Home

Results 1 - 10 of 24,389 for renovations. Search took 0.778 seconds.  
Sort by date/Sort by relevance
Author unit: Headquarters Building Renovation Project (Deputy Director-General for Management and Reform). (...) Mechanical, electrical and plumbing works will start shortly and will be closely followed by the renovation of the façade. 8. The renovation of the southern third of the building will be completed and staff will be relocated by the end of 2016. The Office will be actively planning to accomplish the moves into the renovated premises as quickly and as efficiently as possible, to enable the renovation of the middle third to continue without undue delay.
Language:English
Score: 1032609.2 - www.ilo.org/wcmsp5/grou...eetingdocument/wcms_457553.pdf
Data Source: un
Author unit: Headquarters Building Renovation Project (Deputy Director-General for Management and Reform). (...) Mechanical, electrical and plumbing works will start shortly and will be closely followed by the renovation of the façade. 8. The renovation of the southern third of the building will be completed and staff will be relocated by the end of 2016. The Office will be actively planning to accomplish the moves into the renovated premises as quickly and as efficiently as possible, to enable the renovation of the middle third to continue without undue delay.
Language:English
Score: 1032609.2 - https://www.ilo.org/wcmsp5/gro...eetingdocument/wcms_457553.pdf
Data Source: un
The Capital Master Plan (“CMP”) is a large-scale, long-term renovation of the United Nations Headquarters Complex in New York, mandated by the General Assembly. (...) The Albano building has been renovated at a cost of USD24 million to bring the working conditions up to “the required standard”. Despite the renovations, a number of issues with the Albano building remain (see Gatti et al.). 8.
Language:English
Score: 1031539.55 - www.un.org/en/internalj...es/undt/orders/ny-2013-130.pdf
Data Source: oaj
Microsoft Word - RFPQS_Renovation-Contract-2_Attach1_Overview-Prog-Works_final.docx UNOG │Strategic Heritage Plan Renovation │ Historical Buildings RFPQS │ BLN Attachment 1 Page 1 of 5 Attachment 1—Overview of Programme of Works Renovation of the Historical Buildings (Buildings A, B, C, D and S) at the Palais des Nations in Geneva, Switzerland UNOG │Strategic Heritage Plan Renovation │ Historical Buildings RFPQS │ BLN Attachment 1 Page 2 of 5 Figure 1: Palais des Nations — overall view with enhanced view of the buildings covered by this RFPQS UNOG │Strategic Heritage Plan Renovation │ Historical Buildings RFPQS │ BLN Attachment 1 Page 3 of 5 Figure 2: 3D representation of the different Sections of Work of Historical Building Renovation (compact view — height proportion not respected) UNOG │Strategic Heritage Plan Renovation │ Historical Buildings RFPQS │ BLN Attachment 1 Page 4 of 5 Figure 3: 3D representation of the different Sections of Work of Historical Building Renovation (view by level) UNOG │Strategic Heritage Plan Renovation │ Historical Buildings RFPQS │ BLN Attachment 1 Page 5 of 5 Table 1: Evaluated duration of works and particular constraints for Sections of Work Table 2: SHP Global Project Timeline Localisation Evaluated  duration  (months) Particular constraints Section 1 Building AC 8 Must overlap as little as possible with Section 3 Section 2 Building AC 7 Must overlap with Section Technical rooms Section 3 Building A 12 Must overlap as much as possible with Section Technical rooms Section 4 Building AB 12 Must overlap as little as possible with Section 3 Section Concordia Building A 7 Must overlap with Section Technical rooms Section C Building C 13 Cannot begin before the New Building is available Section D Building D 13 Cannot begin before the New Building is available Section S Building S 18 Cannot begin before the New Building is available Section B Building B 12 Cannot begin before Section S is handed over Section Technical Rooms Building A 7 Must begin as soon as possible Section Cafeteria Building A 8 Must close activity only 3 months in summer Section Project Timeline Activities / Year Contract 1 - New Building H Contract 2 - Renovation of the Historical Building Request For Proposal Evaluation of proposals Contract signature Contractor's mobilization Renovation works of blds. A/B/C/D/S Final Hand Over Contract 3 - Renovation of 1970s E bldg. UN Construction Contracts: Firm activity: Contract 2 - purpose of this EOI This Contract Contract 1 and Contract 3 2018 2019 2020 2021 2022 2023
Language:English
Score: 1023483.9 - https://www.ungeneva.org/sites..._Overview-Prog-Works_final.pdf
Data Source: un
El Secretario General señala  cinco acciones fundamentales necesarias de priorizar ahora a nivel mundial y con objeto de transformar nuestros sistemas energéticos y acelerar el cambio a las energías renovables: «Ya que, sin renovables, no puede haber un futuro».   (...) Cambiar los subsidios destinados a los combustibles fósiles a las energías renovables Los subsidios para los combustibles fósiles suponen una de las mayores barreras financieras que obstaculizan este cambio global a las energías renovables. (...) Una triple inversión en renovables Al menos se necesitan invertir  4 trillones de USD anuales en energías renovables hasta el 2030 —contando con las inversiones en tecnologías e infraestructuras— para permitirnos alcanzar el cero neto en emisiones en el 2050.
