Home

Results 1 - 10 of 66,958 for smooth flooring. Search took 1.118 seconds.  
Sort by date/Sort by relevance
m 2 209.0                                     ‐    b  Provide and apply 15mm cement and sand 1:4 external rendering and finishing coat to  concrete or stone masonry footing M2 18.9                                     ‐    4.2 Floor Finishing                                     ‐    Cement and sand (1;4) Screeds and backings                                    ‐    a Supply and lay 40mm thick cement sand screed  floor finish in two coats steel trowelled to a  smooth finish M 2 104                                     ‐    ELEMENT No.4 FINISHING ELEMENT No.3 WINDOWS Page 2/8 b Supply, lay and finish  Step and ramp using  stones for foundation, plain conc and cement  paste finishing. (...) Smooth wallbefore applying  undercoat primer and two coat of                                     ‐    a externally ‐ using white cement.for internal wall  use gypsum powder. Apply three coat, smooth  the walls then apply undercoat followed by  wheatherguard painting m2 103.6                                     ‐    b Apply three coats of gypsum powder on ceiling  board, smooth it  M2 103.8                                     ‐    c Prepare the surface and apply 3 coats of emulsion paint to ceiling board M 2 103.8                                     ‐    d Prepare the surface and apply 3‐ coats of vinyl  silk emulsion paint to internal and weather  gurard to external walls of the building M2 207.2                                     ‐    e Provide and apply 2 coats of bituminous paint to plinth area of the building M2 18.9                                     ‐    Sub Total for Element No.5 Painting and  Decorations                                    ‐    Supply and install  Swing set with 3 swings, pc 1                                    ‐    Supply and install  2 See saws mounted on single  frame  one not less 150cm pc 2                                    ‐    Supply and install one ladder and slide; height  not less than 200cm  pc 1                                    ‐    Supply mats in the classroom pc 5                                    ‐    Assorted learning materials ‐ story books,   picture books, basic stationaries (to be  purchased in consultation with UNESCO) Package 1             500,000                    500,000.00   6. 
Language:English
Score: 1420892.7 - https://en.unesco.org/sites/de.../boq-cbecd-kasulu-20211012.pdf
Data Source: un
All data are seasonally adjusted and smoothed with the X-13 ARIMA program unless already seasonally adjusted, in which case they are only smoothed. (...) Possible data issues include end-point bias inherent in smoothing algorithms such as X-13 ARIMA and the HP filter. (...) Note that the HP-estimated trend becomes less steep over time in response to recent shocks. Panel C shows the smoothed short-run series and the HP trend together, while Panel D shows deviations of the smoothed series from the trend.
Language:English
Score: 1369928.6 - https://www.wto.org/english/ne.../metodology_wtoi_12sep19_e.pdf
Data Source: un
All data are seasonally adjusted and smoothed with the X-13 ARIMA program unless already seasonally adjusted, in which case they are only smoothed. Recent trends for each data series are then estimated using the Hodrick-Prescott (HP) filter with conventional smoothing parameters.2 Deviations from these trends are calculated for each component series as the difference between the smoothed, seasonally adjusted data and the trend established by the HP filter. (...) Possible data issues include end-point bias inherent in smoothing algorithms such as X-13 ARIMA and the HP filter.
Language:English
Score: 1340240.8 - https://www.wto.org/english/ne.../metodology_wtoi_11mar21_e.pdf
Data Source: un
Permanent Representatives and Deputy Permanent Representatives are kindly asked to indicate PR/DPR immediately after the name of the country to ensure a smooth management of the list of speakers. Interpretation, statements, and order of interventions: · This virtual session will benefit from interpretation services in Zoom in the six (6) official UN languages. (...) After all the Permanent Representatives have spoken, the floor will be given to Deputy Permanent Representatives – first those that had requested to be inscribed in writing by deadline, followed by Deputy Permanent Representatives requesting the floor using raise-hand function in Zoom during the meeting. Next, the floor will be given to all other delegations that have requested to be inscribed in the list of speakers in advance, followed by all other delegations requesting the floor in Zoom.
