Home

Results 81 - 90 of 709,606 for provide details. Search took 11.013 seconds.  
Sort by date/Sort by relevance
Element Implementation Status 1 Element Description: PBN Approach Procedures with vertical guidance (LPV, LNAV/VNAV minima, using SBAS and Baro VNAV) Status N/A Status Details 2 Element Description: PBN Approach Procedures without vertical guidance (LP, LNAV minima; using SBAS) RWY07/implemented RWy25/partially Status/Implemented Status Details 3 Element Description: GBAS Landing System (GLS) Approach procedures Date Planned/Implemented Status/NA Status Details Achieved Benefits Access Capacity Efficiency  Environment Safety  Implementation Challenges Ground system Implementation Avionics Implementation  Procedures Availability  Operational Approvals Notes: procedures are completed awaiting approval 3 of 13 STATE Antigua/Barbuda ASBU Air Navigation Reporting Form (ANRF) PIA 2 Block - Module B0 - AMET Date 19/10/ 2016 Module Description: Global, regional and local meteorological information: a) forecasts provided by world area forecast centres (WAFC), volcanic ash advisory centres (VAAC) and tropical cyclone advisory centres (TCAC); b) aerodrome warnings to give concise information of meteorological conditions that could adversely affect all aircraft at an aerodrome including wind shear; and c) SIGMETs to provide information on occurrence or expected occurrence of specific en-route weather phenomena which may affect the safety of aircraft operations and other operational meteorological (OPMET) information, including METAR/SPECI and TAF, to provide routine and special observations and forecasts of meteorological conditions occurring or expected to occur at the aerodrome. (...) Element Implementation Status 1 Element Description: Aeronautical Information Exchange Model (AIXM) 30/09/2018/Need Status/Planning Status Details 2 Element Description: eAIP Implemented Status/Implemented Status Details 3 Element Description: Digital NOTAM 30/03/2017 Status/Developing Status Details will be provided by Trinidad and Tobago should be ready by first quarter of next year 4 Element Description: eTOD 30/09/2018 Status/Planning Status Details 5 Element Description: (Identified by NACC) WGS-84 Implemented Status/Implemented Status Details was implemented at the end of 2014 6 Element Description: QMS for AIM 29/12/2017 Status/Partially implemented Status Details awaiting signed LOA with Trinidad and Tobago Achieved Benefits Access Capacity Efficiency  Environment Safety  Implementation Challenges Ground system Implementation  Avionics Implementation 6 of 13 STATE Procedures Availability Operational Approvals Notes All are internal changes 7 of 13 STATE Antigua and Barbuda ASBU Air Navigation Reporting Form (ANRF) PIA 3 Block - Module B0 - ACAS Date 19/10/2016 Module Description: Provides short-term improvements to existing airborne collision avoidance systems (ACAS) to reduce nuisance alerts while maintaining existing levels of safety. (...) Element Implementation Status 1 Element Description: Short Term Conflict Alert (STCA) Not Applicable Status/NA Status Details 2 Element Description: Area Proximity Warning (APW) Not Applicable Status/NA Status Details 3 Element Description: Minimum Safe Altitude Warning (MSAW) Not Applicable Status/NA Status Details 4 Element Description: Medium Term Conflict Alert (MTCA) Not Applicable Status/NA Status Details Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals Notes 12 of 13 STATE Antigua and Barbuda ASBU Air Navigation Reporting Form (ANRF) PIA 4 Block - Module B0 - CCO Date 19/10/2016 Module Description: Implements continuous climb operations (CCO) in conjunction with Performance-based Navigation (PBN) to provide opportunities to optimize throughput, improve flexibility, enable fuel-efficient climb profiles, and increase capacity at congested terminal areas.
