.59 Maintenance of electrical installations, fire detection and alarm systems 40,914.28 Maintenance of electrical installations, fire detection and alarm systems 4,061.35 Maintenance of electrical installations, fire detection and alarm systems 4,739.02 ZANZI SERVIZI SPA Total 359,273.00
Language:English
Score: 988017.1 - https://www.fao.org/fileadmin/...14/2014_Vendors_Q1_100-000.pdf
Data Source: un
Mapping of IMDRF essential principles to AI for health software - Att.1 - Spreadsheets for cluster creation Cover FGAI4H-G-038-A01 New Delhi, 13-15 November 2019 Source: WG DAISAM chairs Title: Mapping of IMDRF essential principles to AI for health software - Attachment 1 - Spreadsheets for cluster creation Abstract: This spreadsheet contains four worksheets that document how clusters were created for the main contribution. key concepts Chronology Keyword Section 5 Acceptable risks 5.1.1 109 Accuracy 5.8.1 197 Accuracy 5.12.2 245 Accuracy of measurements (trueness and precision) 7.2.1 40 Alarms 5.1.3 44 Alarms 5.1.3 235 Analytical performance 7.2.1 247 Analytical sensitivity/Limit of detection 7.2.1 249 Analytical specificity 7.2.1 301 Appropriate representation 7.2.4 77 Benefit-risk determination 5.2.1 275 Calibrators 7.2.2 136 Change management process 5.8.2 75 Clinical evaluation 5.2.1 83 Clinical experience 5.2.1 79 Clinical investigation report 5.2.1 237 Clinical performance 7.2.1 255 Clinical performance 7.2.1 145 Connectivity 5.8.3 57 Consider user knowledge 5.1.5 15 Continuous, iterative risk management 5.1.2 27 Continuous, iterative risk management 5.1.2 28 Continuous, iterative risk management 5.1.2 143 Contrast ratio of the screen 5.8.3 277 Control materials 7.2.2 271 Control procedures 7.2.1 161 Cybersecurity 5.8.5 88 Declaration of Helsinki 5.2.2 257 Diagnostic/clinical sensitivity 7.2.1 259 Diagnostic/clinical specificity 7.2.1 171 Easily understood 5.10.1 186 Easy to apply 5.12.1 184 Easy to understand 5.12.1 86 Ehtical prinicples 5.2.2 103 Electronic programmable systems 5.8.1 303 Ethnicity 7.2.4 63 Expected life of device 5.1.6 267 Expected values in normal and affected populations. 7.2.1 149 External factors related to their use (varying environment as regards level of light or noise) 5.8.3 228 Failure 5.12.3 24 Foreseeable misuse 5.1.2 305 Gender 7.2.4 307 Genetic diversity 7.2.4 210 Handling 5.12.2 153 Hardware 5.8.4 7 Health 5.1.1 21 Identify and analyze hazards 5.1.2 165 Information [Manual] 5.10.1 130 Information security (e.g., safely implement updates) 5.8.2 98 Informed consent 5.2.2 182 Instructions 5.12.1 199 Instructions 5.12.2 54 Intended usage environment 5.1.5 23 Intended use 5.1.2 62 Intended use 5.1.6 178 Intended use 5.12.1 222 Intended use 5.12.3 273 Intended use 7.2.1 293 Intended use 7.2.4 297 Intended use environment 7.2.4 295 Intended user 7.2.4 2 Intendeded conditions of use 5.1.1 212 Interpretation of results 5.12.2 155 IT networks characteristics 5.8.4 157 IT security measures 5.8.4 174 Lay user 5.12.1 188 Lay user 5.12.2 214 Lay users 5.12.3 100 Leftover specimen 5.2.2 265 Likelihood ratios 7.2.1 17 MD life cycle 5.1.2 251 Measuring interval/range 7.2.1 147 Memory 5.8.3 151 Minimum requirements 5.8.4 139 Mobile computing platforms 5.8.3 192 Near-patient testing 5.12.2 218 Near-patient testing 5.12.3 263 Negative predictive value 7.2.1 285 Numerical values 7.2.3 6 Patient benefits 5.1.1 4 Perform as intended 5.1.1 1 Performance 5.1.1 14 Performance 5.1.2 117 Performance 5.8.1 169 Performance 5.10.1 224 Performance 5.12.3 233 Performance characteristics 7.2.1 291 Performance evaluation 7.2.4 261 Positive predictive value 7.2.1 96 Pre-study protocol review 5.2.2 113 Precision 5.8.1 311 Prevalence rates 7.2.4 126 Principles of development life cycle (e.g., rapid development cycles, frequent changes, the cumulative effect of changes) 5.8.2 159 Protection against unauthorized access 5.8.4 163 Protection against unauthorized access 5.8.5 81 Published scientific literature 5.2.1 11 Quality 5.1.2 