Author unit: Headquarters Building Renovation Project (Deputy Director-General for Management and Reform).
(...) Mechanical, electrical and plumbing works will start shortly and will be closely followed by the renovation of the façade.
8. The renovation of the southern third of the building will be completed and staff will be relocated by the end of 2016. The Office will be actively planning to accomplish the moves
into the renovated premises as quickly and as efficiently as possible, to enable the renovation
of the middle third to continue without undue delay.
Language:English
Score: 1032609.2
-
www.ilo.org/wcmsp5/grou...eetingdocument/wcms_457553.pdf
Data Source: un
Author unit: Headquarters Building Renovation Project (Deputy Director-General for Management and Reform).
(...) Mechanical, electrical and plumbing works will start shortly and will be closely followed by the renovation of the façade.
8. The renovation of the southern third of the building will be completed and staff will be relocated by the end of 2016. The Office will be actively planning to accomplish the moves
into the renovated premises as quickly and as efficiently as possible, to enable the renovation
of the middle third to continue without undue delay.
Language:English
Score: 1032609.2
-
https://www.ilo.org/wcmsp5/gro...eetingdocument/wcms_457553.pdf
Data Source: un
Microsoft Word - RFPQS_Renovation-Contract-2_Attach1_Overview-Prog-Works_final.docx
UNOG │Strategic Heritage Plan Renovation │ Historical Buildings RFPQS │ BLN
Attachment 1 Page 1 of 5
Attachment 1—Overview of Programme of Works
Renovation of the Historical Buildings (Buildings A, B, C, D and S)
at the Palais des Nations in Geneva, Switzerland
UNOG │Strategic Heritage Plan Renovation │ Historical Buildings RFPQS │ BLN
Attachment 1 Page 2 of 5
Figure 1:
Palais des Nations — overall view with enhanced view
of the buildings covered by this RFPQS
UNOG │Strategic Heritage Plan Renovation │ Historical Buildings RFPQS │ BLN
Attachment 1 Page 3 of 5
Figure 2:
3D representation of the different Sections of Work of Historical Building Renovation
(compact view — height proportion not respected)
UNOG │Strategic Heritage Plan Renovation │ Historical Buildings RFPQS │ BLN
Attachment 1 Page 4 of 5
Figure 3:
3D representation of the different Sections of Work of Historical Building Renovation
(view by level)
UNOG │Strategic Heritage Plan Renovation │ Historical Buildings RFPQS │ BLN
Attachment 1 Page 5 of 5
Table 1:
Evaluated duration of works and particular constraints for Sections of Work
Table 2:
SHP Global Project Timeline
Localisation
Evaluated
duration
(months)
Particular constraints
Section 1 Building AC 8 Must overlap as little as possible with Section 3
Section 2 Building AC 7 Must overlap with Section Technical rooms
Section 3 Building A 12 Must overlap as much as possible with Section Technical rooms
Section 4 Building AB 12 Must overlap as little as possible with Section 3
Section Concordia Building A 7 Must overlap with Section Technical rooms
Section C Building C 13 Cannot begin before the New Building is available
Section D Building D 13 Cannot begin before the New Building is available
Section S Building S 18 Cannot begin before the New Building is available
Section B Building B 12 Cannot begin before Section S is handed over
Section Technical Rooms Building A 7 Must begin as soon as possible
Section Cafeteria Building A 8 Must close activity only 3 months in summer
Section
Project Timeline
Activities / Year
Contract 1 - New Building H
Contract 2 - Renovation of the Historical Building
Request For Proposal
Evaluation of proposals
Contract signature
Contractor's mobilization
Renovation works of blds. A/B/C/D/S
Final Hand Over
Contract 3 - Renovation of 1970s E bldg.
UN Construction Contracts: Firm activity:
Contract 2 - purpose of this EOI This Contract
Contract 1 and Contract 3
2018 2019 2020 2021 2022 2023
Language:English
Score: 1023483.9
-
https://www.ungeneva.org/sites..._Overview-Prog-Works_final.pdf
Data Source: un
El Secretario General señala cinco acciones fundamentales necesarias de priorizar ahora a nivel mundial y con objeto de transformar nuestros sistemas energéticos y acelerar el cambio a las energías renovables: «Ya que, sin renovables, no puede haber un futuro».
