industrial waste heat to supply new city district in Hamburg Germany
Level: national and local
Summary (...) the support from federal level, the economic viability of a project to supply a new city district
in Hamburg (...) with waste heat from a copper production plant was secured.
Situation At the port of Hamburg a new city
Language:English
Score: 2292716.8
-
https://unece.org/DAM/RCM_Webs.../Case_Study_SDG7_1_Germany.pdf
Data Source: un
/3), held in Hamburg (Germany) in 1999.
GE.06-
ECE/CP.TEIA/2006/10 ECE/MP.WAT/2006/9 Page 2
2. When (...) adopting the Hamburg conclusions and recommendations, the governing bodies of the Water Convention (...) to a questionnaire on implementation of the Hamburg seminar recommendations in market-economy countries of the UNECE
Language:English
Score: 2167241
-
https://unece.org/fileadmin/DA...06/wat/ece.mp.wat.2006.9.e.pdf
Data Source: un
MONITORING OF DEVELOPMENTS RELEVANT FOR THE PAN-EUROPEAN TRANSPORT CORRIDORS AND AREAS : INFRASTRUCTURE BOTTLENECKS AND MISSING LINKS / TRANSMITTED BY THE GOVERNMENT OF GERMANY
and
Outer Elbe
Hamburg – North
Sea
8.000 TEU
Container vessel
qualitative
bottleneck (profile (...) Costs
(Mio. €)
Operational
by year
1 2 3 4 5 6 7 8 9
Hamburg/Bremen
– Hannover
track partly (...)
between the lines
Hamburg – Bremen and
Celle – Hannover for 200
km/h
1.284 open
Rotenburg
Language:English
Score: 2107767.4
-
daccess-ods.un.org/acce...RANS/WP.5/2005/16/ADD.6&Lang=E
Data Source: ods
REPORT OF THE SEMINAR : COMMITTEE ON ENVIRONMENTAL POLICY, MEETING OF THE SIGNATORIES TO THE CONVENTION ON THE TRANSBOUNDARY EFFECTS OF INDUSTRIAL ACCIDENTS, MEETING OF THE PARTIES TO THE CONVENTION ON THE PROTECTION AND USE OF TRANSBOUNDARY WATERCOURSES AND INTERNATIONAL LAKES, SEMINAR ON THE PREVENTION OF CHEMICAL ACCIDENTS AND LIMITATION OF THEIR IMPACT ON TRANSBOUNDARY WATERS, HAMBURG, GERMANY, 4-6 OCTOBER 1999
OF THEIR IMPACT ON TRANSBOUNDARY WATERS
(Hamburg, Germany, 4-6 October 1999)
REPORT OF THE SEMINAR (...) of their
Impact on Transboundary Waters was held in Hamburg (Germany) from 4 to 6 October
1999 at the invitation (...) for the Protection of
the River Rhine and the International Commission for the Protection of the River
Elbe
Language:English
Score: 2080664.6
-
HTTP://DACCESS-ODS.UN.ORG/ACCE...S=CEP/WG.4/SEM.1/1999/3&LANG=E
Data Source: ods
the twentieth anniversary of the establishment of the International Tribunal for the Law of the Sea, in Hamburg (...) of the City of Hamburg, for their warm welcome.
The Free and Hanseatic City of Hamburg is indelibly linked (...) with the world’s oceans. For centuries, merchants have looked to its harbour at the mouth of the Elbe River
Language:English
Score: 2072239.5
-
https://www.un.org/press/en/2016/sgsm18182.doc.htm
Data Source: un
of Chemical Accidents and the Limitation of Their Impact on Transboundary Waters (Hamburg, 4-6 October 1999 (...) on the implementation of the conclusions and recommendations of the Hamburg seminar (ECE/CP.TEIA/2006/10 – ECE/MP.WAT (...) :
(a) UNECE regional safety guidelines (e.g. recommendations of the Hamburg
seminar);
(b) Safety guidelines
Language:English
Score: 2057385.4
-
https://unece.org/fileadmin/DA...06/wat/ece.mp.wat.2006.7.e.pdf
Data Source: un
Syrischer Flüchtling findet sicheren Hafen in Hamburg – UNHCR Deutschland
Brauchen Sie Hilfe (...)
Start
Syrischer Flüchtling findet sicheren Hafen in Hamburg
Majed floh nach Deutschland und folgt seinem (...) Karrieretraum in Deutschlands größtem Seehafen
Von Josie Le Blond in Hamburg | 18 Februar 2020
Der syrische
Language:English
Score: 2017236.3
-
https://www.unhcr.org/dach/de/...sicheren-hafen-in-hamburg.html
Data Source: un
Syrischer Flüchtling findet sicheren Hafen in Hamburg – UNHCR Österreich
Informationen für (...) durchsuchen
Suche schließen
Home
Syrischer Flüchtling findet sicheren Hafen in Hamburg
Majed floh nach (...) Deutschland und folgt seinem Karrieretraum in Deutschlands größtem Seehafen
Von Josie Le Blond in Hamburg
Language:English
Score: 2017236.3
-
https://www.unhcr.org/dach/at/...sicheren-hafen-in-hamburg.html
Data Source: un
STUDY OF THE ESTABLISHMENT OF THE DANUBE-ODER (ELBE) CONNECTION / SUBMITTED BY THE GOVERNMENT OF THE CZECH REPUBLIC
:
Szczecin (via the Oder) by 48 per cent
Szczecin (via the Elbe) by 40 per cent
Hamburg by 36 per cent
Bremen (...) 3 (c))
STUDY OF THE ESTABLISHMENT OF
THE DANUBE-ODER (ELBE) CONNECTION
Submitted by the Government (...) concerning the opinion of the Government of Germany on the economic
assessment of the Danube-Oder-Elbe
Language:English
Score: 1984359
-
daccess-ods.un.org/acce...pen&DS=TRANS/SC.3/R.163&Lang=E
Data Source: ods
REPORT ON THE IMPLEMENTATION OF THE CONCLUSIONS AND RECOMMENDATIONS OF THE SEMINAR ON THE PREVENTION OF CHEMICAL ACCIDENTS AND LIMITATION OF THEIR IMPACT ON TRANSBOUNDARY WATERS / SUBMITTED BY THE CO-CHAIRPERSONS OF THE JOINT EXPERT GROUP
/SEM.1/1999/3), held in Hamburg (Germany) in 1999.
ECE/CP.TEIA/2006/10
ECE/MP.WAT/2006/9
Page 2 (...)
2. When adopting the Hamburg conclusions and recommendations, the governing bodies of
the Water (...) on answers to a questionnaire on implementation of the Hamburg
seminar recommendations in market-economy
Language:English
Score: 1983841
-
HTTP://DACCESS-ODS.UN.ORG/ACCE...&DS=ECE/CP.TEIA/2006/10&LANG=E
Data Source: ods