Language:English
Score: 1022865.6 - https://www.un.org/es/climatec...on/renewable-energy-transition
Data Source: un
El Secretario General señala  cinco acciones fundamentales necesarias de priorizar ahora a nivel mundial y con objeto de transformar nuestros sistemas energéticos y acelerar el cambio a las energías renovables: «Ya que, sin renovables, no puede haber un futuro».   (...) Cambiar los subsidios destinados a los combustibles fósiles a las energías renovables Los subsidios para los combustibles fósiles suponen una de las mayores barreras financieras que obstaculizan este cambio global a las energías renovables. (...) Una triple inversión en renovables Al menos se necesitan invertir  4 trillones de USD anuales en energías renovables hasta el 2030 —contando con las inversiones en tecnologías e infraestructuras— para permitirnos alcanzar el cero neto en emisiones en el 2050.
Language:English
Score: 1022865.6 - https://www.un.org/es/node/178853
Data Source: un
In order to maintain the momentum and keep improving the safety of the building, renovation works will continue during the transition period, with the renovation of the staircase located on the borderline of the worksite and the offices. (...) The indicative values given in the table above are for the renovation of the respective areas and their infrastructure. (...) The Governing Body takes note of the progress report regarding the headquarters renovation project.
Language:English
Score: 1022405.5 - www.ilo.org/wcmsp5/grou...eetingdocument/wcms_532787.pdf
Data Source: un
In order to maintain the momentum and keep improving the safety of the building, renovation works will continue during the transition period, with the renovation of the staircase located on the borderline of the worksite and the offices. (...) The indicative values given in the table above are for the renovation of the respective areas and their infrastructure. (...) The Governing Body takes note of the progress report regarding the headquarters renovation project.
Language:English
Score: 1022405.5 - https://www.ilo.org/wcmsp5/gro...eetingdocument/wcms_532787.pdf
Data Source: un
UNOG │Strategic Heritage Plan Renovation │ Historical Buildings REOI │ BLN Attachment 9 Page 1 of 5 Attachment 9—Relevant Experience Renovation of the Historical Buildings (Buildings A, B, C, D and S) at the Palais des Nations in Geneva, Switzerland. i. (...) Renovation of heritage or high profile buildings (museums, listed buildings or other historical or protected buildings). (...) Renovation or construction of conference canters with high-end audio visual systems and simultaneous interpretation system.
Language:English
Score: 1021077.4 - https://www.ungeneva.org/sites..._Relevant-experience_final.pdf
Data Source: un
Yes No UNOG │Strategic Heritage Plan Renovation │ Historical Buildings RFPQS│ BLN Attachment 4 Page 8 of 9 ii. Renovation of heritage or high profile buildings (museums, listed buildings or other historical or protected buildings). (...) The reference ... ii. Renovation of heritage or high profile buildings (museums, listed buildings or other historical or protected buildings).
Language:English
Score: 1018181.6 - https://www.ungeneva.org/sites...ttach4-Questionnaire_final.pdf
Data Source: un