Examples of Peculiarities Notes for UN documents:
515 $a
Corrects text.
515 $a Corrects title and text.
515 $a
Corrects meeting dates.
515 $a
Corrects document symbol to: [E/ECE/]MP.EIA/2001/17.
515 $a
Corrects document symbol citations in text.
515 $a
Corrects language information in masthead.
515 $a
Corrects date in symbol block of masthead.
515 $a
Replaces table on p. 13.
515 $a Replaces p. [1].
515 $a
Inserts new para. 2 bis.
515 $a
Title corrected by: E/CN.4/2002/25/Corr.1.
515 $a
Document symbol corrected by: [E/ECE/]ENVWA/2/Corr.1.
515 $a
Document withdrawn.
515 $a
The draft resolution was withdrawn by its sponsor in the light of the adoption of draft resolution A/C.3/62/L.16/Rev.2 (A/62/433(Part II)).
515 $a
The draft resolution was not adopted (10-1-4) owing to the negative vote of a permanent member of the Council (United States) (S/PV.5488).
515 $a
Supersedes document ST/IC/2004/7 and Add.1.
515 $a
Superseded by ST/SGB/2005/5.
515 $a
Additional sponsors: Belarus, China and Cuba. 515 $a
Adds Qatar to the list of participants.
515 $a
Corrects information at head of title.
The changes, clarifications and corrections defined herein are expected to be included in future versions of the affected V.140 Recommendation.
(...) The changes, clarifications and corrections defined herein are expected to be included in future versions of the affected V.140 Recommendation.
(...) [End Correction]
Identifies the end of revision marked text based on extractions from the published Recommendations affected by the correction being described.
...
Corrected
04 October 2009 AUDIT REPORT Page: 9/17
UN00004182 Insurance Product. (...) Resolution: XML schemas have been corrected.
29. UNECE_MeasurementUnitCommonCodeDuration_4.xsd Version not changed and codes added
ATG2 response: Version is correct. (...) Resolution: XML schemas have been corrected.
SPL converted to SPL converted to PNLPNL
2.2. Tone correction Tone correction factor C is factor C is calculatedcalculated
3.3. PNLT = PNL + CPNLT = PNL + C
Bangkok, 6 to 7 November 2006 11
Noise Certification Workshop
5 steps of EPNL calculation5 steps of EPNL calculation
For the entire flightFor the entire flight
4.4. Duration correction D is calculatedDuration correction D is calculated
where T= 10 sec and where T= 10 sec and ΔΔtt=0.5 sec=0.5 sec 5.5. (...) Aircraft Noise Certification Measurement Points
Adjustments/Corrections applied to measured spectra ½ second apart
According to ICAO Annex 16 Appendix 2
5 steps of EPNL calculation
5 steps of EPNL calculation
PNL corrected for tones as a function of flyover time
Adjustment of Flight Results
In the case of display of locally captured video, the gamma of the camera output and display input should also be corrected as described above.
NOTE 2: The method used for gamma pre-correction by the gamma correction function is left to implementers, but in many cases a look-up table with 256 or 1024 values for each of the R , G , and B channels of video will be sufficient.
(...) In practice, some terminals will not fully correct gamma. If only one terminal corrects gamma, only partial gamma correction will be achieved.
(...) If so, the device should perform gamma correction to ensure that the gamma of the received video sources is adjusted to a common value before composing the output video signal.
_________________
Gamma Correction function
Camera
Video Encoder
Video Decoder
Gamma Correction function
Display
PAGE
* Contact:
Dave Lindbergh
Polycom, Inc.
The changes, clarifications and corrections defined herein are expected to be included in future versions of affected H.320-series Recommendations.
(...) [End Correction]
Identifies the end of revision marked text based on extractions from the published Recommendations affected by the correction being described.
...
(...) Technical and editorial corrections
7.1 Technical and editorial corrections to ITU-T Recommendation H.221
To support G.722.1 in H.320 systems, new BAS capability and command codes need to be added in Recommendation H.221.
[End Correction]
Identifies the end of revision marked text based on extractions from the published Recommendations affected by the correction being described.
...
(...) Editorial corrections are made to the existing text to synchronize it with the values of table A.1/H.221.
