عربي | 中文 | Español | Français | Русский
Advanced Search
Home : ITU-T Home
2005-2008 ITU-T SG 6 Recommendations
L series : Construction, installation and protection of cables and other elements of outside plant
L.1 : Construction, installation and protection of telecommunication cables in public networks
L.2 : Impregnation of wooden poles
L.3 : Armouring of cables
L.4 : Aluminium cable sheaths
L.5 : Cable sheaths made of metals other than lead or aluminium
L.6 : Methods of keeping cables under gas pressure
L.7 : Application of joint cathodic protection
L.8 : Corrosion caused by alternating current
L.9 : Methods of terminating metallic cable conductors
L.10 : Optical fibre cables for duct and tunnel application
L.11 : Joint use of tunnels by pipelines and telecommunication cables, and the standardization of underground duct plans
L.12 : Optical fibre splices
L.13 : Performance requirements for passive optical nodes: Sealed closures for outdoor environments
L.14 : Measurement method to determine the tensile performance of optical fibre cables under load
L.15 : Optical local distribution networks – Factors to be considered for their construction
L.16 : Conductive plastic material (CPM) as protective covering for metal cable sheaths
L.17 : Implementation of connecting customers into the public switched telephone network (PSTN) via optical fibres
L.18 : Sheath closures for terrestrial copper telecommunication cables
L.19 : Multi-pair copper network cable supporting shared multiple services such as POTS, ISDN and xDSL
L.20 : Creation of a fire security code for telecommunication facilities
L.21 : Fire detection and alarm systems, detector and sounder devices
L.22 : Fire protection
L.23 : Fire extinction – Classification and location of fire extinguishing installations and equipment on premises
L.24 : Classification of outside plant waste
L.25 : Optical fibre cable network maintenance
L.26 : Optical fibre cables for aerial application
L.27 : Method for estimating the concentration of hydrogen in optical fibre cables
L.28 : External additional protection for marinized terrestrial cables
L.29 : As-laid report and maintenance/repair log for marinized terrestrial cable installation
L.30 : Markers on marinized terrestrial cables
L.31 : Optical fibre attenuators
L.32 : Protection devices for through-cable penetrations of fire-sector partitions
L.33 : Periodic control of fire extinction devices in telecommunication buildings
L.34 : Installation of Optical Fibre Ground Wire (OPGW) cable
L.35 : Installation of optical fibre cables in the access network
L.36 : Single-mode fibre optic connectors
L.37 : Optical branching components (non-wavelength selective)
L.38 : Use of trenchless techniques for the construction of underground infrastructures for telecommunication cable installation
L.39 : Investigation of the soil before using trenchless techniques
L.40 : Optical fibre outside plant maintenance support, monitoring and testing system
L.41 : Maintenance wavelength on fibres carrying signals
L.42 : Extending optical fibre solutions into the access network
L.43 : Optical fibre cables for buried application
L.44 : Electric power supply for equipment installed as outside plant
L.45 : Minimizing the effect on the environment from the outside plant in telecommunication networks
L.46 : Protection of telecommunication cables and plant from biological attack
L.47 : Access facilities using hybrid fibre/copper networks
L.48 : Mini-trench installation technique
L.49 : Micro-trench installation technique
L.50 : Requirements for passive optical nodes: Optical distribution frames for central office environments
L.51 : Passive node elements for fibre optic networks – General principles and definitions for characterization and performance evaluation
L.52 : Deployment of Passive Optical Networks (PON)
L.53 : Optical fibre maintenance criteria for access networks
L.54 : Splice closure for marinized terrestrial cables (MTC)
L.55 : Digital database for marine cables and pipelines
L.56 : Installation of optical fibre cables along railways
L.57 : Air-assisted installation of optical fibre cables
L.58 : Optical fibre cables: Special needs for access network
L.59 : Optical fibre cables for indoor applications
L.60 : Construction of optical/metallic hybrid cables
L.61 : Optical fibre cable installation by floating technique
L.62 : Practical aspects of unbundling services by multiple operators in copper access networks
L.63 : Safety procedures for outdoor installations
L.64 : ID tag requirements for infrastructure and network elements management
L.65 : Optical fibre distribution of access networks
L.66 : Optical fibre cable maintenance criteria for in-service fibre testing in access networks
L.67 : Small count optical fibre cables for indoor applications
L.68 : Optical fibre cable maintenance support, monitoring and testing system for optical fibre cable networks carrying high total optical power
L.69 : Personal digital assistant requirements and relevant data structure for infrastructure and network elements management
L.70 : Managing active electronics in the outside plant
L.71 : Design, construction, and installation of copper networks for broadband access including copper networks connected to optical fibre networks
L.72 : Databases for optical access network infrastructure
L.73 : Methods for inspecting and repairing underground plastic ducts
L.74 : Maintenance of cable tunnels
L.75 : Test, acceptance and maintenance methods of copper subscriber pairs, indoor network and structured cabling
L.76 : Copper loop requirements for various technologies including indoor and structured cabling
L.77 : Installation of optical fibre cables inside sewer ducts
L.78 : Optical fibre cable construction for sewer duct applications
L.79 : Optical fibre cable elements for micro-duct blowing-installation application
L.80 : Operations support system requirements for infrastructure and network elements management using ID techonology
Top - Feedback - Contact Us - Copyright © ITU 2008 All Rights Reserved Contact for this page : TSB EDH Updated : 2008-11-20
Language:English
Score: 1932084.8
-
https://www.itu.int/ITU-T/2005...06/t05_sg6_recommendations.htm
Data Source: un
(a)
(b)
(c)
(d)
(e)
(f)
(g)
A.
