Home

Results 1 - 10 of 567,012 for correct measurement. Search took 2.814 seconds.  
Sort by date/Sort by relevance
FAQ UNITED NATIONS | DEPARTMENT OF OPERATIONAL SUPPORT 3 SHOULD CORRECTIONS GPP UNDERGO QUARANTINE MEASURES BEFORE LEAVING THE MISSION? Only in cases where a contributing country has not set quarantine measures on their own, corrections GPP who are being repatriated shall undergo a 14-day quarantine period in the mission before leaving. (...) WHAT MEASURES APPLY TO CORRECTIONS GPP IN THEIR HOME COUNTRY WHEN ARRIVING FOR CTO/ANNUAL LEAVE?
Language:English
Score: 1116661.1 - https://www.un.org/sites/un2.u...ernment-provided_personnel.pdf
Data Source: un
FAQ UNITED NATIONS | DEPARTMENT OF OPERATIONAL SUPPORT 3 SHOULD CORRECTIONS GPP UNDERGO QUARANTINE MEASURES BEFORE LEAVING THE MISSION? Only in cases where a contributing country has not set quarantine measures on their own, corrections GPP who are being repatriated shall undergo a 14-day quarantine period in the mission before leaving. (...) WHAT MEASURES APPLY TO CORRECTIONS GPP IN THEIR HOME COUNTRY WHEN ARRIVING FOR CTO/ANNUAL LEAVE?
Language:English
Score: 1116661.1 - https://www.un.org/sites/un2.u...ernment-provided_personnel.pdf
Data Source: un
Plenipotentiary Conference (PP-06) 16.11.07 03.03.10 DECISION 10 (ANTALYA, 2006) Implementation of additional corrective measures relating to cost recovery for satellite network filings The Plenipotentiary Conference of the International Telecommunication Union (Antalya, 2006), considering a) the revision of the methodology and scale of charges for cost recovery for the processing of satellite network filings established in Decision 482, as modified by the Council at its 2002 session; b) that, in Decision 513, Council-03 agreed on the need to address this issue on a temporary basis, pending a review of the charging methodology by Council-04; c) that the application of Decision 513 still resulted in some invoices having values significantly higher than CHF 100 000; d) that Council-04 did not adopt a new charging methodology; e) that Council-05 identified and corrected several anomalies regarding the cost-recovery fees for satellite network filings with invoices issued in the 2004-2005 biennium; f) that corrective measures set forth in some Council-05 decisions for invoices issued for the 2002-2003 period were not implementable due to the closure of the accounts for 2002-2003, noting a) that Council-06 instructed the Secretary-General to transmit to the Plenipotentiary Conference (Antalya, 2006) the relevant matters relating to the implementation of cost recovery for satellite network filings (C-05 Decision 531, C-05 Decision 532, C-05 Decision 534) for which invoices were issued during the 2002-2003 period, and which were subject to actions by Council-05; b) that the Radio Regulations Board (RRB), at its 41st meeting (Geneva, 4-8 September 2006), concluded that the publication of special sections pertaining to the coordination of some satellite networks was not correct, and therefore requested the cancellation of the relevant invoices issued during the 2002-2003 period, decides 1 to implement the corrective measures set forth in Council-05 Decisions 531, 532 and 534 and in the RRB decision (41st meeting, Geneva, 4-8 September 2006) in respect of invoices issued for the 2002-2003 period, taking into account considering f) above; 2 that, in respect of those satellite network filings affected by decides 1 above, and not nominated for the free entitlement, the Radiocommunication Bureau shall issue revised invoices and shall credit the responsible administration, as appropriate; Plenipotentiary Conference (PP-06) Antalya, 6-24 November 2006 - 2/2 - 16.11.07 03.03.10 3 to withdraw the amount of CHF 6 204 956.40 from the Reserve Account, noting, however, that Decision 5 (Rev. Antalya, 2006) of this conference requires that in no circumstances should the Reserve Account be reduced below three per cent as a result of the present decision. __________ Plenipotentiary Conference (PP-06) DECISION 10 (ANTALYA, 2006) Implementation of additional corrective measures relating to cost recovery for satellite network filings
Language:English
Score: 1096112.7 - https://www.itu.int/en/ITU-R/space/Documents/D10-E.pdf
Data Source: un
The condition or quality of being true, correct, or exact. Freedom from error or defect. Set or make true, accurate, or right. (...) Accuracy means the degree of difference between the truth and the Accuracy / Correctness present. This trust attribute does not imply the ability to measure the environment correctly or the ability to correct the error, but implies the willingness to measure the truth. A physical thing with appropriate sensors and a cyber object not infected by any viruses might have accuracy and they give the correct data to other. Steadfast adherence to the same principles, course, form, etc.
