Inform UNICEF of the tentative date for Substantial Completion of the works Facilitate testing of all the systems installed and provide UNICEF with test certificates including Electrical system, plumbing system testing, lightening, water supply system and others as applicable. (...) Provide, in collaboration with UNICEF, to the contractor a defect list upon substantial completion of the works. Ensure that all defects are fixed by the contractor Facilitate the handover of the completed facilities to the local authorities and beneficiaries.
Language:English
Score: 1511666.6 - https://www.unicef.org/laos/in...tion-works-six-cold-chain-hubs
Data Source: un
SEVENTH ANNUAL PROGRESS REPORT ON THE STRATEGIC HERITAGE PLAN OF THE UNITED NATIONS OFFICE AT GENEVA :13TH REPORT OF THE ADVISORY COMMITTEE ON ADMINISTRATIVE AND BUDGETARY QUESTIONS ON THE PROPOSED PROGRAMME BUDGET FOR 2021
These include such risks as the impact of contractor claims and governmental restrictions related to the COVID-19 pandemic, the potential for the guaranteed maximum price of the renovation contract to vary significantly from the estimated cost, or to be delayed, and uncertainty as to the price to be obtained from the market through the upcoming procurement process for the renovation of building E. (...) The Board highlights the risk that the negotiations between the United Nations and the contractor may fail or take longer than planned or may result in an agreement that has negative effects on the scope, the time schedule and/or the costs of the project, and stresses the need for strategies to mitigate that risk (ibid., paras. 57–64). 11. (...) The model allows a project team to create a shared project with integrated information and provides a seamless link between the project owner, designers, construction professionals, contractor and end users of a construction project. 18.
Language:English
Score: 1500225.6 - https://daccess-ods.un.org/acc...t?open&DS=A/75/7/ADD.12&Lang=E
Data Source: ods
SEISMIC MITIGATION RETROFIT AND LIFE-CYCLE REPLACEMENTS PROJECT AT THE ECONOMIC AND SOCIAL COMMISSION FOR ASIA AND THE PACIFIC PREMISES IN BANGKOK :9TH REPORT OF THE ADVISORY COMMITTEE ON ADMINISTRATIVE AND BUDGETARY QUESTIONS ON THE PROPOSED PROGRAMME BUDGET FOR 2022
Mechanical, electrical and plumbing 4. Mechanical, electrical and plumbing 5. (...) In order to mitigate this risk, the team included in the general contractor request for proposals the requirement for the contractor to purchase construction materials at fixed pricing up front, and to warehouse them in a secure location, taking into account that fluctuations in market rates are beyond the control of the project team or the United Nations. Furthermore, the project team is working with the general contractor and the procurement team to identify proposals for value engineering to offset some of the cost overruns resulting from the increase in the currency exchange rate.
Language:English
Score: 1500225.6 - https://daccess-ods.un.org/acc...et?open&DS=A/76/7/ADD.8&Lang=E
Data Source: ods
PROGRESS ON THE REPLACEMENT OF OFFICE BLOCKS A-J AT THE UNITED NATIONS OFFICE AT NAIROBI : REPORT OF THE SECRETARY-GENERAL
They comprise office space, medical and security functions, warehousing, contractors ’ workshops, a canteen and other operational facilities. (...) Integrated risk management will be performed at a local level by the United Nations Office at Nairobi dedicated project management team and its specialized consultants and contractors. Once on board, the Project Manager will coordinate the efforts to be made by all parties involved, in particular the team members, consultants and contractors. (...) It would be able to house the data centre, security control room, catering, medical, contractors, security locker rooms, drivers’ lounge and logistics facilities.
Language:English
Score: 1494029.5 - https://daccess-ods.un.org/acc...sf/get?open&DS=A/73/344&Lang=E
Data Source: ods
Be careful not to move the plumb-line from its vertical position. Read the scale at the point where the plumb-line intersects the degree graduation. (...) Most walls are vertical Setting out and checking verticals with a plumb-line 2. A plumb-line is a simple device which forms a vertical line* . (...) In a plumb-line, a fairly heavy object , the plumb , is attached to the end of a thin line .