500 KW ON GRID SOLAR SYSTEM FOR MAIN BLOCK
SOLAR SYSTEM (PHOTOVOLTAIC)
A1
SCHEDULED ITEMS
1
26-01-d-01
Supply and Erection of Solar PV Module (Solar Panel) Mono-crystalline A-Grade (per Watt) (As per Approved Specifications) Mono Perk Half cut
1
Watt
500,000
2
26-01-m-01
Supply and Erection of hot dipped (80 microns Average) galvanized steel of minimum thickness of 12 SWG / 2.64 mm Channel / Pipe or 8 SWG / 4.06 mm Angle
1
Watt
500,000
3
26-01-i-03-d
Supply and Erection of GRID TIE INVERTER (ON-Grid Inverter)
1
Per Watt
500,000
4
26-01-g-03
Supply and Erection 1x6 sq.mm single core (XPLE/XPLO insulated/PCV sheathed) flexible copper cable
1
Rft
3,200
5
26-01-g-04
Supply and Erection 1x10sq.mm Copper cable (G/Y Flexible)
1
Rft
1,800
6
26-01-g-06
Supply and Erection 1x25sq.mm Copper cable (G/Y Flexible)
1
Rft
800
7
26-01-b-01
Supply and Erection PVC flexible pipe : 1" i/d
1
Rft
1,500
8
15-02-a-03
Supply and Erection PVC pipe for wiring purpose complete On surface including clamps etc.: 1" i/d
1
Rft
540
9
26-01-n-03
Supply and Erection of Stainless Steel Nuts and Bolts
1
Watt
500,000
10
26-01-h-01
Supply and Erection MC4 connector (TUV Approved)
1
Pair
60
11
26-01-h-02
Supply and Erection MC4 Branch connector
1
Pair
40
12
15-105-a
Supply & erection of Earth Rod
1
Each
20
A2
LT CABLES/CABLE TRAY, CONDUITS & PIPES
Supply at site, installation, testing and commissioning of PVC insulated un-armoured copper conductor cable 600 / 1000 Volt grade (or otherwise mentioned in cable description ) in prelaid conduits / trenches to be installed as per routes shown on drawings including cost of all necessary materials, connections, identification tags, cables lugs properly crimped at both ends for the following sizes complete in all respects
13
15-122-f
50 sq mm , 4 core PVC/PVC stranded copper conductor cable
1
RMtr
935
14
15-122-j
185 sq mm , 4 core PVC/PVC stranded copper conductor cable
1
RMtr
30
15
15-135-e
Supply at site, fabrication and installation of GI perforated cable tray 14 SWG 8 ft. to 10 ft. long with sides 3" high to be installed on wall, or in vertical, or above false ceiling in horizontal position or floor mounted or as shown on drawing, including cost of hanging arrangement brackets made of angle iron 38mm x 38mm x 6mm installed at every 3 ft., cost of all necessary fixing accessories, complete in all respects.(100mm*75mm)
1
Rft
1,200
16
15-135-b
Supply at site, fabrication and installation of GI perforated cable tray 14 SWG 8 ft. to 10 ft. long with sides 3" high to be installed on wall, or in vertical, or above false ceiling in horizontal position or floor mounted or as shown on drawing, including cost of hanging arrangement brackets made of angle iron 38mm x 38mm x 6mm installed at every 3 ft., cost of all necessary fixing accessories, complete in all respects.(300mm*100mm)
1
Rft.
