Home

Results 21 - 30 of 174,116 for correct. Search took 5.45 seconds.  
Sort by date/Sort by relevance
Lebanon Dec, 2018 B 2 ANNEX 15: Para. 3.6 QMS Implementation Lack of Implementation of QMS Jan, 2003 (USOAP-CMA finding) H Corrective Action Plan was provided in August 2016. Lebanon Dec, 2018 A 3 ANNEX 15: Para. 5.3.3.3.2 - Lack of the required Terrain Datasets for Area 1 May, 2014 - O Corrective Action Plan was provided in August 2016. Lebanon Dec, 2018 A 4 ANNEX 15: Para. 5.3.3.4.3 - Lack of the required Obstacle Datasets for Area 1 May, 2014 - O Corrective Action Plan was provided in August 2016.
Language:English
Score: 668589.5 - https://www.icao.int/MID/Docum...5-AI5%20AIM%20Deficiencies.pdf
Data Source: un
S Corrective Action Plan has not been provided by the State Egypt Dec, 2016 B 2 MID ANP Table ATS 1-ATS routes - ATS routes M312/UM312 not implemented Apr, 2013 Segment DBA- AMIBO not implemented. (...) S O Corrective Action Plan has not been provided by the State Iran- UAE Dec, 2015 B 3 Annex 11 Para 3.3.5.1 - Reporting Unsatisfactory LHDs to the MIDRMA Oct, 2013 Iran to coordinate with the MIDRMA. (...) Contingency agreements should be signed with all adjacent ACCs Nov, 2006 Contingency Agreement signed only with Oman. H O Corrective Action Plan has not been provided by the State Yemen Dec, 2015 A 2 Annex 11 Para 3.3.5.1 - Granting RVSM approvals for aircraft without known hight- keeping monitoring results Dec, 2012 - H O Corrective Action Plan has not been provided by the State Yemen Dec, 2015 A 3 Annex 11 Para 3.3.5.1 - Reporting Unsatisfactory LHDs to MIDRMA Oct, 2013 Yemen to coordinate with MIDRMA.
Language:English
Score: 668568.2 - https://www.icao.int/MID/Documents/2015/ATM%20SG2/WP20.pdf
Data Source: un
BT.1306 : Error correction, data framing, modulation and emission methods for digital terrestrial television broadcasting   Français   Español     Home : ITU-R : Publications : Recommendations : BT Series : BT.1306 Recently posted  -  Search Recommendations     BT.1306 : Error correction, data framing, modulation and emission methods for digital terrestrial television broadcasting Recommendation BT.1306 Approved in 2020-04 Managed by R00-SG06 Main Number Title Status Questions BT.1306-8 (04/2020)   Error correction, data framing, modulation and emission methods for digital terrestrial television broadcasting   In force (Main) 102-3/6       Previous versions Number Title Status Questions BT.1306-0 (10/97)   Error-correction, data framing, modulation and emission methods for digital terrestrial television broadcasting   Superseded N/A   BT.1306-4 (09/09)   Error correction, data framing, modulation and emission methods for digital terrestrial television broadcasting   Superseded 31/6   BT.1306-7 (06/2015)   Error correction, data framing, modulation and emission methods for digital terrestrial television broadcasting   Superseded N/A   BT.1306-2 (07/05)   Error-correction, data framing, modulation and emission methods for digital terrestrial television broadcasting   Superseded 31/6   BT.6/BL/31 (07/05)   Draft revision of Recommendation ITU-R BT.1306-1 - Error-correction, data framing, modulation and emission methods for digital terrestrial television broadcasting   Pre-published 121/11   BT.1306-1 (10/00)   Error-correction, data framing, modulation and emission methods for digital terrestrial television broadcasting   Superseded N/A   BT.1306-3 (05/06)   Error correction, data framing, modulation and emission methods for digital terrestrial television broadcasting   Superseded 31/6   BT.1306-5 (03/11)   Error correction, data framing, modulation and emission methods for digital terrestrial television broadcasting   Superseded N/A   BT.1306-6 (12.11)   Error correction, data framing, modulation and emission methods for digital terrestrial television broadcasting   Superseded 69-1/6     Top  -  Feedback  -  Contact us  -  Copyright © ITU  2008 All Rights Reserved Contact for this page :  ITU-R Web coordinator Updated : 2020-12-21  