Language:English
Score: 1078270.2 - https://www.itu.int/en/publica.../files/basic-html/page265.html
Data Source: un
Country# Children in detention Facility 1 2 3 4 5 6 7 8 17 Boys Girls Total Albania Juvenile detention facility Penitentiary Detention centre Pretrial detention centre Four correctional education boarding schools and one juvenile prison Closed correctional facility The Centre for Children and Youth ‘Ljubovic’ Correctional facility Correctional facility Ministry of Justice Ministry of Justice Ministry of Justice Ministry of Education Ministry of Justice Ministry of Justice Ministry of Labour and Social Welfare Department of Penitentiary Services Ministry of Justice 11 95 130 24 6 40 16 12 4 2 142 28 8 40 Armenia Azerbaijan Bulgaria Table 1 Managed by 0504 FOR EVERY CHILD, JUSTICE correctional facilities, and other justice sector stakeholders and relevant authorities, including local organizations working with children in contact with the justice system. (...) All 23 correctional facilities received materials to inform children and adolescents about the daily life of their parents in prison and alleviate the fears and concerns of children. (...) While no children have been released in Bulgaria, the country office used the Technical Note to advocate with and support the National Ombudsperson’s recommendations to the Ministry of Education on measures to ensure the safety of children placed in the four correctional educational boarding schools in the country.
Language:English
Score: 1068590.4 - https://www.unicef.org/media/9...tice-COVID-Case-Studies-21.pdf
Data Source: un
Embedded BIE XLS also needs to be corrected to reflect above. TBG1: Corrected the imbedded XLS. (...) Volume. Measure Corrected D.07B: The measure of the molecular weight of this volatile organic compound goods characteristic. (...) Vapour Density Range_ Measurement Cardinality specified as “0..n” in model, implemented as “0..1” Corrected 3.1.4 Canonical Data Model Specific Inconsistencies Canonical Data Model was missing from the ‘MSDS_RSM_10Oct2007.doc” and new in the “MSDS_RSM_30Nov2007.doc” RSM.
Language:English
Score: 1065554.4 - https://unece.org/fileadmin/DA...DIT-REPORT-D07B-2008-08-11.pdf
Data Source: un
 Page 41 - Methodology for measurement of Quality of Service (QoS) Key Performance Performance Indicators (KPIs) for Digital Financial Services           Basic HTML Version Table of Contents View Full Version Page 41 - Methodology for measurement of Quality of Service (QoS) Key Performance Performance Indicators (KPIs) for Digital Financial Services P. 41 Location Log Sheet (Date/Time) Sheet Team ID started Point in time when the sheet is started to be used Sheet Team Leader completed Point in time when the sheet is full/completed Sheet Location name photographed After completion, the sheet shall be photographed and the photo uploaded (e-mailed) to a given location Sheet Photo Date uploaded Checked after the sheet has been successfully e-mailed INITIAL CHECK OF CONDITIONS AND MEASUREMENT SET-UP // After entering the location Low Capability 1 Low Capability 2 Full Capability 1 Full Capability 2 Observer Phone Phone ID Time: (24h format) Operator RF level Battery level Charger connected? Date/time correct Network mode 2G only 2G only LTE/3G/2G auto connect LTE/3G/2G auto connect LTE/3G/2G auto connect Mobile data disabled disabled enabled enabled enabled REGULAR CHECKS // Remark: Regular checks should be scheduled approx. every 2 hours Low Capability 1 Low Capability 2 Full Capability 1 Full Capability 2 Observer Phone Phone ID Time: (24h format) RF level (no network=0) Battery level Date/time correct Network mode 2G only 2G only LTE/3G/2G auto connect LTE/3G/2G auto connect LTE/3G/2G auto connect Mobile data disabled disabled enabled enabled enabled Time: RF level (no network=0) Battery level Date/time correct Network mode 2G only 2G only LTE/3G/2G auto connect LTE/3G/2G auto connect LTE/3G/2G auto connect Mobile data disabled disabled enabled enabled enabled FINAL CHECK OF CONDITIONS AND MEASUREMENT SET-UP // Before leaving the location Low Capability 1 Low Capability 2 Full Capability 1 Full Capability 2 Observer Phone Phone ID Time: (24h format) RF level (no network=0) Battery level Date/time correct Network mode 2G only 2G only LTE/3G/2G auto connect LTE/3G/2G auto connect LTE/3G/2G auto connect Mobile data disabled disabled enabled enabled enabled SMS Backup executed LID2575 Campaign Forms R02-V02.pdf Methodology for measurement of Quality of Service (QoS) Key Performance Indicators (KPIs) for Digital Financial Services • 39     36     37     38     39     40     41     42     43     44     45     46          
Language:English
Score: 1064990.8 - https://www.itu.int/en/publica...t/files/basic-html/page41.html
Data Source: un
ICC-01/05-01/08-974-Anx2 25-10-2010 3/10 SL T The annex was wrongly stamped and now reflects the correct registration document number ICC-01/05-01/08-974-Conf-Exp-Anx1 25-10-2010 3/10 FB T 9) Following the preparatory assessment, the VWU, in consultation with the party calling the witness, determines appropriate measures to prepare the vulnerable witness for trial. (...) ICC-01/05-01/08-974-Anx2 25-10-2010 4/10 SL T The annex was wrongly stamped and now reflects the correct registration document number ICC-01/05-01/08-974-Conf-Exp-Anx1 25-10-2010 4/10 FB T 12) At the end of the assessment, the Psychologist discusses with the witness the relevant special measures and seeks the consent of thé witness to implement those measures, if granted. (...) ICC-01/05-01/08-974-Anx2 25-10-2010 7/10 SL T The annex was wrongly stamped and now reflects the correct registration document number ICC-01/05-01/08-974-Conf-Exp-Anx1 25-10-2010 7/10 FB T Annex A: Catalogue of Special Measures (rule 88 of the Rules of Procedure and Evidence) Recommendations for special measures may include, but are not limited to: 1.