600.00
17
24-18-C-08
Providing, laying, cutting, jointing, testing and disinfecting UPVC pressure pipeline in trenches (conforming to BS 3505 manufactured ) jointed with socket, elbow, tee, bend and plug bend etc. (...) The distribution Board shall be complete with all internal wirings, tags, identification labels, TPN and E copper busbars, accessories etc. The DB should be provided with the armored glands. (...) LT CABLES/CABLE TRAY, CONDUITS & PIPES
Supply at site, installation, testing and commissioning of PVC insulated un-armoured copper conductor cable 600 / 1000 Volt grade (or otherwise mentioned in cable description ) in prelaid conduits / trenches to be installed as per routes shown on drawings including cost of all necessary materials, connections, identification tags, cables lugs properly crimped at both ends for the following sizes complete in all respects
13
15-122-f
50 sq mm , 4 core PVC/PVC stranded copper conductor cable
1
RMtr
350
5,451.39
1,907,986.50
14
15-122-h
120 sq mm , 4 core PVC/PVC stranded copper conductor cable
1
RMtr
30
14,207.20
426,216.00
15
15-135-e
Supply at site, fabrication and installation of GI perforated cable tray 14 SWG 8 ft. to 10 ft. long with sides 3" high to be installed on wall, or in vertical, or above false ceiling in horizontal position or floor mounted or as shown on drawing, including cost of hanging arrangement brackets made of angle iron 38mm x 38mm x 6mm installed at every 3 ft., cost of all necessary fixing accessories, complete in all respects.(100mm*75mm)
1
Rft
500
900.78
450,390.00
16
15-135-b
Supply at site, fabrication and installation of GI perforated cable tray 14 SWG 8 ft. to 10 ft. long with sides 3" high to be installed on wall, or in vertical, or above false ceiling in horizontal position or floor mounted or as shown on drawing, including cost of hanging arrangement brackets made of angle iron 38mm x 38mm x 6mm installed at every 3 ft., cost of all necessary fixing accessories, complete in all respects.(300mm*100mm)
1
Rft.
250.00
1350.33
337,582.50
17
24-18-C-08
Providing, laying, cutting, jointing, testing and disinfecting UPVC pressure pipeline in trenches (conforming to BS 3505 manufactured ) jointed with socket, elbow, tee, bend and plug bend etc.
Language:English
Score: 1912112
-
https://www.unhcr.org/pk/wp-co...of-DHQ-Hospital-D.I.Khan_.xlsx
Data Source: un
SCHEDULED ITEMS
1
26-01-d-01
Supply and Erection of Solar PV Module (Solar Panel) Mono-crystalline A-Grade (per Watt) (As per Approved Specifications) Mono Perk Half cut
1
Watt
250,000
2
26-01-m-01
Supply and Erection of hot dipped (80 microns Average) galvanized steel of minimum thickness of 12 SWG / 2.64 mm Channel / Pipe or 8 SWG / 4.06 mm Angle
1
Watt
250,000
3
26-01-i-03-d
Supply and Erection of GRID TIE INVERTER (ON-Grid Inverter)
1
Per Watt
250,000
4
26-01-g-03
Supply and Erection 1x6 sq.mm single core (XPLE/XPLO insulated/PCV sheathed) flexible copper cable
1
Rft
2,000
5
26-01-g-04
Supply and Erection 1x10sq.mm Copper cable (G/Y Flexible)
1
Rft
1,000
6
26-01-g-06
Supply and Erection 1x25sq.mm Copper cable (G/Y Flexible)
1
Rft
250
7
26-01-b-01
Supply and Erection PVC flexible pipe : 1" i/d
1
Rft
800
8
15-02-a-03
Supply and Erection PVC pipe for wiring purpose complete On surface including clamps etc.: 1" i/d
1
Rft
540
9
26-01-n-03
Supply and Erection of Stainless Steel Nuts and Bolts
1
Watt
250,000
10
26-01-h-01
Supply and Erection MC4 connector (TUV Approved)
1
Pair
50
11
26-01-h-02
Supply and Erection MC4 Branch connector
1
Pair
35
12
15-105-a
Supply & erection of Earth Rod
1
Each
20
B.
