THE BRICK INDUSTRY
A brief description of the brickworks and clay
deposits in West Africa
V. Detailed calculation of briok production in West Africa
VI* Graphs 2-3-4-5-6
THE BRICK INDUSTRY
I. (...)
(1) The cost of products from brickworks is approximately'"US$18
per ton, and the cost.of transport approximately 6 cents per ton/kilometer,
whioh meansj that over a distance of 300 kilometers from the brickworks,
bricks are double their price, Transport costs make bricks very expensive,
and for this reason import-export.does .not play an essential role.-. (...) According to that table production will reach a total of
320,000 tons a year when the new brickworks are completed and come into
production.
Language:English
Score: 1662822.9
-
https://daccess-ods.un.org/acc...open&DS=E/CN.14/INR/124&Lang=E
Data Source: ods
It is recalled that the installation of the air-conditioning system also includes the brickwork for the housing of the equipment, located at the back of the building.
5. (...) This delay is the result, on the one hand, of the time needed both to assess the bids and perform the usual administrative and financial formalities required for any contract and, on the other, of the difficulties that the chosen enterprise encountered in Islamabad in obtaining all the guarantees required under the contract from the supplier of the air-conditioning equipment.
Language:English
Score: 1565257.8
-
https://www.ilo.org/public/eng...ds/relm/gb/docs/gb270/bs-2.htm
Data Source: un
It is recalled that the installation of the air-conditioning system also includes the brickwork for the housing of the equipment, located at the back of the building.
5. (...) This delay is the result, on the one hand, of the time needed both to assess the bids and perform the usual administrative and financial formalities required for any contract and, on the other, of the difficulties that the chosen enterprise encountered in Islamabad in obtaining all the guarantees required under the contract from the supplier of the air-conditioning equipment.
Language:English
Score: 1565257.8
-
www.ilo.org/public/engl...ds/relm/gb/docs/gb270/bs-2.htm
Data Source: un
The entire vertical structure, which comprises the curved brickwork exterior of the building and concentric side walls are complete, making it possible to install the metal structures that will support the quadrant-shaped roof. (...) The cost of installing the air-conditioning system, including brickwork on the housing for the equipment, is estimated at 14,182,000 rupees, that is, some 353,000 dollars.
5.
Language:English
Score: 1502110.2
-
www.ilo.org/public/engl...ds/relm/gb/docs/gb268/bs-2.htm
Data Source: un
The entire vertical structure, which comprises the curved brickwork exterior of the building and concentric side walls are complete, making it possible to install the metal structures that will support the quadrant-shaped roof. (...) The cost of installing the air-conditioning system, including brickwork on the housing for the equipment, is estimated at 14,182,000 rupees, that is, some 353,000 dollars.
5.
Language:English
Score: 1502110.2
-
https://www.ilo.org/public/eng...ds/relm/gb/docs/gb268/bs-2.htm
Data Source: un
IDENTICAL LETTERS DATED 2003/01/30 FROM THE PERMANENT REPRESENTATIVE OF IRAQ TO THE UNITED NATIONS ADDRESSED TO THE SECRETARY-GENERAL AND THE PRESIDENT OF THE SECURITY COUNCIL
A first group, composed of three inspectors, left the Canal Hotel in Baghdad at
9 a.m. and arrived at Nahrawan, 40 kilometres east of Baghdad. The group
performed radiation surveys of the complex of tanneries and brickworks and of a
military unit on the same site. (...) Using portable equipment, the group also
performed radiation surveys of the company in order to detect any radiation alleged
to exist. (...) The group met the
factory’s director and questioned him about the number of employees and engineers
and the types of tests performed in the quality control laboratory. The group also
inspected tagged equipment.
Language:English
Score: 1449066.5
-
daccess-ods.un.org/acce.../get?open&DS=S/2003/133&Lang=E
Data Source: ods
The construction work on the pilasters has been completed and the breast walls for the windows as well as the brickwork on the different floors has been completed up to the third floor.
Language:English
Score: 1402192
-
www.ilo.org/public/engl...ds/relm/gb/docs/gb270/bs-1.htm
Data Source: un
The construction work on the pilasters has been completed and the breast walls for the windows as well as the brickwork on the different floors has been completed up to the third floor.
Language:English
Score: 1402192
-
https://www.ilo.org/public/eng...ds/relm/gb/docs/gb270/bs-1.htm
Data Source: un
PETITIONS CONCERNING THE CAMEROONS UNDER FRENCH ADMINISTRATION : OBSERVATIONS OF THE FRENCH GOVERNMENT AS ADMINISTERING AUTHORITY
Djete Prosper (T/FET.5/813 and Add.1)
Petition from the Centr&l CoL.mittee of the Union des populations
du Cameroun of Koumassi (T/PET.5/821)
Petition from the regional branch of the Union des populations
du Cameroun of Nyong and Sanaga (T/PET.J/823)
Petition from the Central Committee of the Union des populations
du Cameroun at Pouma (T/PET.5/824)
Petition from the Committee of Refugees belonging to the
Union des populations du Cameroun (T/FET.5/827)
Petition from central committees of Sameka, Bameniou and
Batcha (T/PET.5/828) .
3
4
Petition from the Obala Central Committee of the Union des populations
du Cameroun (T/PET. 5/833) · 1
Petition from the Brickworks Local Committee, Yaounde (T/PET.5/834)
Petition from the Union des populations du Cameroun,
Bamileke branch (T/FET.5/836)
Petition from the Office of the Executive Ccmmittee of the
Union des populations du Cameroun (T/PET,5/838)
Petition from Mr. (...) ugees belonging to the
Union des populations du Cameroun (T/PET,5/827)
Petition from central committees ot Sameka, Bameniou and Batcha (T/PET,5/828)
Petition from the Obala Central Committee of the Union des populations
du Cameroun (T/PET,J/~55) -
Petition from the Brickworks Local Committee, Yaou~de (T/PET,5/834)
Petition from the Union des populations du Cameroun,
BamilekP. branch (T/PET,5/836)
Petition from the Office of the Executiv~ Committee of the
Union des populations du Cameroun (T/PET,5/838)
Petition from Mr.

Language:English
Score: 1340436.1
-
https://daccess-ods.un.org/acc.../get?open&DS=T/OBS.5/81&Lang=E
Data Source: ods
He made a special reference to the ILO conventions that “form the brickwork of the national labour law in Russia, undoubtedly a major mission of the ILO which is, in a sense, a worldwide labour parliament”.
Language:English
Score: 1305347.3
-
www.ilo.org/moscow/news...WCMS_679817/lang--en/index.htm
Data Source: un