Language:English
Score: 667492.04 - https://www.itu.int/rec/R-REC-BT.1306/_page.print
Data Source: un
BT.1306 : Error correction, data framing, modulation and emission methods for digital terrestrial television broadcasting   Français   Español     Home : ITU-R : Publications : Recommendations : BT Series : BT.1306 Recently posted  -  Search Recommendations     BT.1306 : Error correction, data framing, modulation and emission methods for digital terrestrial television broadcasting Recommendation BT.1306 Approved in 2020-04 Managed by R00-SG06 Main Number Title Status Questions BT.1306-8 (04/2020)   Error correction, data framing, modulation and emission methods for digital terrestrial television broadcasting   In force (Main) 102-3/6       Previous versions Number Title Status Questions BT.1306-0 (10/97)   Error-correction, data framing, modulation and emission methods for digital terrestrial television broadcasting   Superseded N/A   BT.1306-4 (09/09)   Error correction, data framing, modulation and emission methods for digital terrestrial television broadcasting   Superseded 31/6   BT.1306-7 (06/2015)   Error correction, data framing, modulation and emission methods for digital terrestrial television broadcasting   Superseded N/A   BT.1306-2 (07/05)   Error-correction, data framing, modulation and emission methods for digital terrestrial television broadcasting   Superseded 31/6   BT.6/BL/31 (07/05)   Draft revision of Recommendation ITU-R BT.1306-1 - Error-correction, data framing, modulation and emission methods for digital terrestrial television broadcasting   Pre-published 121/11   BT.1306-1 (10/00)   Error-correction, data framing, modulation and emission methods for digital terrestrial television broadcasting   Superseded N/A   BT.1306-3 (05/06)   Error correction, data framing, modulation and emission methods for digital terrestrial television broadcasting   Superseded 31/6   BT.1306-5 (03/11)   Error correction, data framing, modulation and emission methods for digital terrestrial television broadcasting   Superseded N/A   BT.1306-6 (12.11)   Error correction, data framing, modulation and emission methods for digital terrestrial television broadcasting   Superseded 69-1/6     Top  -  Feedback  -  Contact us  -  Copyright © ITU  2008 All Rights Reserved Contact for this page :  ITU-R Web coordinator Updated : 2020-12-21  
Language:English
Score: 667492.04 - https://www.itu.int/rec/R-REC-BT.1306/en
Data Source: un
Lebanon Dec, 2021 B 2 ANNEX 15: Para. 3.6 QMS Implementation Lack of Implementation of QMS Jan, 2003 (USOAP-CMA finding) H Corrective Action Plan was provided in August 2016. Lebanon Dec, 2022 A 3 ANNEX 15: Para. 5.3.3.3.2 5.3.3.3.3 - Lack of provision of required terrain data sets May, 2014 - O Corrective Action Plan was provided in August 2016. Lebanon Dec, 2021 A 4 ANNEX 15: 5.3.3.4.3 5.3.3.4.5 - Lack of provision of required obstacle data sets May, 2014 - O Corrective Action Plan was provided in August 2016.