LT CABLES/CABLE TRAY, CONDUITS & PIPES
Supply at site, installation, testing and commissioning of PVC insulated un-armoured copper conductor cable 600 / 1000 Volt grade (or otherwise mentioned in cable description ) in prelaid conduits / trenches to be installed as per routes shown on drawings including cost of all necessary materials, connections, identification tags, cables lugs properly crimped at both ends for the following sizes complete in all respects
13
15-122-f
50 sq mm , 4 core PVC/PVC stranded copper conductor cable
1
RMtr
50
14
15-122-i
150 sq mm , 4 core PVC/PVC stranded copper conductor cable
1
RMtr
60
15
15-135-e
Supply at site, fabrication and installation of GI perforated cable tray 14 SWG 8 ft. to 10 ft. long with sides 3" high to be installed on wall, or in vertical, or above false ceiling in horizontal position or floor mounted or as shown on drawing, including cost of hanging arrangement brackets made of angle iron 38mm x 38mm x 6mm installed at every 3 ft., cost of all necessary fixing accessories, complete in all respects.(100mm*75mm)
1
Rft
300
16
15-135-b
Supply at site, fabrication and installation of GI perforated cable tray 14 SWG 8 ft. to 10 ft. long with sides 3" high to be installed on wall, or in vertical, or above false ceiling in horizontal position or floor mounted or as shown on drawing, including cost of hanging arrangement brackets made of angle iron 38mm x 38mm x 6mm installed at every 3 ft., cost of all necessary fixing accessories, complete in all respects.(300mm*100mm)
1
Rft.
200.00
17
24-18-C-08
Providing, laying, cutting, jointing, testing and disinfecting UPVC pressure pipeline in trenches (conforming to BS 3505 manufactured ) jointed with socket, elbow, tee, bend and plug bend etc. (...) The distribution Board shall be complete with all internal wirings, tags, identification labels, TPN and E copper busbars, accessories etc. The DB should be provided with the armored glands.
Language:English
Score: 1858753.7
-
https://www.unhcr.org/pk/wp-co...han-Refugees-CAR-Peshawar.xlsx
Data Source: un
SCHEDULED ITEMS
1
26-01-d-01
Supply and Erection of Solar PV Module (Solar Panel) Mono-crystalline A-Grade (per Watt) (As per Approved Specifications) Mono Perk Half cut
1
Watt
450,000
2
26-01-m-01
Supply and Erection of hot dipped (80 microns Average) galvanized steel of minimum thickness of 12 SWG / 2.64 mm Channel / Pipe or 8 SWG / 4.06 mm Angle
1
Watt
450,000
3
26-01-i-03-d
Supply and Erection of GRID TIE INVERTER (ON-Grid Inverter)
1
Per Watt
450,000
4
26-01-g-03
Supply and Erection 1x6 sq.mm single core (XPLE/XPLO insulated/PCV sheathed) flexible copper cable
1
Rft
2,800
5
26-01-g-04
Supply and Erection 1x10sq.mm Copper cable (G/Y Flexible)
1
Rft
1,600
6
26-01-g-06
Supply and Erection 1x25sq.mm Copper cable (G/Y Flexible)
1
Rft
550
7
26-01-b-01
Supply and Erection PVC flexible pipe : 1" i/d
1
Rft
1,400
8
15-02-a-03
Supply and Erection PVC pipe for wiring purpose complete On surface including clamps etc.: 1" i/d
1
Rft
540
9
26-01-n-03
Supply and Erection of Stainless Steel Nuts and Bolts
1
Watt
450,000
10
26-01-h-01
Supply and Erection MC4 connector (TUV Approved)
1
Pair
50
11
26-01-h-02
Supply and Erection MC4 Branch connector
1
Pair
35
12
15-105-a
Supply & erection of Earth Rod
1
Each
20
B.