283 Reference materials of higher order 7.2.2 281 Reference measurement procedures 7.2.2 299 Relevant population 7.2.4 111 Reliability 5.8.1 309 Representative population 7.2.4 48 Residual risk information for user 5.1.4 90 Rights 5.2.2 22 Risk 5.1.2 70 Risk 5.1.9 26 Risk control 5.1.2 38 Risk control 5.1.3 32 Risk control measures 5.1.3 25 Risk elimination 5.1.2 128 Risk management (e.g., changes to system, environment, and data) 5.8.2 20 Risk management plan 5.1.2 9 Risk management system 5.1.2 208 Risk of error 5.12.2 50 Risk reduction 5.1.5 52 Risk reduction 5.1.5 121 Risk reduction 5.8.1 201 Risk reduction 5.12.2 206 Risk reduction 5.12.2 42 Risks that cannot be eliminated 5.1.3 39 Safe design 5.1.3 3 Safety 5.1.1 12 Safety 5.1.2 92 Safety 5.2.2 115 Safety 5.8.1 167 Safety 5.10.1 195 Safety 5.12.2 34 Safety principles compliance 5.1.3 176 Self-testing 5.12.1 190 Self-testing 5.12.2 216 Self-testing 5.12.3 67 Shelf life 5.1.8 72 Side-effects 5.1.9 119 Single fault conditions 5.8.1 141 Size 5.8.3 105 Software 5.8.1 107 Software as a medical device 5.8.1 253 Specimen stability 7.2.1 65 Stability 5.1.8 287 Standardized units 7.2.3 36 State of the art 5.1.3 124 State of the art 5.8.2 241 State of the art 7.2.1 60 Stress resistance 5.1.6 243 Traceability of calibrators and controls 7.2.1 279 Traceability of values 7.2.2 203 Training 5.12.2 30 Update control measures 5.1.2 18 Updating 5.1.2 180 Usage variations (user technique, usage environment) 5.12.1 46 User training 5.1.3 289 User understanding 7.2.3 230 Valid result 5.12.3 134 Validation 5.8.2 239 Validation 7.2.1 269 Validation 7.2.1 132 Verification 5.8.2 220 Verification 5.12.3 226 Warning 5.12.3 94 Well-being 5.2.2 &A Page &P ep key concepts with clusters Chronology Keyword Section Cluster 1 Cluster 2 Cluster 3 1 Performance 5.1.1 Analytical performance Clinical performance 2 Intendeded conditions of use 5.1.1 Intended use 3 Safety 5.1.1 Safety 4 Perform as intended 5.1.1 Intended use Safety 5 Acceptable risks 5.1.1 Risk and Alarms 6 Patient benefits 5.1.1 Benefit-risk Clinical performance 7 Health 5.1.1 Clinical performance 9 Risk management system 5.1.2 Risk and Alarms 11 Quality 5.1.2 Analytical performance Clinical performance 12 Safety 5.1.2 Safety 14 Performance 5.1.2 Analytical performance Clinical performance 15 Continuous, iterative risk management 5.1.2 Risk and Alarms 17 MD life cycle 5.1.2 Life cycle 18 Updating 5.1.2 Control Safety 20 Risk management plan 5.1.2 Risk and Alarms 21 Identify and analyze hazards 5.1.2 Risk and Alarms Safety 22 Risk 5.1.2 Risk and Alarms 23 Intended use 5.1.2 Intended use 24 Foreseeable misuse 5.1.2 Safety Risk and Alarms 25 Risk elimination 5.1.2 Risk and Alarms 26 Risk control 5.1.2 Risk and Alarms 27 Continuous, iterative risk management 5.1.2 Risk and Alarms 28 Continuous, iterative risk management 5.1.2 Risk and Alarms 30 Update control measures 5.1.2 Control Safety 32 Risk control measures 5.1.3 Risk and Alarms 34 Safety principles compliance 5.1.3 Safety 36 State of the art 5.1.3 38 Risk control 5.1.3 Risk and Alarms 39 Safe design 5.1.3 Safety 40 Alarms 5.1.3 Risk and Alarms Safety 42 Risks that cannot be eliminated 5.1.3 Risk and Alarms Documentation 44 Alarms 5.1.3 Risk and Alarms 46 User training 5.1.3 Documentation Intended user 48 Residual risk information for user 5.1.4 Documentation Intended use 50 Risk reduction 5.1.5 Risk and Alarms 52 Risk reduction 5.1.5 Risk and Alarms 54 Intended usage environment 5.1.5 Intended use Documentation 57 Consider user knowledge 5.1.5 Intended user 60 Stress resistance 5.1.6 Safety External factors 62 Intended use 5.1.6 Intended use 63 Expected life of device 5.1.6 Documentation Safety 65 Stability 5.1.8 Life cycle Change management Data quality 67 Shelf life 5.1.8 Life cycle 70 Risk 5.1.9 Risk and Alarms 72 Side-effects 5.1.9 Risk and Alarms 75 Clinical evaluation 5.2.1 Clinical performance 77 Benefit-risk determination 5.2.1 Benefit-risk 79 Clinical investigation report 5.2.1 