Home

Results 41 - 50 of 21,019 for plumbing contractors. Search took 3.53 seconds.  
Sort by date/Sort by relevance
SEISMIC MITIGATION RETROFIT AND LIFE-CYCLE REPLACEMENTS PROJECT AT THE ECONOMIC AND SOCIAL COMMISSION FOR ASIA AND THE PACIFIC PREMISES IN BANGKOK :11TH REPORT OF THE ADVISORY COMMITTEE ON ADMINISTRATIVE AND BUDGETARY QUESTIONS ON THE PROPOSED PROGRAMME BUDGET FOR 2021
The ESCAP project management and support team will continue to comprise the following positions: 1 P-5 (Project Manager), 1 P-4 (Architect/Engineer), 1 P-3 (Procurement Officer), 2 National Professional Officer (Building Mechanical- Electrical-Plumbing Engineer and Logistics and Coordination Officer), and 5 Local level, as well as a cost-shared P-4 (Project Coordinator). (...) The Secretary-General describes a number of comprehensive measures to mitigate the potential impact of the COVID-19 pandemic, including the following: (a) The general contractor request for proposals will stipulate the advance purchase, at fixed pricing, of construction materials. (...) The Committee was also informed that the results of the second survey were expected in the first quarter of 2021, which would allow information on additional hazardous materials in need of removal to be included in the contractor’s scope of work prior to the start of the construction phase in the second quarter of 2021.
Language:English
Score: 1449205.9 - https://daccess-ods.un.org/acc...t?open&DS=A/75/7/ADD.10&Lang=E
Data Source: ods
CONSTRUCTION OF A NEW FACILITY FOR THE INTERNATIONAL RESIDUAL MECHANISM FOR CRIMINAL TRIBUNALS, ARUSHA BRANCH : REPORT OF THE SECRETARY-GENERAL
The architectural consultants monitor that works conducted by the contractor proceed according to design and quality specifications, review the contractor’s material submissions and work programmes, evaluate change orders and substitutions proposed by the contractor and recommend interim payments to the contractor. 15. (...) In November 2015, the contractor completed the structure of the ground floor of the office building. (...) As at January 2016, the majority of such high-risk procurement items, including the heat, ventilation and air-conditioning system and electrical and plumbing material, as well as interior and exterior finishes, have been ordered by the contractor.
Language:English
Score: 1448474.8 - https://daccess-ods.un.org/acc...sf/get?open&DS=A/70/698&Lang=E
Data Source: ods
TERMINOLOGY/QUESTIONNAIRE ON BENCHMARKING PORTS INFRASTRUCTURE CONSTRUCTION COSTS
It is used to weigh loads and burden wagons for the purposes of contractors’ settlements and safety measures. ($/unit). 26. (...) Water supply infrastructure of the port includes: (a) Inlet of underground water; (b) Pumping station and water treatment works; (c) Retention basins; (d) Pump and pressure boosting systems. and pressure tank units; (e) Main and distribution water pipes with plumbing and support devices. G. Sewage infrastructure 31. (...) Sewage system infrastructure of the port includes: (a) Networks, tunnels and collectors of sewage system, both gravity-flow and powered; (b) Sewage pumping station with reservoirs, plumbing and hydraulic systems as well as power and control devices.
Language:English
Score: 1446165.6 - https://daccess-ods.un.org/acc.../TRANS/WP.5/GE.4/2018/4&Lang=E
Data Source: ods
The purpose of the contract is to ensure that the OSESGY/UNMHA premises are safe, and that the building systems, infrastructure and equipment are, at all times, operational and maintained to their optimal efficiency. 2. The Contractor will be responsible for providing competent, experienced and sufficient work force, and spare parts to carry out preventive maintenance, and as and when required maintenance and repairs for civil, electrical, plumbing, fire, surveillance and security, solar and IT systems. The Contractor shall be responsible for all tools and equipment (i.e. lifting equipment, scaffolding, welding equipment, air compressors, hydraulic jacks etc.) to carry out the services. 3.
Language:English
Score: 1441522.3 - https://www.un.org/Depts/ptd/s...pts.ptd/files/pdf/eoi20067.pdf
Data Source: un
Inadequate plumbing systems likely contributed to SARS transmission Global Regions WHO Regional websites Africa Americas South-East Asia Europe Eastern Mediterranean Western Pacific When autocomplete results are available use up and down arrows to review and enter to select. (...) Meeting in Rome, an international group of WHO experts reviewed the transmission risks related to the current state of plumbing systems around the world and how inadequate construction and maintenance practices could contribute to the spread of SARS. (...) The Consultation emphasized that the solution – proper plumbing – is a simple public health measure which is often overlooked but can be addressed at minimal extra cost.
Language:English
Score: 1434693.9 - https://www.who.int/news/item/...ntributed-to-sars-transmission
Data Source: un
STRATEGIC HERITAGE PLAN OF THE UNITED NATIONS OFFICE AT GENEVA : NOTE / BY THE SECRETARY-GENERAL
It is a constant challenge for the strategic heritage plan project team to ensure that the contractors fulfil their contractual obligations. The strategic heritage plan team also needs to continue to clearly identify and address other risks in terms of time and cost, e.g. potential conflicts with the conference schedule. (...) Project progress To date, the contractor for the construction work has not met the stipulated deadlines for the early sections of work, which were 15 December 2017 and 16 February 2018. (...) Furthermore, unexpected ground conditions have required extra work, such as a retaining wall, for which an extension of time has been agreed with the contractor, meaning a revised completion date of 13 January 2020 instead of 29 November 2019.