LT CABLES/CABLE TRAY, CONDUITS & PIPES
Supply at site, installation, testing and commissioning of PVC insulated un-armoured copper conductor cable 600 / 1000 Volt grade (or otherwise mentioned in cable description ) in prelaid conduits / trenches to be installed as per routes shown on drawings including cost of all necessary materials, connections, identification tags, cables lugs properly crimped at both ends for the following sizes complete in all respects
13
15-122-f
50 sq mm , 4 core PVC/PVC stranded copper conductor cable
1
RMtr
720
14
15-122-j
185 sq mm , 4 core PVC/PVC stranded copper conductor cable
1
RMtr
30
15
15-135-e
Supply at site, fabrication and installation of GI perforated cable tray 14 SWG 8 ft. to 10 ft. long with sides 3" high to be installed on wall, or in vertical, or above false ceiling in horizontal position or floor mounted or as shown on drawing, including cost of hanging arrangement brackets made of angle iron 38mm x 38mm x 6mm installed at every 3 ft., cost of all necessary fixing accessories, complete in all respects.(100mm*75mm)
1
Rft
1,000
16
15-135-b
Supply at site, fabrication and installation of GI perforated cable tray 14 SWG 8 ft. to 10 ft. long with sides 3" high to be installed on wall, or in vertical, or above false ceiling in horizontal position or floor mounted or as shown on drawing, including cost of hanging arrangement brackets made of angle iron 38mm x 38mm x 6mm installed at every 3 ft., cost of all necessary fixing accessories, complete in all respects.(300mm*100mm)
1
Rft.
350.00
17
24-18-C-08
Providing, laying, cutting, jointing, testing and disinfecting UPVC pressure pipeline in trenches (conforming to BS 3505 manufactured ) jointed with socket, elbow, tee, bend and plug bend etc. (...) The distribution Board shall be complete with all internal wirings, tags, identification labels, TPN and E copper busbars, accessories etc. The DB should be provided with the armored glands.
Language:English
Score: 1858753.7
-
https://www.unhcr.org/pk/wp-co...DHQ-Hospital-Lakki-Marwat.xlsx
Data Source: un
Installation of wiring
m
9,220.00
5.
Wires with copper cores GDP 2x1.5
m
1,800.00
6.
Wires with copper cores GDP 3x1.5
m
3,000.00
7.
Wires with copper cores GDP 3x2.5
m
4,200.00
8.
Cable with copper cores VVG 5х2,5
m
100.00
9.
(...) Installation of electrical wiring
m
2000,00
5.
Wire with copper cores GDP 2x1.5
m
450,00
6.
Wire with copper cores GDP 3x2.5
m
1500,00
7.
Language:English
Score: 1785673.4
-
https://www.unhcr.org/ua/wp-co...orod-2-LOTS-ENG-rev01Ka-1.xlsx
Data Source: un
LT CABLES/CABLE TRAY, CONDUITS & PIPES
Supply at site, installation, testing and commissioning of PVC insulated un-armoured copper conductor cable 600 / 1000 Volt grade (or otherwise mentioned in cable description ) in prelaid conduits / trenches to be installed as per routes shown on drawings including cost of all necessary materials, connections, identification tags, cables lugs properly crimped at both ends for the following sizes complete in all respects
13
15-122-g
70 sq mm , 4 core PVC/PVC stranded copper conductor cable
1
RMtr
80
14
15-122-j
185 sq mm , 4 core PVC/PVC stranded copper conductor cable MDB Solar Panel to Existing LT Panel Busbar and From Existing LT Panel to Transformer (Optional)
1
RMtr
50
15
15-135-e
Supply at site, fabrication and installation of GI perforated cable tray 14 SWG 8 ft. to 10 ft. long with sides 3" high to be installed on wall, or in vertical, or above false ceiling in horizontal position or floor mounted or as shown on drawing, including cost of hanging arrangement brackets made of angle iron 38mm x 38mm x 6mm installed at every 3 ft., cost of all necessary fixing accessories, complete in all respects.(100mm*75mm)
1
Rft
3,000
16
15-135-b
Supply at site, fabrication and installation of GI perforated cable tray 14 SWG 8 ft. to 10 ft. long with sides 3" high to be installed on wall, or in vertical, or above false ceiling in horizontal position or floor mounted or as shown on drawing, including cost of hanging arrangement brackets made of angle iron 38mm x 38mm x 6mm installed at every 3 ft., cost of all necessary fixing accessories, complete in all respects.(300mm*100mm)
1
Rft.
800.00
17
24-18-C-08
Providing, laying, cutting, jointing, testing and disinfecting UPVC pressure pipeline in trenches (conforming to BS 3505 manufactured ) jointed with socket, elbow, tee, bend and plug bend etc. (...) Spec. 8001 , 8133, 8212, 8240, 8290)
20
NS-01
Providing and fixing Lightning Arrestor 1" Copper rod 6ft long with 4'' Bowl five spikes complete in all respect (above top structure level)
1
No.
