Home

Results 1 - 10 of 1,014,426 for dating applications. Search took 3.501 seconds.  
Sort by date/Sort by relevance
Element Implementation Status 1 Element Description: WAFS Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 2 Element Description: IAVW Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 3 Element Description: TCAC forecasts Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 4 Element Description: Aerodrome warnings Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details. 5 Element Description: Wind shear warnings and alerts Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details. 6 Element Description: SIGMET Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 7 Element Description: Other OPMET information (METAR, SPECI and/or TAF) Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 8 Element Description: QMS for MET Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals Notes [STATE] ASBU Air Navigation Reporting Form (ANRF) PIA 2 Block - Module B0 - DATM Date Month XX, 2017 Module Description: The initial introduction of digital processing and management of information, from origination to publication, through aeronautical information service (AIS)/aeronautical information management (AIM) implementation, use of aeronautical exchange model (AIXM), migration to electronic aeronautical information publication (AIP) and better quality and availability of data. Element Implementation Status 1 Element Description: Standardized Aeronautical Information Exchange Model (AIXM) Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 2 Element Description: eAIP Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 3 Element Description: Digital NOTAM Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 4 Element Description: eTOD Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details. 5 Element Description: WGS-84 Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 6 Element Description: QMS for AIM Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details Achieved Benefits Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Notes [STATE] ASBU Air Navigation Reporting Form (ANRF) PIA 2 Block - Module B0 - FICE Date Month XX, 2017 Module Description: To improve coordination between air traffic service units (ATSUs) by using ATS interfacility data communication (AIDC) defined by ICAO’s Manual of Air Traffic Services Data Link Applications (Doc 9694). (...) Element Implementation Status 1 Element Description: ADS-C over oceanic and remote areas Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 2 Element Description: CPDLC over continental areas Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 3 Element Description: CPDLC over oceanic and remote areas Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 4 Element Description: SATVOICE direct controller-pilot communication (DCPC) Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals Notes
Language:English
Score: 774738.87 - https://www.icao.int/NACC/Docu...d%20GANP%20rev%2008022018.docx
Data Source: un
Element Implementation Status 1 Element Description: WAFS Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 2 Element Description: IAVW Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 3 Element Description: TCAC forecasts Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 4 Element Description: Aerodrome warnings Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details. 5 Element Description: Wind shear warnings and alerts Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details. 6 Element Description: SIGMET Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 7 Element Description: Other OPMET information (METAR, SPECI and/or TAF) Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 8 Element Description: QMS for MET Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals Notes [STATE] ASBU Air Navigation Reporting Form (ANRF) PIA 2 Block - Module B0 - DATM Date Month XX, 2017 Module Description: The initial introduction of digital processing and management of information, from origination to publication, through aeronautical information service (AIS)/aeronautical information management (AIM) implementation, use of aeronautical exchange model (AIXM), migration to electronic aeronautical information publication (AIP) and better quality and availability of data. Element Implementation Status 1 Element Description: Standardized Aeronautical Information Exchange Model (AIXM) Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 2 Element Description: eAIP Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 3 Element Description: Digital NOTAM Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 4 Element Description: eTOD Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details. 5 Element Description: WGS-84 Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 6 Element Description: QMS for AIM Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details Achieved Benefits Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Notes [STATE] ASBU Air Navigation Reporting Form (ANRF) PIA 2 Block - Module B0 - FICE Date Month XX, 2017 Module Description: To improve coordination between air traffic service units (ATSUs) by using ATS interfacility data communication (AIDC) defined by ICAO’s Manual of Air Traffic Services Data Link Applications (Doc 9694). (...) Element Implementation Status 1 Element Description: ADS-C over oceanic and remote areas Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 2 Element Description: CPDLC over continental areas Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 3 Element Description: CPDLC over oceanic and remote areas Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 4 Element Description: SATVOICE direct controller-pilot communication (DCPC) Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals Notes
Language:English
Score: 774738.87 - https://www.icao.int/NACC/Docu...d%20GANP%20rev%2008022018.docx
Data Source: un