Clinical performance 81 Published scientific literature 5.2.1 Clinical performance 83 Clinical experience 5.2.1 Clinical performance 86 Ehtical prinicples 5.2.2 Ethical compliance 88 Declaration of Helsinki 5.2.2 Ethical compliance 90 Rights 5.2.2 Ethical compliance 92 Safety 5.2.2 Safety 94 Well-being 5.2.2 Benefit-risk Clinical performance 96 Pre-study protocol review 5.2.2 Ethical compliance 98 Informed consent 5.2.2 Ethical compliance 100 Leftover specimen 5.2.2 Ethical compliance 103 Electronic programmable systems 5.8.1 Software 105 Software 5.8.1 107 Software as a medical device 5.8.1 109 Accuracy 5.8.1 Analytical performance Safety 111 Reliability 5.8.1 Analytical performance Technical interfaces 113 Precision 5.8.1 Safety Analytical performance 115 Safety 5.8.1 Safety 117 Performance 5.8.1 Analytical performance Intended use 119 Single fault conditions 5.8.1 Risk and Alarms 121 Risk reduction 5.8.1 Risk and Alarms 124 State of the art 5.8.2 126 Principles of development life cycle (e.g., rapid development cycles, frequent changes, the cumulative effect of changes) 5.8.2 Life cycle Safety 128 Risk management (e.g., changes to system, environment, and data) 5.8.2 Risk and Alarms 130 Information security (e.g., safely implement updates) 5.8.2 Technical interfaces 132 Verification 5.8.2 Analytical performance Control 134 Validation 5.8.2 Analytical performance Control 136 Change management process 5.8.2 Change management 139 Mobile computing platforms 5.8.3 Technical interfaces 141 Size 5.8.3 Technical interfaces 143 Contrast ratio of the screen 5.8.3 Technical interfaces 145 Connectivity 5.8.3 Technical interfaces 147 Memory 5.8.3 Technical interfaces 149 External factors related to their use (varying environment as regards level of light or noise) 5.8.3 External factors 151 Minimum requirements 5.8.4 Technical interfaces 153 Hardware 5.8.4 Technical interfaces 155 IT networks characteristics 5.8.4 Technical interfaces 157 IT security measures 5.8.4 Technical interfaces 159 Protection against unauthorized access 5.8.4 Safety Technical interfaces 161 Cybersecurity 5.8.5 Technical interfaces Safety Documentation 163 Protection against unauthorized access 5.8.5 Safety Technical interfaces 165 Information [Manual] 5.10.1 Documentation Intended use 167 Safety 5.10.1 Safety 169 Performance 5.10.1 Documentation Intended user 171 Easily understood 5.10.1 Explainability Intended user Intended use 174 Lay user 5.12.1 Intended user 176 Self-testing 5.12.1 Intended use Intended user 178 Intended use 5.12.1 Intended use 180 Usage variations (user technique, usage environment) 5.12.1 Intended use Intended user 182 Instructions 5.12.1 Documentation Intended use 184 Easy to understand 5.12.1 Explainability Intended user 186 Easy to apply 5.12.1 Intended user Documentation 188 Lay user 5.12.2 Intended user 190 Self-testing 5.12.2 Intended use Intended user 192 Near-patient testing 5.12.2 Safety Intended user Intended use 195 Safety 5.12.2 Safety 197 Accuracy 5.12.2 Analytical performance 199 Instructions 5.12.2 Documentation Intended use 201 Risk reduction 5.12.2 Risk and Alarms 203 Training 5.12.2 Documentation Intended user 206 Risk reduction 5.12.2 Risk and Alarms 208 Risk of error 5.12.2 Risk and Alarms 210 Handling 5.12.2 Documentation Intended use 212 Interpretation of results 5.12.2 Interpretability Intended user 214 Lay users 5.12.3 Intended user 216 Self-testing 5.12.3 Intended use Intended user 218 Near-patient testing 5.12.3 Safety Intended user 220 Verification 5.12.3 Analytical performance Control 222 Intended use 5.12.3 Intended use 224 Performance 5.12.3 Safety Intended user 226 Warning 5.12.3 Risk and Alarms Safety 228 Failure 5.12.3 Safety Risk and Alarms 230 Valid result 5.12.3 233 Performance characteristics 7.2.1 Analytical performance Clinical performance 235 Analytical performance 7.2.1 Analytical performance 237 Clinical performance 7.2.1 Clinical performance 239 Validation 7.2.1 Analytical performance Control 241 