Home

Results 1 - 10 of 143,498 for installation. Search took 0.553 seconds.  
Sort by date/Sort by relevance
State register of the hydraulic installations The hydraulic installations, covered by this Law, shall be entered in the State Register of the Hydraulic Installations (hereinafter referred to as “Register”). (...) Inspection of hydraulic installations 9 The inspection of hydraulic installations shall be organized and carried out by the State Supervision Authority. (...) Financial security for civil liability for harm, caused as a result of a breakdown of a hydraulic installation An owner of a hydraulic installation should have financial security for civil liability for harm, which may be caused as a result of a breakdown of its hydraulic installation (a complex of hydraulic installations).
Language:English
Score: 744426.8 - https://unece.org/fileadmin/DA.../ModelLawFinal22-11-06_eng.pdf
Data Source: un
Floating techniques for installation of fibre-optic cables L.57: Air-assisted installation of fibre-optic cables This Recommendation describes air-assisted methods for installing fibre-optic cables in ducts. (...) Other installation techniques L.35: Installation of fibre-optic cables in the access network The Recommendation gives guidance for installation in ducts, aerial installation and directly buried cables in the access network. L.77: Installation of fibre-optic cables in sewer ducts This Recommendation describes methods to install ducts/fibre-optic cables inside sewer ducts.
Language:English
Score: 732343.75 - https://www.itu.int/dms_pub/it.../0B/04/T0B0400003B2C01PDFE.pdf
Data Source: un
DRC Kinshasa AFTERM installed Aristel Voice switch installed Yes Yes Completed Lesotho Maseru AFTERM installed Telephone instrument - Yes No requirement for Voice switch Malawi Lilongwe AFTERM installed Aristel Voice switch installed Yes Yes Completed Mauritius Plaisance Integrated with in country switch Integrated with in country switch Yes To be finalised by Mauritius Completed Mozambique Maputo AFTERM installed Aristel Voice switch installed Yes Awaiting final approval from Mozambican Authorities Completed installation of AFTERM and Aristel PABX on 29/05/2002. Mozambique Beira AFTERM installed Aristel Voice switch installed Yes Awaiting approval from Mozambican Authorities Completed installation of AFTERM and Aristel PABX on 01/06/2002. Namibia Windhoek Integrated with in country switch Aristel Voice switch installed - Yes Completed installation of Aristel PABX on 16 May 2002.
Language:English
Score: 729584.33 - https://www.icao.int/WACAF/Doc...nts/APIRG/comsg_6/wp08_eng.pdf
Data Source: un
Question 4/6 - Infrastructure and installation considerations for cables and equipment Français   Español   Print Version   Home : ITU-T Home : Study Period 2001-2004 Question 4/6 - Infrastructure and installation considerations for cables and equipment (New) Background and justification The privatization of telecommunication distribution and the growth of the internet has led to an increased number of trunk links on routes originally established by utilities to provide internal communication. (...) Recommendations to address the issues of new installations techniques are required to aid the establishment of the techniques. Study items Installation of cables along the railways Installation of cables along or within the gas pipelines and the oil pipelines Installation of optical fibre cables by blowing method Installation of optical fibre cables by floating technique Installation of signalling devices along underground cables Installation of equipment for the different kinds of fibre applications Infrastructure characteristics for cable installation (aerial, underground and inside buildings) Relationships IEC SC86A ISO 138/SC 5 Deliverables Recommendations on: Installation of fibre optic cables along the railways 2003 Cable installation by blowing and floating techniques 2003 Infrastructure characteristics for telecommunication elements inside buildings 2003   Top  -  Feedback  -  Contact Us  -  Copyright © ITU 2004  All Rights Reserved Contact for this page :  TSB EDH Updated : 2004-10-21    
Language:English
Score: 727922.95 - https://www.itu.int/ITU-T/2001-2004/com06/sg6-q4.html
Data Source: un
Ensure that the intended installation site is cleared and ready for immediate installation to commence; 10. (...) Minimum staff required on site, for installation purposes: - Engineers and/or technicians from the installation service supplier. (...) Are all installation sites ready for installation? l) Who in the CO can be contacted for queries?
Language:English
Score: 727578.5 - https://www.unicef.org/supply/...n-Cold-Rooms-Freezer-Rooms.pdf
Data Source: un
By memorandum of 16 December 2013 to the Chief Human Resources Officer, MONUSCO, the Applicant requested payment of the second instalment of the lump-sum portion of his assignment grant (“second instalment of assignment grant”), effective 13 December 2013. 5. (...) Following these discussions, the RSCE granted the Applicant a pro rata payment of the second instalment of his assignment grant in the amount of USD911,58 as “one month pro-rated amount”. (...) On 3 March 2015, the Applicant submitted a request for management evaluation of the decision to prorate the second instalment of his assignment grant (“First request for management evaluation”).