10
21
NS-02
Providing and fixing Earth Connecting Point 12"x1.5"x 6-8mm insulators with complete Accessories.
1
No
10
22
NS-03
Providing and fixing of 75mmx10mm copper Busbar in addition with Existing LT Panel Busbar RYB
1
RFT
60
23
NS-04
MAIN DISTRIBUTION BOX
LT Panel shall be made from 14 SWG sheet steel, while all other DBs must be of 14SWG. (...) The distribution Board shall be complete with all internal wirings, tags, identification labels, TPN and E copper busbars, accessories etc. The DB should be provided with the armored glands.
Language:English
Score: 1686383.6
-
https://www.unhcr.org/pk/wp-co...ion-THQ-Hospital-Chakdara.xlsx
Data Source: un
The case studies to be discussed will be the Hidrosogamoso Dam in Colombia as described by FORUM MENSCHENRECHTE and the Tampakan gold and copper mine in the Philippines , as presented by the submission by Franciscans International to the HRC (see below). (...) In connection with the dam, bridges, streets, transmission lines and pipelines are constructed. Dam construction is largely complete and the start of flooding immanent.
(...) Jobs which were created for indigenous people are characterized by unsecure work conditions, poor payment, and arbitrary dismissals.
· Disappearance of social leaders: in 2012 alone, 11 leaders of local protest movements disappeared, 6 were found dead, without thorough investigation or convictions.
· Meetings with the local people scheduled for 13 June 2014 to discuss solutions did not take place as the expected high level representatives of the government and the company did not come.
2) The Tampakan Copper-Gold Project / Cotabato, Philippines
Information provided in A/HRC/26/NGO/94; excerpts:
The Tampakan Copper-Gold Project is reportedly the 7th largest undeveloped copper mine in the world, and when operational, it will be one of the largest copper-gold mines in Souteast Asia.
Language:English
Score: 1629999.7
-
https://www.ohchr.org/sites/de...allelEvents/1December_FES.docx
Data Source: un
Relationships
( IEC SC46C - copper cables
( IEC SC86A - optical cables
( IEC SC86B - optical components
( IEC SC86C - optical subsystems
( ISO 14000 series
Deliverables
Recommendations of important environmental aspects resulting from:
( Life cycle analysis of optical cables 2001
( Life cycle analysis of copper cables 2002
( Life cycle analysis of optical components 2002
( Life cycle analysis of poles 2002
QUESTION 2/6 Fire safety of telecommunication installations (Continuation of Question 2/6)
Background and Justification
Fire safety has been studied in respect of telecommunication buildings. (...) There is now a trend to support multiple services of one or more providers on common cables (copper and optical) and in other parts of the network. (...) Study items
( Optical fibre cables for access network.
( Optical fibre cables for aerial application.
( Indoor optical cables.
( Optical/Copper hybrid cables for power feeding to outside active equipment.
Language:English
Score: 1627654.1
-
https://www.itu.int/ITU-T/2001-2004/com06/questions-sg6.doc
Data Source: un
L.18
Sheath closures for terrestrial copper telecommunication cables - ITU-T (10/1996)
Summary
This Recommendation deals with the design of cable sheath closures for copper cables used in telecommunication networks, in duct, tunnel, buried surface troughing and aerial installations, and with mechanical and environmental characteristics of sheath closures for copper cable.
(...) Furthermore, some issues for the use of multi-pair copper network cable supporting shared multiple services such as ISDN/xDSL are also described.
(...) L.47
Access facilities using hybrid fibre/copper networks (10/2000)
Summary
This Recommendation gives information and guidelines about access facilities using HFC ("Hybrid Fibre/Copper") networks.
Language:English
Score: 1598741.4
-
https://www.itu.int/dms_pub/it...tut/T-TUT-L-2008-GLR-MSW-E.doc
Data Source: un
Тон Caparol “Off White 25 L96.C5.H101” або аналог (робота з матеріалом)
m2 / м2
712
Engineering networks / Інженерні мережі
Power supply networks / Мережі електропостачання
1
Punching holes in brick walls and ceilings for the passage of electrical wiring
Пробивання отворів в стінах цегляних та перекритті під проходження електропроводки
pcs / шт
10
2
Installation of electrical wiring in boxes along the walls
Монтаж електропроводки в коробах по стінах
m / м.п.