State of the art 7.2.1 243 Traceability of calibrators and controls 7.2.1 Analytical performance 245 Accuracy of measurements (trueness and precision) 7.2.1 Analytical performance Measurements 247 Analytical sensitivity/Limit of detection 7.2.1 Analytical performance 249 Analytical specificity 7.2.1 Analytical performance 251 Measuring interval/range 7.2.1 Analytical performance 253 Specimen stability 7.2.1 Analytical performance 255 Clinical performance 7.2.1 Clinical performance 257 Diagnostic/clinical sensitivity 7.2.1 Clinical performance 259 Diagnostic/clinical specificity 7.2.1 Clinical performance 261 Positive predictive value 7.2.1 Clinical performance 263 Negative predictive value 7.2.1 Clinical performance 265 Likelihood ratios 7.2.1 Clinical performance 267 Expected values in normal and affected populations. 7.2.1 Clinical performance 269 Validation 7.2.1 Analytical performance Control 271 Control procedures 7.2.1 Safety Control 273 Intended use 7.2.1 Intended use 275 Calibrators 7.2.2 Measurements Analytical performance 277 Control materials 7.2.2 Measurements Analytical performance 279 Traceability of values 7.2.2 Measurements Data quality 281 Reference measurement procedures 7.2.2 Measurements Data quality 283 Reference materials of higher order 7.2.2 Measurements Data quality 285 Numerical values 7.2.3 Interpretability 287 Standardized units 7.2.3 Measurements Data quality Change management 289 User understanding 7.2.3 Documentation Intended user Change management 291 Performance evaluation 7.2.4 Intended user Intended use 293 Intended use 7.2.4 Intended use 295 Intended user 7.2.4 Intended user Explainability 297 Intended use environment 7.2.4 Intended use 299 Relevant population 7.2.4 Clinical performance Data quality 301 Appropriate representation 7.2.4 Intended use Data quality 303 Ethnicity 7.2.4 Data quality Clinical performance 305 Gender 7.2.4 Clinical performance 307 Genetic diversity 7.2.4 Clinical performance 309 Representative population 7.2.4 Clinical performance Data quality 311 Prevalence rates 7.2.4 Clinical performance Data quality &"Times New Roman,Regular"&12&A &"Times New Roman,Regular"&12Page &P ai4h concepts with clusters Super-cluster name Cluster-name AI4H concept name Super-cluster ID Cluster ID AI4H concept ID Performance Analytical performance Two-class classification metrics A a 1 Performance Analytical performance Mutli-class classification metrics A a 2 Performance Analytical performance Regression metrics A a 3 Life Cycle Change management Evolution of the AI algorithm D a 1 Risk and Control Control Cross-validation B a 1 Risk and Control Control Statistical tests B a 2 Risk and Control Control Information criteria B a 3 Risk and Control Control Robustness validation B a 4 Risk and Control Control Out of sample testing B a 5 Risk and Control Control Attribution methods B a 6 Risk and Control Data quality Data diversity B b 1 Risk and Control Data quality Preprocessing B b 2 Risk and Control Data quality Normalization B b 3 Risk and Control Data quality Expert labels B b 4 Risk and Control Data quality Data collection procedure B b 5 Usability and Documentation Documentation Datasheets for data sets C a 1 Usability and Documentation Documentation Modelcards for ML models C a 2 Ethical Compliance Ethical Compliance FAT optimization objectives (“FAT training”) F a 1 Ethical Compliance Ethical Compliance FAT validation F a 2 Ethical Compliance Ethical Compliance Data acceptance and handling F a 3 Ethical Compliance Ethical Compliance Patient consent F a 4 Usability and Documentation Explainability see B) Risk and Control a) Control 6) Attribution methods (“Explainable AI (XAI)”) C b 1 Usability and Documentation Explainability Counterfactual explanations C b 2 Usability and Documentation Intended use Specification for inputs C c 1 Usability and Documentation Intended use see C) Usability and Documentation a) Documentation 1) Datasheets for data sets C c 2 Usability and Documentation