Language:English
Score: 667209.23 - https://www.icao.int/MID/Docum...8%20and%20MIDAD%20TF6/PPT6.pdf
Data Source: un
Although the MIDANPIG Conclusion 15/35 urged States to submit a specific Corrective Action Plan (CAP) for each deficiency, the majority of States have not yet provided CAPs for their deficiencies. (...) Jan, 2003 - H No Corrective Action Plan submitted by the State Lebanon Dec, 2016 A 4 ANNEX 15: Para. 10.1.3 - Lack of the required Terrain Datasets for eTOD Area 1 May, 2014 - O No Corrective Action Plan submitted by the State Lebanon Dec, 2016 A 5 ANNEX 15: Para. 10.1.3 - Lack of the required Obstacle Datasets for eTOD Area 1 May, 2014 - O No Corrective Action Plan submitted by the State Lebanon Dec, 2016 A (1) Rationale for non-elimination: “F”= Financial “H”= Human Resources “S”= State (Military/political) “O”= Other unknown causes MIDANPIRG/16-WP/29 APPENDIX A A-9 Deficiencies in the AIM Field LIBYA Item No Identification Deficiencies Corrective Action Requirement Facilities/ Services Description Date First Reported Remarks/ Rationale for Non-elimination Description Executing Body Date of Completion Priority for Action 1 ANNEX 4: Para. 16.2 - Non-production of World Aeronautical Chart – ICAO 1:1 000 000 May, 2014 - O No Corrective Action Plan submitted by the State Libya Dec, 2016 B 2 ANNEX 15: Para. 3.7 - Implementation of a Quality System May, 2014 (USOAP-CMA finding) O No Corrective Action Plan submitted by the State Libya Dec, 2016 A 3 ANNEX 15: Para 6. - Lack of implementation of AIRAC System Lack of a system for AIRAC adherence monitoring May, 2014 - O No Corrective Action Plan submitted by the State Libya Dec, 2016 A 4 ANNEX 15: Para. 3.6.5 ANNEX 15: Para. 3.6 - Lack of AIS automation Lack of AIXM-based AIS Database May, 2014 - O No Corrective Action Plan submitted by the State Libya Dec, 2016 A 5 ANNEX 15: Para. 10.1.3 - Lack of the required Terrain Datasets for eTOD Area 1 May, 2014 - O No Corrective Action Plan submitted by the State Libya Dec, 2016 A 6 ANNEX 15: Para. 10.1.3 - Lack of the required Obstacle Datasets for eTOD Area 1 May, 2014 - O No Corrective Action Plan submitted by the State Libya Dec, 2016 A (1) Rationale for non-elimination: “F”= Financial “H”= Human Resources “S”= State (Military/political) “O”= Other unknown causes MIDANPIRG/16-WP/29 APPENDIX A A-10 Deficiencies in the AIM Field OMAN Item No Identification Deficiencies Corrective Action Requirement Facilities/ Services Description Date First Reported Remarks/ Rationale for Non-elimination Description Executing Body Date of Completion Priority for Action 1 ANNEX 15:Para. 3.7 - Implementation of a Quality System Jan, 2003 (USOAP-CMA finding) O The Public Authority for Civil Aviation has contracted with the Avitech Company for the development and implementation of a Quality Management System (QMS). (...) Jan, 2003 - F H No Corrective Action Plan submitted by the State Syria Dec, 2016 A 5 ANNEX 15: Para 4.2.9 & 4.3.7 - Lack of regular and effective updating of the AIP Jul, 2005 - F H O No Corrective Action Plan submitted by the State Syria Dec, 2016 A 6 ANNEX 15 Para. 4. - Lack of consistency between the different Sections of the AIP containing the same information.
Language:English
Score: 666710.94 - https://www.icao.int/MID/MIDAN...16-WP29%20-%20Deficiencies.pdf
Data Source: un
Lebanon Dec, 2018 A 3 ANNEX 15: Para. 5.3.3.3.2 - Lack of the required Terrain Datasets for Area 1 May, 2014 - O Corrective Action Plan was provided in August 2016. Lebanon Dec, 2018 A 4 ANNEX 15: Para. 5.3.3.4.3 - Lack of the required Obstacle Datasets for Area 1 May, 2014 - O Corrective Action Plan was provided in August 2016. (...) Nov, 2006 Contingency agreements not signed with Syria. H Corrective Action Plan has not been formally provided by the State.