Language:English
Score: 727541.7 - www.un.org/en/internalj...dt/judgments/undt-2016-209.pdf
Data Source: oaj
Question 6/6 - Installation of underground telecommunication cables in small trenches Français   Español   Print Version   Home : ITU-T Home : Study Period 2001-2004 Question 6/6 - Installation of underground telecommunication cables in small trenches (New)   Background and justification The need to save costs and to reduce time for the construction of underground infrastructures and for the installation of Telecommunications cables and the requirement to reduce the social impact of the excavation work, moves the operating companies to use new construction and installation techniques. (...) Recommendations to address the issues of these new installation techniques and the related cables and components are required to aid their establishment. Study items Mini-trench installation technique Micro-trench installation technique Cable and components for mini-trench and micro-trench installation techniques Relationships Not identified Deliverables Recommendations on: Mini-trench installation technique 2002 Micro-trench installation technique 2002 Design and characteristics of optical cable to be installed in micro-trench 2002 Design and characteristics of splice closures for micro-trench technique 2003   Top  -  Feedback  -  Contact Us  -  Copyright © ITU 2004  All Rights Reserved Contact for this page :  TSB EDH Updated : 2004-10-21    
Language:English
Score: 726330.13 - https://www.itu.int/ITU-T/2001-2004/com06/sg6-q6.html
Data Source: un
K.20 : Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents   Français   Español     Home : ITU-T : Publications : Recommendations : K Series : K.20 Recently posted  -  Search Recommendations     K.20 : Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents Recommendation K.20 In force components Number Title Status K.20 (06/21)   Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents   In force Guide (04/2012)   Guide on the use of the overvoltage resistibility Recommendations   This guide assists test laboratories in implementing the correct tests for ITU-T K.20, K.21, and K.45 compliance testing. (...) In force     Superseded and Withdrawn components Number Title Status K.20 (11/88)   Resistibility of telecommunication switching equipment to overvoltages and overcurrents   Superseded K.20 (03/91)   Resistibility of telecommunication switching equipment to overvoltages and overcurrents   Superseded K.20 (03/93)   Resistibility of telecommunication switching equipment to overvoltages and overcurrents   Superseded K.20 (10/96)   Resistibility of telecommunication switching equipment to overvoltages and overcurrents   Superseded K.20 (02/00)   Resistibility of telecommunication equipment installed in a telecommunications centre to overvoltages and overcurrents   Superseded K.20 (07/03)   Resistibility of telecommunication equipment installed in a telecommunications centre to overvoltages and overcurrents   Superseded K.20 (2003) Erratum 1 (01/04)   Correction to table 7/K.20   Superseded K.20 Amendment 1 (11/04)   New Appendix I - Floating transverse power induction and earth potential rise test for ports connected to external symmetric pair cables   Superseded K.20 (04/08)   Resistibility of telecommunication equipment installed in a telecommunications centre to overvoltages and overcurrents   Superseded K.20 (11/11)   Resistibility of telecommunication equipment installed in a telecommunications centre to overvoltages and overcurrents   Superseded K.20 (04/15)   Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents   Superseded K.20 (06/16)   Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents   Superseded K.20 (12/16)   Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents   Superseded K.20 (07/17)   Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents   Superseded K.20 (10/18)   Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents   Superseded K.20 (07/19)   Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents   Superseded K.20 (11/19)   Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents   Superseded   Top  -  Feedback  -  Contact us  -  Copyright © ITU  2008 All Rights Reserved Contact for this page :  ITU-T Publications Updated : 2021-09-13  
Language:English
Score: 724689.2 - https://www.itu.int/rec/T-REC-K.20
Data Source: un
Threshold quantity: That quantity of a listed hazardous substance present or liable to be present in an installation which, if exceeded, results in the classification of the installation as a major hazard installation. (...) Inspection of major hazard installations 2.8.1. Major hazard installations should be regularly inspected in order to ensure that the installations are operated according to the appropriate level of safety. (...) Inspection of installations 3.1.7.1. Competent authorities should make arrangements to have major hazard installations inspected regularly. 3.1.7.2.