(...) The editorial corrections needed are described below.
7.4.1 Editorial corrections to section 5.5/H.243
In section 5.5 of H.243, there is a reference to Q.939, but it should read Q.931.
Iraq advised that they can provide VSAT.
O No Corrective Action Plan submitted by the State
Iraq- Syria Dec, 2015
A
2 MID FASID. (...) Iraq advised that all NAV AIDs will be installed according to the master plan.
O
No Corrective Action Plan submitted by the State
Iraq Dec, 2015
A
3 MID FASID. (...) Oct, 1998
No updates received from Yemen.
O
No Corrective Action Plan submitted by the State
Yemen- Djibouti
Dec, 2015
A
2 Direct Speech Circuit with Adjacent Centre in India.
One OPMET deficiency (METAR not available internationally for ORSU (Iraq)) was removed from the MANDD.
1.2 MIDANPIRG/15 reviewed the outcome of the different MIDANPIRG subsidiary bodies related to air navigation deficiencies and agreed to the following Conclusion to replace and supersede the MIDANPIRG/14 Conclusion 14/32:
CONCLUSION 15/35: AIR NAVIGATION DEFICIENCIES
That, States be urged to:
a) use the MID Air Navigation Deficiency Database (MANDD) for the
submission of requests for addition, update, and elimination of Air Navigation Deficiencies, including the submission of a specific Corrective Action Plan (CAP) for each deficiency; and
b) submit a Formal Letter to the ICAO MID Regional Office containing the evidence(s) that mitigation measures have been implemented for the elimination of deficiency(ies) when requesting the elimination of deficiency(ies) from the MANDD.
(...) In addition, the meeting is invited to provide any other information related to new deficiencies identified.
2.2 Lastly, the meeting may note that Iran, Lebanon and Syria do not acquire SADIS and therefore the lack of WAFS forecasts necessary for briefing and flight documentation (Annex 3, 9.1.4, 9.3.1, 9.4.1 and Appendix 2, 2.1.1) would result in a deficiency if not remedied by the MIDANPIRG/16 meeting.
2.3 The Secretariat will assist in developing a corrective action plan to any deficiencies identified noting that if those deficiencies still exist by MIDANPIRG/16, they would be considered for inclusion to the MID Air Navigation Deficiencies Database (MANDD).
3. ACTION BY THE MEETING
3.1 The meeting is invited to:
a) review and update the list of deficiencies in the MET field; and
b) urge States to take necessary follow-up actions to implement MIDANPIRG/15 Conclusion 15/35, in particular submission of a specific Corrective Action Plan (CAP) for each deficiency.
------------------
MET WP/08 APPENDIX A
APPENDIX A
Deficiencies in the MET Field
BAHRAIN
Item No
Identification Deficiencies Corrective Action
Requirement Facilities/ Services
Description Date First Reported
Remarks/ Rationale for Non-elimination
Description Executing Body Date of Completion
Priority for
Action
No Deficiencies Reported
(1) Rationale for non-elimination: “F”= Financial “H”= Human Resources “S”= State (Military/political) “O”= Other unknown causes
MET WP/08 APPENDIX A
A-2
Deficiencies in the MET Field
EGYPT
Item No
Identification Deficiencies Corrective Action
Requirement Facilities/ Services
Description Date First Reported
Remarks/ Rationale for Non-elimination
Description Executing Body Date of Completion
Priority for
Action
1 MID FASID Table MET 1A
HEOW METAR and 30-hour TAF
not available internationally
HEOW METAR and 30-hour TAF not available internationally
Nov, 2013
newly reported
-
O HEOW OPMET Data to be routed to ROC Vienna (LOZZMMID)
No corrective action plan submitted by the State
Egypt May, 2014
Dec, 2014
A
(1) Rationale for non-elimination: “F”= Financial “H”= Human Resources “S”= State (Military/political) “O”= Other unknown causes
MET WP/08 APPENDIX A
A-3
Deficiencies in the MET Field
IRAN
Item No
Identification Deficiencies Corrective Action
Requirement Facilities/ Services
Description Date First Reported