Language:English
Score: 621737.3 - https://www.icao.int/NACC/Docu...Groups/ANIWG/ASBU/ASBU-ATG.pdf
Data Source: un
No 18) If yes, please provide details: 19) Article 16 (Sales to and by minors)? Yes 20) If yes, please provide details: A few Associations have provided public support and raised awareness for ending sales to minors. (...) No 22) If yes, please provide details: 23) Article 19 (Liability)? No 24) If yes, please provide details: 25) Article 20 (Research, surveillance and exchange of information)?
Language:English
Score: 621354.54 - https://www.who.int/fctc/cop/Reports_WFPHA.pdf
Data Source: un
Main partners: Ministry of Agriculture and Hydraulic Works | General Direction of Sectoral Studies and Statistics (DGESS) Permanent Secretariat for the Coordination of Agricultural Sectoral Policies (SP/CPSA) Country indicators at a glance Database Latest publications on Burkina Faso Highlights on Burkina Faso  Burundi Details Details MAFAP has launched its activities in Burundi in 2015 with the aim to provide technical support to the Government in monitoring and analyzing agricultural policies. (...) Main partners: Ethiopian Development Research Institute (EDRI) Ministry of Agriculture Ministry of Finance and Economic Development Ethiopian Commodity Exchange Authority Ethiopian Agricultural Transformation Agency Country indicators at a glance Database Latest publications on Ethiopia Highlights on Ethiopia  Ghana Details Details The second phase of MAFAP started in 2015 in Ghana with the objective to provide support to the Government on agricultural policy analysis and identification of suitable reforms options. (...) Main partners: Ministry of Agriculture, Irrigation and Water Development Country indicators at a glance Database Latest publications on Malawi Highlights on Malawi  Mali Details Details MAFAP is providing assistance to the Government of Mali to monitor and analyse price incentives in selected agricultural value chains (i.e. rice, cotton, maize, cattle, sorghum and milk), as well as public expenditure in support of food and agriculture.
Language:English
Score: 620691 - https://www.fao.org/in-action/...mme-overview/where-we-work/ru/
Data Source: un
Main partners: Ministry of Agriculture and Hydraulic Works | General Direction of Sectoral Studies and Statistics (DGESS) Permanent Secretariat for the Coordination of Agricultural Sectoral Policies (SP/CPSA) Country indicators at a glance Database Latest publications on Burkina Faso Highlights on Burkina Faso  Burundi Details Details MAFAP has launched its activities in Burundi in 2015 with the aim to provide technical support to the Government in monitoring and analyzing agricultural policies. (...) Main partners: Ethiopian Development Research Institute (EDRI) Ministry of Agriculture Ministry of Finance and Economic Development Ethiopian Commodity Exchange Authority Ethiopian Agricultural Transformation Agency Country indicators at a glance Database Latest publications on Ethiopia Highlights on Ethiopia  Ghana Details Details The second phase of MAFAP started in 2015 in Ghana with the objective to provide support to the Government on agricultural policy analysis and identification of suitable reforms options. (...) Main partners: Ministry of Agriculture, Irrigation and Water Development Country indicators at a glance Database Latest publications on Malawi Highlights on Malawi  Mali Details Details MAFAP is providing assistance to the Government of Mali to monitor and analyse price incentives in selected agricultural value chains (i.e. rice, cotton, maize, cattle, sorghum and milk), as well as public expenditure in support of food and agriculture.
Language:English
Score: 620691 - https://www.fao.org/in-action/...mme-overview/where-we-work/ar/
Data Source: un
Main partners: Ministry of Agriculture and Hydraulic Works | General Direction of Sectoral Studies and Statistics (DGESS) Permanent Secretariat for the Coordination of Agricultural Sectoral Policies (SP/CPSA) Country indicators at a glance Database Latest publications on Burkina Faso Highlights on Burkina Faso  Burundi Details Details MAFAP has launched its activities in Burundi in 2015 with the aim to provide technical support to the Government in monitoring and analyzing agricultural policies. (...) Main partners: Ethiopian Development Research Institute (EDRI) Ministry of Agriculture Ministry of Finance and Economic Development Ethiopian Commodity Exchange Authority Ethiopian Agricultural Transformation Agency Country indicators at a glance Database Latest publications on Ethiopia Highlights on Ethiopia  Ghana Details Details The second phase of MAFAP started in 2015 in Ghana with the objective to provide support to the Government on agricultural policy analysis and identification of suitable reforms options. (...) Main partners: Ministry of Agriculture, Irrigation and Water Development Country indicators at a glance Database Latest publications on Malawi Highlights on Malawi  Mali Details Details MAFAP is providing assistance to the Government of Mali to monitor and analyse price incentives in selected agricultural value chains (i.e. rice, cotton, maize, cattle, sorghum and milk), as well as public expenditure in support of food and agriculture.