(...) Cambiar los subsidios destinados a los combustibles fósiles a las energías renovables
Los subsidios para los combustibles fósiles suponen una de las mayores barreras financieras que obstaculizan este cambio global a las energías renovables. (...) Una triple inversión en renovables
Al menos se necesitan invertir 4 trillones de USD anuales en energías renovables hasta el 2030 —contando con las inversiones en tecnologías e infraestructuras— para permitirnos alcanzar el cero neto en emisiones en el 2050.
Language:English
Score: 1022865.6
-
https://www.un.org/es/climatec...on/renewable-energy-transition
Data Source: un
El Secretario General señala cinco acciones fundamentales necesarias de priorizar ahora a nivel mundial y con objeto de transformar nuestros sistemas energéticos y acelerar el cambio a las energías renovables: «Ya que, sin renovables, no puede haber un futuro».
(...) Cambiar los subsidios destinados a los combustibles fósiles a las energías renovables
Los subsidios para los combustibles fósiles suponen una de las mayores barreras financieras que obstaculizan este cambio global a las energías renovables. (...) Una triple inversión en renovables
Al menos se necesitan invertir 4 trillones de USD anuales en energías renovables hasta el 2030 —contando con las inversiones en tecnologías e infraestructuras— para permitirnos alcanzar el cero neto en emisiones en el 2050.
Language:English
Score: 1022865.6
-
https://www.un.org/es/node/178853
Data Source: un
In order to maintain
the momentum and keep improving the safety of the building, renovation works will
continue during the transition period, with the renovation of the staircase located on the
borderline of the worksite and the offices.
(...) The indicative values given in the table above are for the renovation of the respective areas and their infrastructure. (...) The Governing Body takes note of the progress report regarding the headquarters renovation project.
Language:English
Score: 1022405.5
-
www.ilo.org/wcmsp5/grou...eetingdocument/wcms_532787.pdf
Data Source: un
In order to maintain
the momentum and keep improving the safety of the building, renovation works will
continue during the transition period, with the renovation of the staircase located on the
borderline of the worksite and the offices.
(...) The indicative values given in the table above are for the renovation of the respective areas and their infrastructure. (...) The Governing Body takes note of the progress report regarding the headquarters renovation project.
Language:English
Score: 1022405.5
-
https://www.ilo.org/wcmsp5/gro...eetingdocument/wcms_532787.pdf
Data Source: un
UNOG │Strategic Heritage Plan Renovation │ Historical Buildings REOI │ BLN
Attachment 9 Page 1 of 5
Attachment 9—Relevant Experience
Renovation of the Historical Buildings (Buildings A, B, C, D and S) at the Palais des Nations in Geneva, Switzerland.
i. (...) Renovation of heritage or high profile buildings (museums, listed buildings or other historical or protected buildings). (...) Renovation or construction of conference canters with high-end audio visual systems and simultaneous interpretation system.
Language:English
Score: 1021077.4
-
https://www.ungeneva.org/sites..._Relevant-experience_final.pdf
Data Source: un
Yes
No
UNOG │Strategic Heritage Plan Renovation │ Historical Buildings RFPQS│ BLN
Attachment 4 Page 8 of 9
ii. Renovation of heritage or high profile buildings (museums, listed buildings or other historical or protected buildings). (...) The reference ...
ii. Renovation of heritage or high profile buildings (museums, listed buildings or other historical or protected buildings).
Language:English
Score: 1018181.6
-
https://www.ungeneva.org/sites...ttach4-Questionnaire_final.pdf
Data Source: un
Las energías renovables son más baratas
Actualmente, las energías renovables suponen, en realidad, la opción más asequible en la mayor parte del mundo. (...) ¿Qué son las energías renovables?
Derivada de fuentes naturales abundantes y que se reponen continuamente, la energía renovable es clave para un mundo más seguro, limpio y sostenible. Explora aquí fuentes comunes de energía renovable.
Cinco formas de reactivar la transición a energías renovables
El Secretario General señala cinco acciones fundamentales necesarias para transformar nuestros sistemas energéticos y acelerar el cambio a las energías renovables.
Language:English
Score: 1016966.3
-
https://www.un.org/es/climatec...sing-ambition/renewable-energy
Data Source: un