Intended use see C) Usability and Documentation a) Documentation 2) Modelcards for ML models C c 3 Usability and Documentation Interpretability see B) Risk and Control a) Control 6) Attribution methods (“Explainable AI (XAI)”) C e 1 Life Cycle Life Cycle AI software life cycle D b 1 Performance Measurements see B) Risk and Control b) Data quality A d 1 Risk and Control Risk and Alarms Uncertainty quantification B c 1 Risk and Control Risk and Alarms Outlier detection B c 2 Risk and Control Safety Robust training B d 1 Dependencies Technical Interfaces Compression of AI4H models E b 1 Dependencies Technical Interfaces Response time E b 2 Dependencies Technical Interfaces Memory E b 3 Dependencies Technical Interfaces Compute E b 4 Dependencies Technical Interfaces Networking E b 5 Dependencies Technical Interfaces Operating system E b 6 Dependencies Technical Interfaces Displays E b 7 Dependencies Technical Interfaces Sensors for input data E b 8 &"Times New Roman,Regular"&12&A &"Times New Roman,Regular"&12Page &P clusters with super-clusters Clusters Super-clusters My order Analytical performance Performance 1 Benefit-risk Performance 1 Clinical performance Performance 1 Measurements Performance 1 Control Risk and control 2 Data quality Risk and control 2 Risk and Alarms Risk and control 2 Safety Risk and control 2 Documentation Usability and documentation 3 Explainability Usability and documentation 3 Intended use Usability and documentation 3 Intended user Usability and documentation 3 Interpretability Usability and documentation 3 Change management Life cycle 4 Life cycle Life cycle 4 External factors Dependencies 5 Technical interfaces Dependencies 5 Ethical compliance Ethical compliance 6 Software &"Times New Roman,Regular"&12&A &"Times New Roman,Regular"&12Page &P
Language:English
Score: 985469.3 - https://www.itu.int/en/ITU-T/f...ents/all/FGAI4H-G-038-A01.xlsx
Data Source: un
The experts are looking at how to better plan for these outbreaks, which includes early detection of outbreaks through alarm signals. Coming up with better contingency planning “The problem is always about report systems and how they work,” noted TDR’s Axel Kroeger. (...) “The idea is to identify alarms systems and to predict when an outbreak is coming.” (...) “The idea is to develop alarm systems and to predict when an outbreak is coming,” said Kroeger.
Language:English
Score: 981756.6 - https://www.who.int/tdr/news/2...gue-surveill-outbreak-resp/en/
Data Source: un
No two rows will have the same value of upsAlarmDescr, since alarms define conditions. In order to meet this requirement, care should be taken in the definition of alarm conditions to insure that a system cannot enter the same condition multiple times simultaneously. (...) Setting this object to muted(3) when the audible alarm is sounding shall temporarily silence the alarm. (...) Writes of the value muted(3) when the audible alarm is not sounding shall be accepted but otherwise shall have no effect." ::= { upsConfig 8 } upsConfigLowVoltageTransferPoint OBJECT-TYPE SYNTAX NonNegativeInteger UNITS "RMS Volts" MAX-ACCESS read-write STATUS current DESCRIPTION "The minimum input line voltage allowed before the UPS system transfers to battery backup." ::= { upsConfig 9 } upsConfigHighVoltageTransferPoint OBJECT-TYPE SYNTAX NonNegativeInteger UNITS "RMS Volts" MAX-ACCESS read-write STATUS current DESCRIPTION "The maximum line voltage allowed before the UPS system transfers to battery backup." ::= { upsConfig 10 } -- -- notifications, i.e., traps -- upsTraps OBJECT IDENTIFIER ::= { upsMIB 2 } -- This section defines the well-known notifications sent by -- UPS agents. -- Care must be taken to insure that no particular notification -- is sent to a single receiving entity more often than once -- every five seconds. upsTrapOnBattery NOTIFICATION-TYPE OBJECTS { upsEstimatedMinutesRemaining, upsSecondsOnBattery, upsConfigLowBattTime } STATUS current DESCRIPTION "The UPS is operating on battery power.