Language:English
Score: 1274767.4 - https://www.undp.org/sites/g/f...0regular%20session%202022.docx
Data Source: un
Relative contributions of nine regions to cumulative global emissions (1751–2004), current global emission flux (2004), global emissions growth rate (5 year smoothed for 2000–2004), and global population (2004) Source: Raupach M. (...) PNAS 2007;104:10288-10293 © 2007 by The National Academy of Sciences of the USA Emission distribution of individuals Emission distribution of individuals 50% 75% A global-emissions cap and an individual- emissions floor 1 • Trade off between equity and stringency of climate policy. • Focus on individuals to guide nations in the transition to a low carbon world. • The world’s poor do not need to be denied fossil fuels.
Language:English
Score: 1230171.2 - https://www.un.org/esa/dsd/dsd...s/Tavoni_presentation13_10.pdf
Data Source: un
As a host country, my Government has given utmost priority to the project and has done its best in facilitating the smooth delivery of the infrastructure components, in the timely completion of access roads leading to the new entrances of the ECA compound and other administrative support facilities. (...) In this regard, we welcome the proposal of the Secretary General for 18 Security officers to conduct fire, compound and floor patrols and to provide screening services at the vehicular and pedestrian entrance gates on a shift basis. (...) In this 3 connection, let me reiterate my Government's assurance for a guaranteed access for all imported materials, and other facilitation necessary for the smooth implementation of the project. Mr. Chairman, In Conclusion, my delegation would like to assure you of its readiness to discuss the agenda item further in the informal consultations.
Language:English
Score: 1221299.8 - https://www.un.org/en/ga/fifth..._PB%202014-15_ECA_Ethiopia.pdf
Data Source: un
Thematic event: Sustainable energy Plenary Hall (Etihad Ballroom, floor -1) 9.30–10.15 a.m. Credentials Committee Main Committee Hall (Chamber, floor -1) 10 a.m.–1 p.m. 5th plenary meeting Plenary Hall Adoption of the Abu Dhabi Declaration General debate Items 7 to 23 (continued) (Etihad Ballroom, floor -1) 1.30–3 p.m. (...) Thematic event: Fostering Innovation and Connectivity for a Smooth Transformation to Industry 4.0 All participants are cordially invited to attend a thematic event on Industry 4.0, on Tuesday, 5 November, at 1.30 p.m. in the Plenary Hall (Etihad Ballroom), on floor -1 of the Emirates Palace Hotel. This event presents an opportunity to discuss new models and approaches to mobilize collective actions for fostering collaboration, innovation, and connectivity for ensuring a smooth transformation to Industry 4.0. Launch of the Industrial Development Report (IDR) 2020 All participants are cordially invited to attend the launch of the Industrial Development Report (IDR) taking place on Tuesday, 5 November 2019, at 3.30 p.m. in the Plenary Hall (Etihad Ballroom), on floor -1 of the Emirates Palace Hotel.
Language:English
Score: 1215711.2 - https://www.unido.org/api/open...d/15712455/unido-file-15712455
Data Source: un
A detailed UN  framework for facilitating "smooth transition" strategies for the benefit of graduating countries was put in  place in 2004 (resolution 59/209).   (...) (2)  What practical  steps  can be  taken at national and  international  levels  to bring  the principle of  smooth transition to fruition and make it beneficial?  (...) (4)  A  development  partner's  views:  how  to  soundly  respond  to  the  plea  for  smooth  transition  measures?     Moderator and panelists:  Moderator:  Mr. 
Language:English
Score: 1215076 - https://www.un.org/en/ga/second/65/docs/graduation.pdf
Data Source: un
As such, it differs from a celestial globe, which is a smooth sphere whose principal purpose is to map the star constellations. Location (Building):  General Assembly (GA) 1st Floor Donor Country:  México Artist or Maker:  V.M.
Language:English
Score: 1200850 - https://www.un.org/ungifts/content/la-unidad-humana
Data Source: un
As such, it differs from a celestial globe, which is a smooth sphere whose principal purpose is to map the star constellations. Location (Building):  General Assembly (GA) 1st Floor Donor Country:  México Artist or Maker:  V.M.
Language:English
Score: 1200850 - https://www.un.org/ungifts/node/400
Data Source: un