Language:English
Score: 620691 - https://www.fao.org/in-action/...mme-overview/where-we-work/en/
Data Source: un
Element Implementation Status 1 Element Description: New PANS-ATM wake turbulence categories and separation minima Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 2 Element Description: Dependent diagonal paired approach procedures for parallel runways with centrelines spaced less than 760 meters (2,500 feet) apart Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 3 Element Description: Wake independent departure and arrival operations (WIDAO) for parallel runways with centrelines spaced less than 760 meters (2,500 feet) apart Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 4 Element Description: Wake turbulence mitigation for departures (WTMD) procedures for parallel runways with centrelines spaced less than 760 meters (2,500 feet) apart based on observed crosswinds Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 5 Element Description: 6 wake turbulence categories and separation minima Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals Notes [STATE] ASBU Air Navigation Reporting Form (ANRF) PIA 1 Block - Module B0 - AMET Date Month XX, 2017 Module Description: Global, regional and local meteorological information: a) forecasts provided by world area forecast centres (WAFC), volcanic ash advisory centres (VAAC) and tropical cyclone advisory centres (TCAC); b) aerodrome warnings to give concise information of meteorological conditions that could adversely affect all aircraft at an aerodrome including wind shear; and c) SIGMETs to provide information on occurrence or expected occurrence of specific enroute weather phenomena which may affect the safety of aircraft operations and other operational meteorological (OPMET) information, including METAR/SPECI and TAF, to provide routine and special observations and forecasts of meteorological conditions occurring or expected to occur at the aerodrome. (...) Element Implementation Status 1 Element Description: AIDC to provide initial flight data to adjacent ATSUs Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 2 Element Description: AIDC to update previously coordinated flight data Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 3 Element Description: AIDC for control transfer Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 4 Element Description: AIDC to transfer CPDLC logon information to the Next Data Authority Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals Notes [STATE] ASBU Air Navigation Reporting Form (ANRF) PIA 3 Block - Module B0 - ACAS Date Month XX, 2017 Module Description: To provide short-term improvements to existing airborne collision avoidance systems (ACAS) to reduce nuisance alerts while maintaining existing levels of safety. (...) Element Implementation Status 1 Element Description: ATSA-AIRB Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 2 Element Description: ATSA-VSA Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals Notes [STATE] ASBU Air Navigation Reporting Form (ANRF) PIA 3 Block - Module B0 - ASUR Date Month XX, 2017 Module Description: To provide initial capability for lower cost ground surveillance supported by new technologies such as ADS-B OUT and wide area multilateration (MLAT) systems.