Remarks/ Rationale for Non-elimination
Description Executing Body Date of Completion
Priority for
Action
1 QMS - MET
Para 2.2 of Annex 3
Meteorological information to be supplied to users listed in 2.1.2 of Annex 3
Confirmation of QMS for MET not yet received
Sep, 2014
(USOAP - CMA finding)
O No corrective action plan submitted by the State
Iran Dec, 2015
A
(1) Rationale for non-elimination: “F”= Financial “H”= Human Resources “S”= State (Military/political) “O”= Other unknown causes
MET WP/08 APPENDIX A
A-4
Deficiencies in the MET Field
IRAQ
Item No
Identification Deficiencies Corrective Action
Requirement Facilities/ Services
Description Date First Reported
Remarks/ Rationale for Non-elimination
Description Executing Body Date of Completion
Priority for
Action
1 MID FASID Table MET 1A
ORSU METAR ORSU METAR not available internationally
Nov, 2013
- O ORSU METAR to be routed to ROC Vienna (LOZZMMID)
Iraq May, 2014
A
2 QMS - MET
para 2.2 of Annex 3
Meteorological information to be supplied to users listed in 2.1.2 of Annex 3
confirmation of QMS for MET not yet received
Sep, 2014
- O no corrective action plan submitted by the State
Iraq Dec, 2015
A
(1) Rationale for non-elimination: “F”= Financial “H”= Human Resources “S”= State (Military/political) “O”= Other unknown causes
MET WP/08 APPENDIX A
A-5
Deficiencies in the MET Field
JORDAN
Item No
Identification Deficiencies Corrective Action
Requirement Facilities/ Services
Description Date First Reported
Remarks/ Rationale for Non-elimination
Description Executing Body Date of Completion
Priority for
Action
No Deficiencies Reported
(1) Rationale for non-elimination: “F”= Financial “H”= Human Resources “S”= State (Military/political) “O”= Other unknown causes
MET WP/08 APPENDIX A
A-6
Deficiencies in the MET Field
KUWAIT
Item No
Identification Deficiencies Corrective Action
Requirement Facilities/ Services
Description Date First Reported
Remarks/ Rationale for Non-elimination
Description Executing Body Date of Completion
Priority for
Action
No Deficiencies Reported
(1) Rationale for non-elimination: “F”= Financial “H”= Human Resources “S”= State (Military/political) “O”= Other unknown causes
MET WP/08 APPENDIX A
A-7
Deficiencies in the MET Field
LEBANON
Item No
Identification Deficiencies Corrective Action
Requirement Facilities/ Services
Description Date First Reported
Remarks/ Rationale for Non-elimination
Description Executing Body Date of Completion
Priority for
Action
1 QMS - MET
para 2.2 of Annex 3
Meteorological information to be supplied to users listed in 2.1.2 of Annex 3
confirmation of QMS for MET not yet received
Sep, 2014
(USOAP - CMA finding)
O no corrective action plan submitted by the State
Lebanon Dec, 2015
A
(1) Rationale for non-elimination: “F”= Financial “H”= Human Resources “S”= State (Military/political) “O”= Other unknown causes
MET WP/08 APPENDIX A
A-8
Deficiencies in the MET Field
LIBYA
Item No
Identification Deficiencies Corrective Action
Requirement Facilities/ Services
Description Date First Reported
Remarks/ Rationale for Non-elimination
Description Executing Body Date of Completion
Priority for
Action
1 QMS - MET
para 2.2 of Annex 3
Meteorological information to be supplied to users listed in 2.1.2 of Annex 3
confirmation of QMS for MET not yet received
Sep, 2014
(USOAP - CMA finding)
O no corrective action plan submitted by the State
Libya Dec, 2015
A
(1) Rationale for non-elimination: “F”= Financial “H”= Human Resources “S”= State (Military/political) “O”= Other unknown causes
MET WP/08 APPENDIX A
A-9
Deficiencies in the MET Field
OMAN
Item No
Identification Deficiencies Corrective Action
Requirement Facilities/ Services
Description Date First Reported
Remarks/ Rationale for Non-elimination
Description Executing Body Date of Completion
Priority for
Action
1 QMS - MET
para 2.2 of Annex 3
Meteorological information to be supplied to users listed in 2.1.2 of Annex 3
