State register of the hydraulic installations
The hydraulic installations, covered by this Law, shall be entered in the State Register of the Hydraulic Installations (hereinafter referred to as “Register”).
(...) Inspection of hydraulic installations
9
The inspection of hydraulic installations shall be organized and carried out by the State
Supervision Authority.
(...) Financial security for civil liability for harm, caused as a result of a
breakdown of a hydraulic installation
An owner of a hydraulic installation should have financial security for civil liability for harm, which may be caused as a result of a breakdown of its hydraulic installation (a complex of hydraulic installations).
Language:English
Score: 744426.8
-
https://unece.org/fileadmin/DA.../ModelLawFinal22-11-06_eng.pdf
Data Source: un
Floating techniques for installation of fibre-optic cables
L.57: Air-assisted installation of fibre-optic cables This Recommendation describes air-assisted methods for installing fibre-optic cables in ducts.
(...) Other installation techniques
L.35: Installation of fibre-optic cables in the access network The Recommendation gives guidance for installation in ducts, aerial installation and directly buried cables in the access network.
L.77: Installation of fibre-optic cables in sewer ducts This Recommendation describes methods to install ducts/fibre-optic cables inside sewer ducts.
Language:English
Score: 732343.75
-
https://www.itu.int/dms_pub/it.../0B/04/T0B0400003B2C01PDFE.pdf
Data Source: un
DRC Kinshasa AFTERM installed Aristel Voice switch installed
Yes Yes Completed
Lesotho Maseru AFTERM installed Telephone instrument
- Yes No requirement for Voice switch
Malawi Lilongwe AFTERM installed Aristel Voice switch installed
Yes Yes Completed
Mauritius Plaisance Integrated with in country switch
Integrated with in country switch
Yes To be finalised by Mauritius Completed
Mozambique Maputo AFTERM installed Aristel Voice switch installed
Yes Awaiting final approval from Mozambican Authorities
Completed installation of AFTERM and Aristel PABX on 29/05/2002.
Mozambique Beira AFTERM installed Aristel Voice switch installed
Yes Awaiting approval from Mozambican Authorities
Completed installation of AFTERM and Aristel PABX on 01/06/2002.
Namibia Windhoek Integrated with in country switch
Aristel Voice switch installed
- Yes Completed installation of Aristel PABX on 16 May 2002.
Language:English
Score: 729584.33
-
https://www.icao.int/WACAF/Doc...nts/APIRG/comsg_6/wp08_eng.pdf
Data Source: un
Question 4/6 - Infrastructure and installation considerations for cables and equipment
Français Español
Print Version
Home : ITU-T Home : Study Period 2001-2004
Question 4/6 - Infrastructure and installation considerations for cables and equipment
(New)
Background and justification
The privatization of telecommunication distribution and the growth of the internet has led to an increased number of trunk links on routes originally established by utilities to provide internal communication. (...) Recommendations to address the issues of new installations techniques are required to aid the establishment of the techniques.
Study items
Installation of cables along the railways
Installation of cables along or within the gas pipelines and the oil pipelines
Installation of optical fibre cables by blowing method
Installation of optical fibre cables by floating technique
Installation of signalling devices along underground cables
Installation of equipment for the different kinds of fibre applications
Infrastructure characteristics for cable installation (aerial, underground and inside buildings)
Relationships
IEC SC86A
ISO 138/SC 5
Deliverables
Recommendations on:
Installation of fibre optic cables along the railways
2003
Cable installation by blowing and floating techniques
2003
Infrastructure characteristics for telecommunication elements inside buildings
2003
Top - Feedback - Contact Us - Copyright © ITU 2004 All Rights Reserved Contact for this page : TSB EDH Updated : 2004-10-21
Language:English
Score: 727922.95
-
https://www.itu.int/ITU-T/2001-2004/com06/sg6-q4.html
Data Source: un
Ensure that the intended installation site is cleared and ready for immediate installation to
commence;
10. (...) Minimum staff required on site, for installation purposes:
- Engineers and/or technicians from the installation service supplier. (...) Are all installation
sites ready for installation?
l) Who in the CO can be contacted for queries?
Language:English
Score: 727578.5
-
https://www.unicef.org/supply/...n-Cold-Rooms-Freezer-Rooms.pdf
Data Source: un
By memorandum of 16 December 2013 to the Chief Human Resources
Officer, MONUSCO, the Applicant requested payment of the second instalment
of the lump-sum portion of his assignment grant (“second instalment of
assignment grant”), effective 13 December 2013.
5. (...) Following these discussions, the RSCE granted the Applicant
a pro rata payment of the second instalment of his assignment grant in the amount
of USD911,58 as “one month pro-rated amount”. (...) On 3 March 2015, the Applicant submitted a request for management
evaluation of the decision to prorate the second instalment of his assignment grant
(“First request for management evaluation”).
Language:English
Score: 727541.7
-
www.un.org/en/internalj...dt/judgments/undt-2016-209.pdf
Data Source: oaj
Question 6/6 - Installation of underground telecommunication cables in small trenches
Français Español
Print Version
Home : ITU-T Home : Study Period 2001-2004
Question 6/6 - Installation of underground telecommunication cables in small trenches
(New)
Background and justification
The need to save costs and to reduce time for the construction of underground infrastructures and for the installation of Telecommunications cables and the requirement to reduce the social impact of the excavation work, moves the operating companies to use new construction and installation techniques.