(iv) Data to be given under code (15) should be presented in accordance with the provisions set out in WIPO Standard ST.50. (20) Data concerning the application for a patent or SPC * (21) Number(s) assigned to the application(s), e.g., “Numéro d’enregistrement national”, “Aktenzeichen” * (22) Date(s) of filing the application(s) * (23) Other date(s), including date of filing complete specification following provisional specification and date of exhibition (24) Date from which industrial property rights may have effect (25) Language in which the published application was originally filed (26) Language in which the application is published (27) Reference to a previously filed application for the purpose of obtaining a filing date under the Patent Law Treaty (PLT), Article 5(7) Notes: (i) The document "Terms of Protection", which provided information related to code (24), has been moved to the Archives. (...) (iii) With regard to code (27), the reference shall be made by indicating the WIPO Standard ST.3 code of the office with which the previous application was filed, the application number of the application, and, if required, the filing date. (...) HANDBOOK ON INDUSTRIAL PROPERTY INFORMATION AND DOCUMENTATION Ref.: Standards – ST.9 page: 3.9.7 Appendix 1, page 4 en / 03-09-01 Date: June 2013 (80) (90) Identification of data related to International Conventions other than the Paris Convention, and to legislation with respect to SPCs (81) Designated State(s) according to the PCT (83) Information concerning the deposit of microorganisms, e.g., under the Budapest Treaty (84) Designated Contracting States under regional patent conventions (85) Date of commencement of the national phase pursuant to PCT Article 23(1) or 40(1) (86) Filing data of the PCT international application, i.e., international filing date, international application number, and, optionally, the language in which the published international application was originally filed; or, in the case of design patents, registration data of the Hague Agreement international application, i.e., international registration date and international registration number (87) Publication data of the PCT international application, i.e., international publication date, international publication number, and, optionally, the language in which the international application is published (88) Date of deferred publication of the search report (91) Date on which an international application filed under the PCT no longer has an effect in one or several designated or elected States due to failure to enter the national or regional phase or the date on which it has been determined that it had failed to enter the national or regional phase (92) For an SPC, number and date of the first national authorization to place the product on the market as a medicinal product or plant protection product (93) For an SPC, number, date and, where applicable, country of origin, of the first authorization to place the product on the market as a medicinal product or plant protection product within a regional economic community (94) Calculated date of expiry of the SPC or the duration of the SPC (95) The product protected by the basic patent and in respect of which the SPC or the extension of the SPC has been applied for or granted (96) Filing data of the regional application, i.e., application filing date, application number, and, optionally, the language in which the published application was originally filed (97) Publication data of the regional application (or of the regional patent, if already granted), i.e., publication date, publication number, and, optionally, the language in which the application (or, where applicable, the patent) is published (98) For an SPC, the date concerning the application for an extension of the duration, the revocation of an extension of the duration and the recalculation of the duration Notes: (i) With regard to patents for invention, the codes (86), (87), (96) and (97) are intended to be used: – on national documents when identifying one or more of the relevant filing data or publication data of the PCT international application or of the regional application (or of the regional patent, if already granted), or – on regional documents when identifying one or more of the relevant filing data or publication data of the PCT international application or of another regional application (or the regional patent, if already granted).
Language:English
Score: 769542.5 - https://www.wipo.int/export/si.../standards/en/pdf/03-09-01.pdf
Data Source: un
TO BE FILLED IN BY THE CONTROLLER 1. Date application received: 2. Date of receipt of corrections and later filed papers completing the application: 3. (...) (New Applicant(s)/New Owner(s)/Agent**) …………….. (Date) ......................................................... (Applicant(s)/Owner(s)/Agent**) …………….. (Date) ........................................................
Language:English
Score: 767990.87 - https://www.wto.org/english/th...e/ton_e/WTACCTON12A1_LEG_5.pdf
Data Source: un
The date of file of an application for a utility model shall be established by the date of receipt of an application by Kazpatent that contains an application to issue a protective document for a utility model with the indication of the surname, name, patronymic name (if there is any) or full denomination of an applicant, description, formula and draughts, in the event the indicated documents are not provided simultaneously, then the date of file of an application for a utility model shall be established by the date of the receipt of the last document listed thereof. 4. (...) The applicant willing to use the right of convention priority must indicate this when filing the application or within two months from the date of filling an application to Kazpatent and attach the copy of the first application or submit it not later than a period of six months from the date of file of an application to Kazpatent. (...) Article 22. Examination of application for invention 1. Kazpatent shall conduct formal examination of an application after the expiration of two months from the date of the receipt of the application.
Language:English
Score: 764754.9 - https://www.wto.org/english/th...c_e/kaz_e/WTACCKAZ20_LEG_1.pdf
Data Source: un
Priority may be determined by the date of receipt of an application by the Patent office filed by the same applicant disclosing the industrial design, on condition that the application claiming such priority has been received by the Patent office no last than six months from the date of receipt of the earlier industrial design application. (...) Title VI. EXAMINATION OF APPLICATION Article 16. Formal examination of application After three months from the date of application Patent office carries out on it formal examination. (...) They can be made out by the applicant as the independent application with an establishment of a priority by date of their receipt in Patent office.