confirmation of QMS for MET not yet received
Sep, 2014
(USOAP-CMA finding)
O no corrective action plan submitted by the State
Oman Dec, 2015
A
(1) Rationale for non-elimination: “F”= Financial “H”= Human Resources “S”= State (Military/political) “O”= Other unknown causes
MET WP/08 APPENDIX A
A-10
Deficiencies in the MET Field
QATAR
Item No
Identification Deficiencies Corrective Action
Requirement Facilities/ Services
Description Date First Reported
Remarks/ Rationale for Non-elimination
Description Executing Body Date of Completion
Priority for
Action
No Deficiencies Reported
(1) Rationale for non-elimination: “F”= Financial “H”= Human Resources “S”= State (Military/political) “O”= Other unknown causes
MET WP/08 APPENDIX A
A-11
Deficiencies in the MET Field
SAUDI ARABIA
Item No
Identification Deficiencies Corrective Action
Requirement Facilities/ Services
Description Date First Reported
Remarks/ Rationale for Non-elimination
Description Executing Body Date of Completion
Priority for
Action
No Deficiencies Reported
(1) Rationale for non-elimination: “F”= Financial “H”= Human Resources “S”= State (Military/political) “O”= Other unknown causes
MET WP/08 APPENDIX A
A-12
Deficiencies in the MET Field
SUDAN
Item No
Identification Deficiencies Corrective Action
Requirement Facilities/ Services
Description Date First Reported
Remarks/ Rationale for Non-elimination
Description Executing Body Date of Completion
Priority for
Action
No Deficiencies Reported
(1) Rationale for non-elimination: “F”= Financial “H”= Human Resources “S”= State (Military/political) “O”= Other unknown causes
MET WP/08 APPENDIX A
A-13
Deficiencies in the MET Field
SYRIA
Item No
Identification Deficiencies Corrective Action
Requirement Facilities/ Services
Description Date First Reported
Remarks/ Rationale for Non-elimination
Description Executing Body Date of Completion
Priority for
Action
1 MID FASID Table MET 1A
OSAP METAR and 24-hour TAF
OSAP METAR and 24-hour TAF not available internationally
Nov, 2013
newly reported
-
O OSAP OPMET data to be routed to ROC Vienna (LOZZMMID)
no corrective action plan submitted by the State
Syria Aug, 2014
Dec, 2014
A
2 QMS - MET
para 2.2 of Annex 3
Meteorological information to be supplied to users listed in 2.1.2 of Annex 3
confirmation of QMS for MET not yet received
Sep, 2014
(USOAP - CMA finding)
O no corrective action plan submitted by the State
Syria Dec, 2015
A
(1) Rationale for non-elimination: “F”= Financial “H”= Human Resources “S”= State (Military/political) “O”= Other unknown causes
MET WP/08 APPENDIX A
A-14
Deficiencies in the MET Field
UAE
Item No
Identification Deficiencies Corrective Action
Requirement Facilities/ Services
Description Date First Reported
Remarks/ Rationale for Non-elimination
Description Executing Body Date of Completion
Priority for
Action
No Deficiencies Reported
(1) Rationale for non-elimination: “F”= Financial “H”= Human Resources “S”= State (Military/political) “O”= Other unknown causes
MET WP/08 APPENDIX A
A-15
Deficiencies in the MET Field
YEMEN
Item No
Identification Deficiencies Corrective Action
Requirement Facilities/ Services
Description Date First Reported
Remarks/ Rationale for Non-elimination
Description Executing Body Date of Completion
Priority for
Action
1 QMS - MET
para 2.2 of Annex 3
Meteorological information to be supplied to users listed in 2.1.2 of Annex 3
confirmation of QMS for MET not yet received
Sep, 2014
- O no corrective action plan submitted by the State
Yemen Dec, 2015
A
(1) Rationale for non-elimination: “F”= Financial “H”= Human Resources “S”= State (Military/political) “O”= Other unknown causes
MET WP/08 APPENDIX A
A-16
Note:* Priority for action to remedy a deficiency is based on the following safety assessments:
'U' priority = Urgent requirements having a direct impact on safety and requiring immediate corrective actions.