Language:English
Score: 1482338.7 - https://www.fao.org/fishery/st...ng/General/x6707e/x6707e04.htm
Data Source: un
Be careful not to move the plumb-line from its vertical position. Read the scale at the point where the plumb-line intersects the degree graduation. (...) Most walls are vertical Setting out and checking verticals with a plumb-line 2. A plumb-line is a simple device which forms a vertical line* . (...) In a plumb-line, a fairly heavy object , the plumb , is attached to the end of a thin line .
Language:English
Score: 1482338.7 - https://www.fao.org/fishery/do...ng/General/x6707e/x6707e04.htm
Data Source: un
PROPOSAL FOR THE REPLACEMENT OF OFFICE BLOCKS A-J AT THE UNITED NATIONS OFFICE AT NAIROBI : REPORT OF THE SECRETARY-GENERAL
They comprise office space, medical and security functions, warehousing, contractors’ workshops, a canteen and other operational facilities. (...) In addition, the intended original design for A/72/375 5/28 17-14424 natural cross (passive) ventilation is not functioning adequately owing to the solid load-bearing walls located on either side of the central corridor. 19. Plumbing facilities. The plumbing fixtures installed in the washroom facilities are antiquated and inefficient and result in a significant waste of water. (...) Overall, the drainage structures, sewage systems, plumbing systems, piping systems and pressure control systems do not comply with the current prevailing local and international standards and require an upgrade. 20.
Language:English
Score: 1474951.9 - https://daccess-ods.un.org/acc...sf/get?open&DS=A/72/375&Lang=E
Data Source: ods
In coordination with donor agencies, health institutions and local governments, the EIIP, through its local resource-based approaches and community development approaches, can contribute to raising awareness and training of communities, workers and contractors to promote and improve basic WASH and primary health care services for preventing the spread of COVID-19. (...) Organizing, training and employing people (community contractors/others) to provide services for communities, including safety, hygiene and health measures like disinfection of public areas (health centres, pharmacies, and markets), distribution of masks, care support services, etc. 4. (...) Those already trained in plumbing, masonry and maintenance of water provision systems could become “essential service providers” at community level.
Language:English
Score: 1471085.2 - https://www.ilo.org/wcmsp5/gro...ts/publication/wcms_744731.pdf
Data Source: un
13/12/2013 10:00
The Commission, the Office of Central Support Services and the contractors were cooperating in implementing value engineering in order to control costs. (...) To that end, it was monitoring construction output closely and was working with the contractors to develop resourceful ways to expedite the work while maintaining quality. 5. (...) The carpets were being replaced and the plumbing and drainage system were being upgraded to reduce the risk of internal leaks in the building.
Language:English
Score: 1467278.9 - daccess-ods.un.org/acce...?open&DS=A/C.5/68/SR.23&Lang=E
Data Source: ods
SEISMIC MITIGATION RETROFIT AND LIFE-CYCLE REPLACEMENTS PROJECT AT THE ECONOMIC AND SOCIAL COMMISSION FOR ASIA AND THE PACIFIC PREMISES IN BANGKOK :11TH REPORT OF THE ADVISORY COMMITTEE ON ADMINISTRATIVE AND BUDGETARY QUESTIONS ON THE PROPOSED PROGRAMME BUDGET FOR 2021
The ESCAP project management and support team will continue to comprise the following positions: 1 P-5 (Project Manager), 1 P-4 (Architect/Engineer), 1 P-3 (Procurement Officer), 2 National Professional Officer (Building Mechanical- Electrical-Plumbing Engineer and Logistics and Coordination Officer), and 5 Local level, as well as a cost-shared P-4 (Project Coordinator). (...) The Secretary-General describes a number of comprehensive measures to mitigate the potential impact of the COVID-19 pandemic, including the following: (a) The general contractor request for proposals will stipulate the advance purchase, at fixed pricing, of construction materials. (...) The Committee was also informed that the results of the second survey were expected in the first quarter of 2021, which would allow information on additional hazardous materials in need of removal to be included in the contractor’s scope of work prior to the start of the construction phase in the second quarter of 2021.