Language:English
Score: 724015.04 - www.ilo.org/wcmsp5/grou...tiveinstrument/wcms_107829.pdf
Data Source: un
.)  RSEQ-B3/3 Increased utilization of runway capacity by improved real-time runway scheduling  WAKE-B2/4 Wake turbulence separation minima based on leader/follower static pairs-wise  WAKE-B2/7 Time based wake separation minima for arrival based on leader/follower static pair-wise FUTURE: 2021 & beyond - Enhancements linked to ASBU thread ECR-380: FDL Configuration enhancement  HMI enhancement -not in scope of ASBU threads FUTURE: 2021 & beyond - Enhancements linked to ASBU thread  ▌ECR-358 STAR and Approach Enhancements  APTA-B0/1 PBN Approaches (with basic capabilities)  APTA-B1/2 PBN SID and STAR procedures (with advanced capabilities) FUTURE: 2021 & beyond - Enhancements linked to ASBU thread ECR 367 Missed Approach  RSEQ-B0/1 Arrival Management  ▌ECR-365 Label Anti-Overlap  HMI enhancement -not in scope of ASBU threads  ▌ECR-366 Departure Path Monitoring  RSEQ-B0/2 Departure Management  ▌ECR-369: STS/ Extraction  Situational awareness enhancement -not in scope of ASBU threads FUTURE: 2021 & beyond - Enhancements linked to ASBU thread  ▌ECR-371 Runway Mode Update (Phase 2)  WAKE-B2/2 Dependent parallel approaches  WAKE-B2/3 Independent segregated parallel operations FUTURE: 2021 & beyond - Enhancements linked to ASBU thread ECR-372: Area of Interest  FRTO-B0/2 Airspace planning and Flexible Use of Airspace (FUA)  ▌ECR-374: Aerodrome names in DEP and DEST switches  HMI enhancement -not in scope of ASBU threads  ▌ECR-375: Multiple STCA Areas  SNET-B1/1 Enhanced STCA with aircraft parameters  ▌REGCAUSE Display  NOPS-B1/1 Short Term ATFM measures FUTURE: 2021 & beyond - Enhancements linked to ASBU thread Asterix Cat 33 support  ASUR-B0/1 Automatic Dependent Surveillance –Broadcast (ADS- B) FUTURE: 2021 & beyond - Enhancements linked to ASBU thread ECR-389: Separation Probe Enhancement  HMI enhancement -not in scope of ASBU threads Future proofing ANSP investments –Roadmap to Future B1 INSTALLED B1 INSTALLED B2 INSTALLED B2 INSTALLED B1 INSTALLED B1 INSTALLED B1 INSTALLED B3 INSTALLED B2 INSTALLED B2 INSTALLED B2 INSTALLED B2 INSTALLED B1 INSTALLED B0 INSTALLED  TopSky -ATC already meets or exceeds the operational needs expressed for the ASBU thread.  ICAO is yet to conduct exploratory research in this topic.  ICAO is currently conducting exploratory research in this topic and is not yet ready to validate the concept.  Note: when each thread becomes mature it will be added to the Roadmap  B2 INSTALLED  B1 INSTALLED  B0 INSTALLED  B1 INSTALLED  B1 INSTALLED  B2 INSTALLED  B2 INSTALLED  B1 INSTALLED  B1 INSTALLED  B1 INSTALLED  B3 INSTALLED  B2 INSTALLED  B2 INSTALLED  B2 INSTALLED  B1 INSTALLED  B2 INSTALLED acronyms  ASBU :ICAO Aviation System Block Upgrades:  HMI :human machine interface  PBCS :Performance Based Communications and Surveillance  STCA :short conflict alert  MSAW : mamma safe altitude alert  BADA :Base of Aircraft Data  DAP  FMS : Flight management system  MTCD Medium Term Conflict Detection  NTZ : No Transgression Zone  SOIR : SIMULTANEOUS OPERATIONS ONPARALLEL OR NEAR-PARALLEL INSTRUMENT RUNWAYS  SOIA : SIMULTANEOUS OPERATIONS ONPARALLEL OR NEAR-PARALLEL INSTRUMENT approach  APMW : Approach Path Monitor warning  ASTERIX : All Purpose Structured Eurocontrol Surveillance Information Exchange  PRM : Precision Runway Monitor ATM SYSTEM Top sky ATM system Top sky ATM system Top sky ATM system Slide Number 5 Comparison E-X to TopSky –ATC New/Enhanced Safety Nets and Monitoring Aids New/Enhanced Safety Nets and Monitoring Aids New/Enhanced Safety Nets and Monitoring Aids New/Enhanced Safety Nets and Monitoring Aids New/Enhanced Safety Nets and Monitoring Aids New/Enhanced Safety Nets and Aids New/Enhanced Safety Nets and Monitoring Aids New/Enhanced Safety Nets and Monitoring Aids New/Enhanced FDP Functions New/Enhanced FDP Functions New/Enhanced FDP Functions New/Enhanced FDP Functions New/Enhanced FDP Functions All NEW HMI All NEW HMI All NEW HMI All NEW HMI All NEW HMI NEW: Release 20.2 -Enhancements linked to ASBU thread NEW: Release 20.2 -Enhancements linked to ASBU thread NEW: Release 20.2 -Enhancements linked to ASBU thread NEW: Release 20.2 -Enhancements linked to ASBU thread FUTURE: 2021 & beyond - Enhancements linked to ASBU thread FUTURE: 2021 & beyond - Enhancements linked to ASBU thread FUTURE: 2021 & beyond - Enhancements linked to ASBU thread FUTURE: 2021 & beyond - Enhancements linked to ASBU thread FUTURE: 2021 & beyond - Enhancements linked to ASBU thread FUTURE: 2021 & beyond - Enhancements linked to ASBU thread FUTURE: 2021 & beyond - Enhancements linked to ASBU thread FUTURE: 2021 & beyond - Enhancements linked to ASBU thread FUTURE: 2021 & beyond - Enhancements linked to ASBU thread FUTURE: 2021 & beyond - Enhancements linked to ASBU thread FUTURE: 2021 & beyond - Enhancements linked to ASBU thread Future proofing ANSP investments –Roadmap to Future Slide Number 41 acronyms Thank you
Language:English
Score: 722620.26 - https://www.icao.int/MID/Docum.../ATM%20SG7%20-%20PPT%2014G.pdf
Data Source: un