(...) Recommendations to address the issues of these new installation techniques and the related cables and components are required to aid their establishment.
Study items
Mini-trench installation technique
Micro-trench installation technique
Cable and components for mini-trench and micro-trench installation techniques
Relationships
Not identified
Deliverables
Recommendations on:
Mini-trench installation technique
2002
Micro-trench installation technique
2002
Design and characteristics of optical cable to be installed in micro-trench
2002
Design and characteristics of splice closures for micro-trench technique
2003
Top - Feedback - Contact Us - Copyright © ITU 2004 All Rights Reserved Contact for this page : TSB EDH Updated : 2004-10-21
Language:English
Score: 726330.13
-
https://www.itu.int/ITU-T/2001-2004/com06/sg6-q6.html
Data Source: un
K.20 : Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents
Français Español
Home : ITU-T : Publications : Recommendations : K Series : K.20
Recently posted - Search Recommendations
K.20 : Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents
Recommendation K.20
In force components
Number
Title
Status
K.20 (06/21)
Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents
In force
Guide (04/2012)
Guide on the use of the overvoltage resistibility Recommendations This guide assists test laboratories in implementing the correct tests for ITU-T K.20, K.21, and K.45 compliance testing. (...) In force
Superseded and Withdrawn components
Number
Title
Status
K.20 (11/88)
Resistibility of telecommunication switching equipment to overvoltages and overcurrents
Superseded
K.20 (03/91)
Resistibility of telecommunication switching equipment to overvoltages and overcurrents
Superseded
K.20 (03/93)
Resistibility of telecommunication switching equipment to overvoltages and overcurrents
Superseded
K.20 (10/96)
Resistibility of telecommunication switching equipment to overvoltages and overcurrents
Superseded
K.20 (02/00)
Resistibility of telecommunication equipment installed in a telecommunications centre to overvoltages and overcurrents
Superseded
K.20 (07/03)
Resistibility of telecommunication equipment installed in a telecommunications centre to overvoltages and overcurrents
Superseded
K.20 (2003) Erratum 1 (01/04)
Correction to table 7/K.20
Superseded
K.20 Amendment 1 (11/04)
New Appendix I - Floating transverse power induction and earth potential rise test for ports connected to external symmetric pair cables
Superseded
K.20 (04/08)
Resistibility of telecommunication equipment installed in a telecommunications centre to overvoltages and overcurrents
Superseded
K.20 (11/11)
Resistibility of telecommunication equipment installed in a telecommunications centre to overvoltages and overcurrents
Superseded
K.20 (04/15)
Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents
Superseded
K.20 (06/16)
Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents
Superseded
K.20 (12/16)
Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents
Superseded
K.20 (07/17)
Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents
Superseded
K.20 (10/18)
Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents
Superseded
K.20 (07/19)
Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents
Superseded
K.20 (11/19)
Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents
Superseded
Top - Feedback - Contact us - Copyright © ITU 2008 All Rights Reserved Contact for this page : ITU-T Publications Updated : 2021-09-13
Language:English
Score: 724689.2
-
https://www.itu.int/rec/T-REC-K.20
Data Source: un
Threshold quantity: That quantity of a listed hazardous substance present or liable to be present in an installation which, if exceeded, results in the classification of the installation as a major hazard installation.
(...) Inspection of major hazard installations
2.8.1. Major hazard installations should be regularly inspected in order to ensure that the installations are operated according to the appropriate level of safety. (...) Inspection of installations
3.1.7.1. Competent authorities should make arrangements to have major hazard installations inspected regularly.
3.1.7.2.