Language:English
Score: 763993.07 - https://www.wto.org/english/th...e/tjk_e/WTACCTJK6A1_LEG_12.pdf
Data Source: un
Date of filing of an application Article 15. Conversion of applications Article 16. (...) Priority may be established by the date of filing by the same applicant, with the Patent Office, of the earlier application, disclosing the invention if the application for which such priority is sought is filed not later than within twelve months from the filing date of the earlier application for the invention. (...) The provisions of part four of this article shall be extended to inventions from the date of notification by the applicant of the person using them about the filed application for the grant of a title of protection if this date is earlier than the date of publication of information about the application.
Language:English
Score: 762395.1 - https://www.wto.org/english/th...e/tjk_e/WTACCTJK6A1_LEG_13.pdf
Data Source: un
Applicant: Date: United Nations Dispute Tribunal Insert Applicant’s last name v. Secretary-General of the United Nations Application for suspension of action pending management evaluation Registry: To identify the Registry where your application should be filed, please refer to http://www.un.org/en/oaj/dispute/distribution.shtml Date of application: Counsel for Applicant: If self-represented, please state so. (...) Applicant: Name: Date: Signature: Legal representative (if applicable): Name: Date: Signature: PAGE Page 1 of 5 Form UNDT/F.3E rev. 31 January 2013
Language:English
Score: 762132.13 - https://www.un.org/en/internal...forms/applic_suspension_en.doc
Data Source: un
The priority may be established by the date of submission of the first identical application filed in accordance with interstate agreements on protection of industrial property to which the Republic Tajikistan is a party, if such application withdrawn by the applicant and between date of its priority and the date of receipt of the application by the Patent Office has passed not more than 12 months. 19.4. (...) The priority may be established by the date of receipt by the Patent Office of an earlier application of the same applicant disclosing such invention, utility model, industrial design, if the application for such priority entered not later than 12 months from the date of receipt of an earlier application. (...) If such applications are filed within three months from the date of receipt of notification requiring the division of the application, the priority of the divisional applications may be established by the date of receipt of the initial application by the Patent Office.
Language:English
Score: 761887.35 - https://www.wto.org/english/th.../tjk_e/WTACCTJK13A1_LEG_16.pdf
Data Source: un
The Filing and Management of Applications a) Filing Applications Applications may be directly filed with the Office for Protection or sent by registered mail. 4 b) Receiving Applications Upon receiving an application, the Office for Protection is required to do the following : - Check the list of documents required in an application; - Stamp the date the application was received; - Check the said list of documents against the actual number of documents; - Conduct a preliminarily check to see if the application has sufficient documents as required under the said point a) category 2 so as to enable a conclusion to be made on the receipt of the applications; - Send the applicant the stamped application form acknowledging the receiving date and the serial number of the application as well as the result of the document list examination with the full name of the receivers (this form replaces the receipt of application) c) Management of Applications A valid application is then divided into 2 parts: - One part is stored as the original application; - The rest is examined under the steps outlined in the provisions of this Circular. 7. (...) In the period of 90 days after the filing date of an application for the right of priority, organizations and individuals must complete the application in accordance with the Office For Protection’s regulations. (...) Procedures for the First Step (formality) of the Examination of the Application a) Fixing the Filing Date: - In the case of applications filed directly with the Office for Protection, the date on which the Office receives the application constitutes the filing date of the application; - In the case of applications filed by guaranteed mail, the date on which the Office for Protection receives the application from the post office constitutes the filing date of the application. b) Fixing the Valid Filing Date: - The valid filing date is the date on which the Office of Protection receives a complete and accurate application; 5 - In cases where the application needs to be modified and/ or amended, the valid filing date is the date on which the organizations or individuals have completed amendments requested by the Office for Protection. c) Determining the Validity of the Application In the period of 90 days after receiving the application, the Office for Protection must decide: - If the applicant can be classed as having the right to file an application; - If the new plant variety belongs on the protected species and genera list; - If the new plant variety is from countries that signed agreements with Vietnam or subscribed with Vietnam to international agreements concerning the new plant varieties; - If the new plant variety is commercially new; - If the denomination of the plant variety is proper. d) During the first step of the examination, the applicant has the right to rename the filed new plant variety and pay fees for that procedure. e) The contents of notification of the results of the first step of examination: ?
Language:English
Score: 761779.7 - https://www.wto.org/english/th..._e/vnm_e/WTACCVNM28_LEG_19.pdf
Data Source: un