Language:English
Score: 666687.16 - https://www.icao.int/MID/MIDAN...s/MID17%20and%20RASG7/WP38.pdf
Data Source: un
S O Corrective Action Plan has not been formally provided by the State Iran- UAE Dec 2021 B Deficiencies in the ATM field IRAQ Item No Identification Deficiencies Corrective Action Requirement Facilities/ Services Description Date first reported Remarks/ Rationale for non-elimination Facilities/ Services Executing body Date of completion Priority for action 1 MID ANP Table ATM II-MID-1 MID REGION ATS ROUTE NETWORK - ATS route G667 not implemented Sep 2006 Segment ALSAN-ABD not implemented S Corrective Action Plan has not been formally provided by the State Iraq- Iran- Kuwait Dec 2021 B 2 Annex 11 Para. 2.31 - Development of contingency plan for implementation in the event of disruption or Nov 2006 Contingency Agreement to be signed with Syria S Corrective Action Plan has not been formally Iraq Dec 2021 A ATM SG/7-WP/16 APPENDIX A A-2 potential disruption of ATS and related supporting services. (...) Nov 2006 Contingency agreements not signed with Syria. H Corrective Action Plan has not been formally provided by the State. (...) S Corrective Action Plan has not been formally provided by the State Iran- UAE Dec 2021 B ------------------------ ATM SG/7-WP/16 APPENDIX B Deficiencies in the SAR field IRAQ Item No Identification Deficiencies Corrective Action Requirement Facilities/ Services Description Date first reported Remarks/ Rationale for non- elimination Facilities/ Services Executing body Date of completion Priority for action 1 Annex 12 Para. 2.1 - Lack of provision of required SAR services Apr 2012 - O Corrective Action Plan has not been formally provided by the State Iraq Dec 2021 A 2 Annex 6 Part I, Chap.6 and Part II Chap. 2 Annex 10, Vol III, Chap. 5 Annex 12 para. 2.6.4 ELT Non-compliance with carriage of Emergency Locator Transmitter (ELT) requirements Apr 2012 - O Corrective Action Plan has not been formally provided by the State Iraq Dec 2021 A Deficiencies in the SAR field KUWAIT ATM SG/7-WP/16 APPENDIX B B-2 Item No Identification Deficiencies Corrective Action Requirement Facilities/ Services Description Date first reported Remarks/ Rationale for non- elimination Facilities/ Services Executing body Date of completion Priority for action 1 Annex 6 Part I chap. 6 and Part II chap. 2 Annex 10, Vol III, Chap. 5 Annex 12 para. 2.6.4 ELT Non-compliance with carriage of Emergency Locator Transmitter (ELT) requirements Apr 2012 - O Corrective Action Plan has not been formally provided by the State Kuwait Dec 2021 A Deficiencies in the SAR field LEBANON Item No Identification Deficiencies Corrective Action Requirement Facilities/ Services Description Date first reported Remarks/ Rationale for non- elimination Facilities/ Services Executing body Date of completion Priority for action 1 Annex 12 Para. 2.1 - Lack of provision of required SAR services Apr 2012 - O Corrective Action Plan has not been Lebanon Dec 2021 A ATM SG/7-WP/16 APPENDIX B B-3 formally provided by the State Deficiencies in the SAR field LIBYA Item No Identification Deficiencies Corrective Action Requirement Facilities/ Services Description Date first reported Remarks/ Rationale for non- elimination Facilities/ Services Executing body Date of completion Priority for action 1 Annex 6 Part I chap. 6 and Part II chap. 2 Annex 10, Vol III, Chap. 5 Annex 12 para. 2.6.4 - Non-compliance with carriage of Emergency Locator Transmitter (ELT) requirements Dec 2014 - H S O Corrective Action Plan has not been formally provided by the State Libya Dec 2021 A 2 Annex 12 Para. 2.1 - Lack of provision of required SAR services Dec 2014 - H S O Corrective Action Plan