Language:English
Score: 1062688.5 - https://www.icc-cpi.int/sites/...elatedRecords/CR2010_09131.PDF
Data Source: un
ITU Document • http://www.itu.int/council • Y:\APP\PDF_SERVER\ALL-USER\IN\LAURENSON\D531-E.DOC (198956) 15.11.07 03.03.10 DECISION 531 (adopted at the ninth plenary meeting) Additional corrective measures relating to cost recovery on satellite network filings for those satellite networks subject to Decision 513* The Council, considering a) the revision of the methodology and scale of charges for cost recovery of the processing of space notices established in Decision 482 modified by the Council at its 2002 session; b) that in Decision 513 the Council at its 2003 session agreed on the need to address this issue on a temporary basis, pending a review of the charging methodology by the Council at its 2004 session; c) that the Council at its 2004 session did not adopt a new charging methodology, further considering a) that for filings subject to Decision 513, which covered multiple categories, the fee was calculated based upon the highest level of unit charge for the categories; b) that the application of Decision 513 still resulted in some invoices having values significantly higher than CHF 100 000, finally considering a) the further need to provide some additional corrective measures regarding the deviations of the current charging methodology for processing space notices as set out in Decision 482 modified for very complex networks, leading to large invoices that may not be in line with the amount of work, which may not increase in a linear manner when the number of units is very large and/or the filing covers multiple categories, ____________________ * The payment of revised invoices will not reinstate any network which has been cancelled due to non-payment in accordance with the relevant provisions of the Radio Regulations. Document C05/107-E 25 July 2005 COUNCIL 2005 GENEVA, 12-22 JULY 2005 Original: French - 2 - C05/107-E Y:\APP\PDF_SERVER\ALL-USER\IN\LAURENSON\D531-E.DOC (198956) 15.11.07 03.03.10 decides 1 to invite the Council, at its 2006 session, to transmit this decision to the 2006 Plenipotentiary Conference, for consideration of the implementation of the corrective measures set forth in this decision for invoices issued for the 2002-2003 period, including: • where the amount of an invoice relating to satellite networks subject to Decision 513, but excluding those networks in Categories 7 and 8 of Decision 482, exceeded CHF 100 000, the Bureau shall set the filing fee to be CHF 100 000; • for those satellite networks affected by the first bullet above, and not nominated for the free entitlement, the Bureau would issue revised invoices for these filings and shall credit the responsible administration the difference in fees where payment has already been received; • any credits arising from the application of the second bullet above shall be applied by the Bureau to currently issued but unpaid invoices or future invoices for satellite filings of that administration; • the affected administrations shall advise the Bureau which invoices shall have the resulting credits applied to them; 2 to invite the Secretary-General to submit a report on this issue to the Council at its 2006 session. ____________ ITU Document Additional corrective measures relating to cost recovery on satellite network filings for those satellite networks ...
Language:English
Score: 1059777.9 - https://www.itu.int/en/ITU-R/space/Documents/D531-E.pdf
Data Source: un
The fraction of correct predictions predicted by the model is termed as accuracy. (...) An important measure to identify how the classifier performs action recognition is precision. The ability of a classifier is measured using precision which only identifies the correct instances of each action class, can be calculated using Equation (5). (5) The ability of a classifier to find all correct instances per class is measured using recall which is calculated using Equation (6).
Language:English
Score: 1056893.9 - https://www.itu.int/en/publica.../files/basic-html/page134.html
Data Source: un