Language:English
Score: 620148.3 - https://www.icao.int/NACC/Docu...d%20GANP%20rev%2008022018.docx
Data Source: un
Element Implementation Status 1 Element Description: New PANS-ATM wake turbulence categories and separation minima Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 2 Element Description: Dependent diagonal paired approach procedures for parallel runways with centrelines spaced less than 760 meters (2,500 feet) apart Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 3 Element Description: Wake independent departure and arrival operations (WIDAO) for parallel runways with centrelines spaced less than 760 meters (2,500 feet) apart Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 4 Element Description: Wake turbulence mitigation for departures (WTMD) procedures for parallel runways with centrelines spaced less than 760 meters (2,500 feet) apart based on observed crosswinds Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 5 Element Description: 6 wake turbulence categories and separation minima Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals Notes [STATE] ASBU Air Navigation Reporting Form (ANRF) PIA 1 Block - Module B0 - AMET Date Month XX, 2017 Module Description: Global, regional and local meteorological information: a) forecasts provided by world area forecast centres (WAFC), volcanic ash advisory centres (VAAC) and tropical cyclone advisory centres (TCAC); b) aerodrome warnings to give concise information of meteorological conditions that could adversely affect all aircraft at an aerodrome including wind shear; and c) SIGMETs to provide information on occurrence or expected occurrence of specific enroute weather phenomena which may affect the safety of aircraft operations and other operational meteorological (OPMET) information, including METAR/SPECI and TAF, to provide routine and special observations and forecasts of meteorological conditions occurring or expected to occur at the aerodrome. (...) Element Implementation Status 1 Element Description: AIDC to provide initial flight data to adjacent ATSUs Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 2 Element Description: AIDC to update previously coordinated flight data Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 3 Element Description: AIDC for control transfer Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 4 Element Description: AIDC to transfer CPDLC logon information to the Next Data Authority Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals Notes [STATE] ASBU Air Navigation Reporting Form (ANRF) PIA 3 Block - Module B0 - ACAS Date Month XX, 2017 Module Description: To provide short-term improvements to existing airborne collision avoidance systems (ACAS) to reduce nuisance alerts while maintaining existing levels of safety. (...) Element Implementation Status 1 Element Description: ATSA-AIRB Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details 2 Element Description: ATSA-VSA Date Planned/Implemented Enter date if applicable Status Enter Status Details Enter status details Achieved Benefits Access and Equity Capacity Efficiency Environment Safety Implementation Challenges Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals Notes [STATE] ASBU Air Navigation Reporting Form (ANRF) PIA 3 Block - Module B0 - ASUR Date Month XX, 2017 Module Description: To provide initial capability for lower cost ground surveillance supported by new technologies such as ADS-B OUT and wide area multilateration (MLAT) systems.
Language:English
Score: 620148.3 - https://www.icao.int/NACC/Docu...d%20GANP%20rev%2008022018.docx
Data Source: un
Detailed information pertaining to the contributions to the BWC is contained in Annex II of the document. (...) More information and details about the event are available here . Status of contributions – The Financial Resources Management Service of the United Nations Office at Geneva has provided a summary of the financial contributions to the four disarmament conventions, as at 31 October 2019. (...) Detailed information pertaining to the contributions to the BWC is contained in Annex II of the document. 2020 scale of assessments – The Financial Resources Management Service (FRMS) of the United Nations Office at Geneva has provided the preliminary assessment per State Party for contributions to the BWC budget for the year 2020.
Language:English
Score: 620047.46 - https://www.un.org/disarmament...st-information/news-from-2019/
Data Source: un
o Other For those boxes checked, please briefly provide greater detail or links to additional information. (...) Please provide details of a particular case (or example) where precaution was applied (or decisions made in the face of uncertainty) in the context of chemicals management? (...) For those boxes checked, please briefly provide greater detail or links to additional information. d.
Language:English
Score: 619865.23 - https://www.who.int/ifcs/documents/forums/forum5/poland.pdf
Data Source: un
Part B. Targeted Exemption Details (To be completed by the NCMC or authorized user only) Part B provides specific detail on the targeted exemption, including which Standard it relates to, when the TE is applicable and who in the State is to be contacted for more details, if required. (...) State The State of the Operator (or other responsible State where the State of license issue is not the State of the Operator) will be responsible for providing details of TEs related to Area, Route and Aerodrome recency for operators. (...) Section 2 should specify all such mitigations that have been put in place, in sufficient detail to provide evidence that the proposed mitigations have adequately addressed any additional safety risks associated with the use of the TE.
Language:English
Score: 619207.86 - https://www.icao.int/safety/OP...rmV2/ARATEINSTRUCTIONSV1.1.pdf
Data Source: un