Language:English
Score: 724015.04
-
www.ilo.org/wcmsp5/grou...tiveinstrument/wcms_107829.pdf
Data Source: un
.) RSEQ-B3/3 Increased utilization of runway capacity by improved
real-time runway scheduling WAKE-B2/4 Wake turbulence separation minima based on
leader/follower static pairs-wise WAKE-B2/7 Time based wake separation minima for arrival based
on leader/follower static pair-wise
FUTURE: 2021 & beyond - Enhancements linked to ASBU thread
ECR-380: FDL Configuration enhancement HMI enhancement -not in scope of ASBU threads
FUTURE: 2021 & beyond - Enhancements linked to ASBU thread
▌ECR-358 STAR and Approach Enhancements APTA-B0/1 PBN Approaches (with basic capabilities) APTA-B1/2 PBN SID and STAR procedures (with advanced
capabilities)
FUTURE: 2021 & beyond - Enhancements linked to ASBU thread
ECR 367 Missed Approach RSEQ-B0/1 Arrival Management
▌ECR-365 Label Anti-Overlap HMI enhancement -not in scope of ASBU threads
▌ECR-366 Departure Path Monitoring RSEQ-B0/2 Departure Management
▌ECR-369: STS/ Extraction Situational awareness enhancement -not in scope of ASBU threads
FUTURE: 2021 & beyond - Enhancements linked to ASBU thread
▌ECR-371 Runway Mode Update (Phase 2) WAKE-B2/2 Dependent parallel approaches WAKE-B2/3 Independent segregated parallel operations
FUTURE: 2021 & beyond - Enhancements linked to ASBU thread
ECR-372: Area of Interest FRTO-B0/2 Airspace planning and Flexible Use of Airspace (FUA) ▌ECR-374: Aerodrome names in DEP and DEST
switches HMI enhancement -not in scope of ASBU threads ▌ECR-375: Multiple STCA Areas SNET-B1/1 Enhanced STCA with aircraft parameters ▌REGCAUSE Display NOPS-B1/1 Short Term ATFM measures
FUTURE: 2021 & beyond - Enhancements linked to ASBU thread
Asterix Cat 33 support ASUR-B0/1 Automatic Dependent Surveillance –Broadcast (ADS-
B)
FUTURE: 2021 & beyond - Enhancements linked to ASBU thread
ECR-389: Separation Probe Enhancement HMI enhancement -not in scope of ASBU threads
Future proofing ANSP investments –Roadmap to Future
B1 INSTALLED B1 INSTALLED B2 INSTALLED B2 INSTALLED B1 INSTALLED B1 INSTALLED B1 INSTALLED B3 INSTALLED B2 INSTALLED B2 INSTALLED B2 INSTALLED
B2 INSTALLED B1 INSTALLED B0 INSTALLED
TopSky -ATC already meets or exceeds the operational needs expressed for the ASBU thread.
ICAO is yet to conduct exploratory research in this topic.
ICAO is currently conducting exploratory research in this topic and is not yet ready to validate the concept.
Note: when each thread becomes mature it will be added to the Roadmap B2 INSTALLED B1 INSTALLED B0 INSTALLED B1 INSTALLED B1 INSTALLED B2 INSTALLED B2 INSTALLED B1 INSTALLED B1 INSTALLED B1 INSTALLED B3 INSTALLED B2 INSTALLED B2 INSTALLED B2 INSTALLED B1 INSTALLED B2 INSTALLED
acronyms ASBU :ICAO Aviation System Block Upgrades: HMI :human machine interface PBCS :Performance Based Communications and Surveillance STCA :short conflict alert MSAW : mamma safe altitude alert BADA :Base of Aircraft Data DAP FMS : Flight management system MTCD Medium Term Conflict Detection NTZ : No Transgression Zone SOIR : SIMULTANEOUS OPERATIONS ONPARALLEL OR NEAR-PARALLEL INSTRUMENT RUNWAYS SOIA : SIMULTANEOUS OPERATIONS ONPARALLEL OR NEAR-PARALLEL INSTRUMENT approach APMW : Approach Path Monitor warning ASTERIX : All Purpose Structured Eurocontrol Surveillance Information Exchange PRM : Precision Runway Monitor
ATM SYSTEM
Top sky ATM system
Top sky ATM system
Top sky ATM system
Slide Number 5
Comparison E-X to TopSky –ATC
New/Enhanced Safety Nets and Monitoring Aids
New/Enhanced Safety Nets and Monitoring Aids
New/Enhanced Safety Nets and Monitoring Aids
New/Enhanced Safety Nets and Monitoring Aids
New/Enhanced Safety Nets and Monitoring Aids
New/Enhanced Safety Nets and Aids
New/Enhanced Safety Nets and Monitoring Aids
New/Enhanced Safety Nets and Monitoring Aids
New/Enhanced FDP Functions
New/Enhanced FDP Functions
New/Enhanced FDP Functions
New/Enhanced FDP Functions
New/Enhanced FDP Functions
All NEW HMI
All NEW HMI
All NEW HMI
All NEW HMI
All NEW HMI
NEW: Release 20.2 -Enhancements linked to ASBU thread
NEW: Release 20.2 -Enhancements linked to ASBU thread
NEW: Release 20.2 -Enhancements linked to ASBU thread
NEW: Release 20.2 -Enhancements linked to ASBU thread
FUTURE: 2021 & beyond - Enhancements linked to ASBU thread
FUTURE: 2021 & beyond - Enhancements linked to ASBU thread
FUTURE: 2021 & beyond - Enhancements linked to ASBU thread
FUTURE: 2021 & beyond - Enhancements linked to ASBU thread
FUTURE: 2021 & beyond - Enhancements linked to ASBU thread
FUTURE: 2021 & beyond - Enhancements linked to ASBU thread
FUTURE: 2021 & beyond - Enhancements linked to ASBU thread
FUTURE: 2021 & beyond - Enhancements linked to ASBU thread
FUTURE: 2021 & beyond - Enhancements linked to ASBU thread
FUTURE: 2021 & beyond - Enhancements linked to ASBU thread
FUTURE: 2021 & beyond - Enhancements linked to ASBU thread
Future proofing ANSP investments –Roadmap to Future
Slide Number 41
acronyms
Thank you
Language:English
Score: 722620.26
-
https://www.icao.int/MID/Docum.../ATM%20SG7%20-%20PPT%2014G.pdf
Data Source: un