Language:English
Score: 981462.6 - https://www.itu.int/wftp3/Publ.../ietf/rfc/rfc1628/UPS-MIB.html
Data Source: un
No two rows will have the same value of upsAlarmDescr, since alarms define conditions. In order to meet this requirement, care should be taken in the definition of alarm conditions to insure that a system cannot enter the same condition multiple times simultaneously. (...) Setting this object to muted(3) when the audible alarm is sounding shall temporarily silence the alarm. (...) Writes of the value muted(3) when the audible alarm is not sounding shall be accepted but otherwise shall have no effect." ::= { upsConfig 8 } upsConfigLowVoltageTransferPoint OBJECT-TYPE SYNTAX NonNegativeInteger UNITS "RMS Volts" MAX-ACCESS read-write STATUS current DESCRIPTION "The minimum input line voltage allowed before the UPS system transfers to battery backup." ::= { upsConfig 9 } upsConfigHighVoltageTransferPoint OBJECT-TYPE SYNTAX NonNegativeInteger UNITS "RMS Volts" MAX-ACCESS read-write STATUS current DESCRIPTION "The maximum line voltage allowed before the UPS system transfers to battery backup." ::= { upsConfig 10 } -- -- notifications, i.e., traps -- upsTraps OBJECT IDENTIFIER ::= { upsMIB 2 } -- This section defines the well-known notifications sent by -- UPS agents. -- Care must be taken to insure that no particular notification -- is sent to a single receiving entity more often than once -- every five seconds. upsTrapOnBattery NOTIFICATION-TYPE OBJECTS { upsEstimatedMinutesRemaining, upsSecondsOnBattery, upsConfigLowBattTime } STATUS current DESCRIPTION "The UPS is operating on battery power.
Language:English
Score: 981462.6 - https://www.itu.int/wftp3/Publ...l/ietf/rfc/rfc1628/UPS-MIB.mib
Data Source: un
M.32 : Principles for using alarm information for maintenance of international transmission systems and equipment   Français   Español     Home : ITU-T : Publications : Recommendations : M Series : M.32 Recently posted  -  Search Recommendations     M.32 : Principles for using alarm information for maintenance of international transmission systems and equipment Recommendation M.32 In force components Number Title Status M.32 (11/88)   Principles for using alarm information for maintenance of international transmission systems and equipment   Former M.22 (1984) In force   Top  -  Feedback  -  Contact us  -  Copyright © ITU  2008 All Rights Reserved Contact for this page :  ITU-T Publications Updated : 2006/07/31  
Language:English
Score: 977132.2 - https://www.itu.int/rec/T-REC-M.32
Data Source: un
The OS in a client role is called managing system, and the OS in a server role is called managed system. (...)

**/ module notifications { /** Object Creation Notification (OCN) */ const string NT_OBJECT_CREATION = "NT_OBJECT_CREATION"; /** Object Deletion Notification (ODN) */ const string NT_OBJECT_DELETION = "NT_OBJECT_DELETION"; /** Attribute Value Change notification (AVC) */ const string NT_ATTRIBUTE_VALUE_CHANGE = "NT_ATTRIBUTE_VALUE_CHANGE"; /** State Change Notification (SCN) */ const string NT_STATE_CHANGE = "NT_STATE_CHANGE"; /** File Transfer Status notification (FTS) */ const string NT_FILE_TRANSFER_STATUS = "NT_FILE_TRANSFER_STATUS"; /** Backup Status Event notification (BSE) */ const string NT_BACKUP_STATUS = "NT_BACKUP_STATUS"; /** Heartbeat Event notification (HBE) */ const string NT_HEARTBEAT = "NT_HEARTBEAT"; /** Alarm notification (ALM) */ const string NT_ALARM = "NT_ALARM"; /** Threshold Crossing Alert notification (TCA) */ const string NT_TCA = "NT_TCA"; /** *

The structure of any notification is an OMG Structured Event. (...)

* *

For alarms, the object type value OT_AID denotes an Alarm Identifier * (AID) and is used to represent the EMS object types that are not modelled * (at the interface) but can emit alarms.

Language:English
Score: 976572.9 - https://www.itu.int/wftp3/Publ...x/x780.2/2007/itut_x780_2.html
Data Source: un