340
3
Wire with copper cores GDP 3x2.5
Провід з мідними жилами ВВП 3х2,5
m / м.п.
200
4
Cable with VVG copper cores 5x16
Кабель з мідними жилами ВВГ 5х16
m / м.п.
100
4
Cable with VVG copper cores 5x4
Кабель з мідними жилами ВВГ 5х4
m / м.п.
40
5
The box is plastic
Короб пластиковий
m / м.п.
300
6
Installation of junction boxes
Монтаж коробок розгалуджувальних
pcs / шт
5
7
Junction box
Коробка розгалуджувальна
pcs / шт
5
8
Installation of sockets of open installation
Монтаж розеток відкритого встановлення
pcs / шт
12
9
The socket is double, open installation, white color
Розетка подвійна відкритого встановлення білого кольору
pcs / шт
12
10
Installation of the switchboard in a set
Монтаж щита розподільчого в коплекті
pcs / шт
2
11
Switchboard in a set: metal box type НЧО(в)-24, DIN rail, automatic switch ВА51/16 – 3 pcs / шт., ВА53/16 – 2 pcs / шт., differential switch 4-pole 32A, Ispru 30mmA – 1pc.
(...) Тон Caparol “Off White 25 L96.C5.H101” або аналог (робота з матеріалом)
m2 / м2
145,00
Engineering networks / Інженерні мережі
Power supply networks / Мережі електропостачання
1
Punching holes in brick walls and ceilings for the passage of electrical wiring
Пробивання отворів в стінах цегляних та перекритті під проходження електропроводки
pcs/шт
200
2
Installation of electrical wiring in boxes along the walls
Монтаж електропроводки в коробах по стінах
m / м
1500
3
Wire with copper cores GDP 3x2.5
Провід з мідними жилами ВВП 3х2,5
m / м
1500
4
Cable with VVG copper cores 5x25
Кабель з мідними жилами ВВГ 5х25
m / м
120
5
The box is plastic
Короб пластиковий
m / м
1000
6
Installation of junction boxes
Монтаж коробок розгалуджувальних
pcs/шт
10
7
Junction box
Коробка розгалуджувальна
pcs/шт
10
8
Installation of sockets of open installation
Монтаж розеток відкритого встановлення
pcs/шт
72
9
The socket is double, open installation, white color
Розетка подвійна відкритого встановлення білого кольору
pcs/шт
72
10
Installation of the switchboard in a set
Монтаж щита розподільчого в коплекті
pcs/шт
2
11
Switchboard in a set: metal box of type НЧО(в)-24, DIN rail, automatic switch ВА51/16 – 17 pcs., differential switch 4-pole 50A, Ispru 30mmA – 1 pc.
(...) Демонтаж санприладів (унітази, умивальники, душкабіни, бойлери, змішувачі).
pcs / шт
60
Engineering networks / Інженерні мережі
Power supply networks / Мережі електропостачання
1
Punching holes in brick walls and ceilings for the passage of electrical wiring
Пробивання отворів в стінах цегляних та перекритті під проходження електропроводки
pcs / шт
200
2
Installation of electrical wiring in boxes along the walls
Монтаж електропроводки в коробах по стінах
m / м
1790
3
Wire with copper cores GDP 3x2.5
Провід з мідними жилами ВВП 3х2,5
m / м
1500
4
Cable with VVG copper cores 5x16
Кабель з мідними жилами ВВГ 5х16
m / м
170
5
Cable with VVG copper cores 5x25
Кабель з мідними жилами ВВГ 5х25
m / м
120
6
The box is plastic
Короб пластиковий
m / м
1500
7
Installation of junction boxes
Монтаж коробок розгалуджувальних
pcs / шт
10
8
Junction box
Коробка розгалуджувальна
pcs / шт
10
9
Installation of sockets of open installation
Монтаж розеток відкритого встановлення
pcs / шт
90
10
The socket is double, open installation, white color
Розетка подвійна відкритого встановлення білого кольору
pcs / шт
90
11
Installation of the switchboard in a set
Монтаж щита розподільчого в коплекті
pcs / шт
5
12
Switchboard in the set: metal box of type НЧО(в)-24, DIN rail, automatic switch ВА51/16 – 7 pcs., 4-pole differential switch 32A, Ispru 30mmA – 1 pc.
Language:English
Score: 1566786.1
-
https://www.unhcr.org/ua/wp-co...KR_Chernivtsy-CC-3-Lots-1.xlsx
Data Source: un