has not been formally provided by the State Libya Dec 2021 A ATM SG/7-WP/16 APPENDIX B B-4 Deficiencies in the SAR field SYRIA Item No Identification Deficiencies Corrective Action Requirement Facilities/ Services Description Date first reported Remarks/ Rationale for non- elimination Facilities/ Services Executing body Date of completion Priority for action 1 Annex 12 Para. 2.1 - Lack of provision of required SAR services Apr 2012 - O Corrective Action Plan has not been formally provided by the State Syria Dec 2021 A 2 Annex 6 Part I chap. 6 and Part II chap. 2 Annex 10, Vol III, Chap. 5 Annex 12 para. 2.6.4 - Non-compliance with carriage of Emergency Locator Transmitter (ELT) requirements Apr 2012 - O Corrective Action Plan has not been formally provided by the State Syria Dec 2021 A Deficiencies in the SAR field YEMEN ATM SG/7-WP/16 APPENDIX B B-5 Item No Identification Deficiencies Corrective Action Requirement Facilities/ Services Description Date first reported Remarks/ Rationale for non- elimination Facilities/ Services Executing body Date of completion Priority for action 1 Annex 12 Para. 2.1 - Lack of provision of required SAR services Apr 2012 - O Corrective Action Plan has not been formally provided by the State Yemen Dec 2021 A 2 Annex 6 Part I chap. 6 and Part II chap. 2 Annex 10, Vol III, Chap. 5 Annex 12 para. 2.6.4 - Non-compliance with carriage of Emergency Locator Transmitter (ELT) requirements Apr 2012 - O Corrective Action Plan has not been formally provided by the State Yemen Dec 2021 A - END - ATM SG7-WP16 - ATM and SAR Deficiencies 1.
Language:English
Score: 666397.6 - https://www.icao.int/MID/Documents/2021/ATM%20SG7/WP16.pdf
Data Source: un
INTRODUCTION 1.1 The MIDANPIRG/16 meeting noted with concern that the majority of deficiencies listed in the MANDD have no specific Corrective Action Plan (CAP). The meeting urged States to implement the provisions of MIDANPIRG Conclusion 15/35 related to elimination of Air Navigation Deficiencies, in particular, the submission of a specific Corrective Action Plan (CAP) for each deficiency. 2. (...) Jan, 2003 - F H Corrective Action Plan has not been formally provided by the State Syria Dec, 2018 A 5 ANNEX 15 Para. 4. (...) Contingency agreements not signed with Syria. H Corrective Action Plan has not been formally provided by the State.
Language:English
Score: 665817.43 - https://www.icao.int/MID/Documents/2018/MSG%206/WP%2019.pdf
Data Source: un
Note that Section 7 has been renumbered as follows: 7.1 Technical and editorial corrections to ITU-T Recommendation H.221 7.2 Technical and editorial corrections to ITU-T Recommendation H.224 7.3 Technical and editorial corrections to ITU-T Recommendation H.230 7.4 Technical and editorial corrections to ITU-T Recommendation H.242 7.5 Technical and editorial corrections to ITU-T Recommendation H.243 Changes from the previous published version appear in the following sections: 1. 7.2.1 New section 11 (Q1-A11) Implementor's Guide for the ITU-T H.320 Recommendation series - Narrow-band visual telephone systems and terminal equipment Abstract This document is a compilation of reported defects identified with the 1997-2000 editions of the ITU-T H.320-series Recommendations. (...) [End Correction] Identifies the end of revision marked text based on extractions from the published Recommendations affected by the correction being described. ... (...) The editorial corrections needed are described below. 7.5.1 Editorial corrections to section 5.5/H.243 In section 5.5 of H.243, there is a reference to Q.939, but it should read Q.931.
Language:English
Score: 664994.9 - https://www.itu.int/wftp3/av-a...toseguro/TDImpl_H320(0601).doc
Data Source: un