Language:English
Score: 1412856.5 - https://daccess-ods.un.org/acc...sf/get?open&DS=A/73/157&Lang=E
Data Source: ods
Brief Description of Requirements: UNOG seeks qualified contractors to undertake works to construct the NPB, the construction services include but are not limited to: Superficial Excavation; Main Structure; Structural reinforcing and new opening to an existing underground parking structure; Façade; Roof; including green planted roofs, parts of the roofs are accessible roof terraces; Architectural Finishes; Furniture, Fixtures and Equipment ("FFE"); Landscaping; Mechanical, Electrical and Plumbing Construction ("MEP"); Building Information Modeling ("BIM"); Testing, Commissioning, Handover, Training; Defects Liability and Warranty Works; Consultation and coordination with the applicable authorities. (...) Brief Description of the Baseline Requirements: UNOG seeks qualified contractors to undertake enabling works, the services include but are not limited to: Site clearance; Dismantling works; Temporary installations; Special foundations, retaining structures, support to basement, excavations and waterproofing; construction of three arrays of soldier pile walls for soil retention (approximately 3’000 m²); Basement Excavation: excavation and earthworks for the preparation of a working platform over the entire surface of the building construction area, storage of part of the soil (30’000 m³) in the surrounding areas and infills according to the landscaping project, and transportation of the excavated soil to external dump areas (13’000 m³); Landscaping and tree relocation upon completion of the construction of Building H.
Language:English
Score: 1410571 - https://www.ungeneva.org/en/pr...ocurement/closed-opportunities
Data Source: un
Brief Description of Requirements: UNOG seeks qualified contractors to undertake works to construct the NPB, the construction services include but are not limited to: Superficial Excavation; Main Structure; Structural reinforcing and new opening to an existing underground parking structure; Façade; Roof; including green planted roofs, parts of the roofs are accessible roof terraces; Architectural Finishes; Furniture, Fixtures and Equipment ("FFE"); Landscaping; Mechanical, Electrical and Plumbing Construction ("MEP"); Building Information Modeling ("BIM"); Testing, Commissioning, Handover, Training; Defects Liability and Warranty Works; Consultation and coordination with the applicable authorities. (...) Brief Description of the Baseline Requirements: UNOG seeks qualified contractors to undertake enabling works, the services include but are not limited to: Site clearance; Dismantling works; Temporary installations; Special foundations, retaining structures, support to basement, excavations and waterproofing; construction of three arrays of soldier pile walls for soil retention (approximately 3’000 m²); Basement Excavation: excavation and earthworks for the preparation of a working platform over the entire surface of the building construction area, storage of part of the soil (30’000 m³) in the surrounding areas and infills according to the landscaping project, and transportation of the excavated soil to external dump areas (13’000 m³); Landscaping and tree relocation upon completion of the construction of Building H.
Language:English
Score: 1410571 - https://www.ungeneva.org/ru/pr...ocurement/closed-opportunities
Data Source: un
Brief Description of Requirements: UNOG seeks qualified contractors to undertake works to construct the NPB, the construction services include but are not limited to: Superficial Excavation; Main Structure; Structural reinforcing and new opening to an existing underground parking structure; Façade; Roof; including green planted roofs, parts of the roofs are accessible roof terraces; Architectural Finishes; Furniture, Fixtures and Equipment ("FFE"); Landscaping; Mechanical, Electrical and Plumbing Construction ("MEP"); Building Information Modeling ("BIM"); Testing, Commissioning, Handover, Training; Defects Liability and Warranty Works; Consultation and coordination with the applicable authorities. (...) Brief Description of the Baseline Requirements: UNOG seeks qualified contractors to undertake enabling works, the services include but are not limited to: Site clearance; Dismantling works; Temporary installations; Special foundations, retaining structures, support to basement, excavations and waterproofing; construction of three arrays of soldier pile walls for soil retention (approximately 3’000 m²); Basement Excavation: excavation and earthworks for the preparation of a working platform over the entire surface of the building construction area, storage of part of the soil (30’000 m³) in the surrounding areas and infills according to the landscaping project, and transportation of the excavated soil to external dump areas (13’000 m³); Landscaping and tree relocation upon completion of the construction of Building H.
Language:English
Score: 1410571 - https://www.ungeneva.org/es/pr...ocurement/closed-opportunities
Data Source: un
Brief Description of Requirements: UNOG seeks qualified contractors to undertake works to construct the NPB, the construction services include but are not limited to: Superficial Excavation; Main Structure; Structural reinforcing and new opening to an existing underground parking structure; Façade; Roof; including green planted roofs, parts of the roofs are accessible roof terraces; Architectural Finishes; Furniture, Fixtures and Equipment ("FFE"); Landscaping; Mechanical, Electrical and Plumbing Construction ("MEP"); Building Information Modeling ("BIM"); Testing, Commissioning, Handover, Training; Defects Liability and Warranty Works; Consultation and coordination with the applicable authorities. (...) Brief Description of the Baseline Requirements: UNOG seeks qualified contractors to undertake enabling works, the services include but are not limited to: Site clearance; Dismantling works; Temporary installations; Special foundations, retaining structures, support to basement, excavations and waterproofing; construction of three arrays of soldier pile walls for soil retention (approximately 3’000 m²); Basement Excavation: excavation and earthworks for the preparation of a working platform over the entire surface of the building construction area, storage of part of the soil (30’000 m³) in the surrounding areas and infills according to the landscaping project, and transportation of the excavated soil to external dump areas (13’000 m³); Landscaping and tree relocation upon completion of the construction of Building H.
Language:English
Score: 1410571 - https://www.ungeneva.org/ar/pr...ocurement/closed-opportunities
Data Source: un