Home

Results 51 - 60 of 67,216 for smooth flooring. Search took 6.018 seconds.  
Sort by date/Sort by relevance
DAILY JOURNAL - TUESDAY, 20 OCTOBER 2015
TRAVEL DATES FOR HEADS OF DELEGATIONS ATTENDING THE HIGH-LEVEL SEGMENT To ensure the smooth arrival and departure of Heads of delegation attending the High-Level Segment of COP 12, delegations are kindly requested to communicate their flight details and hotel accommodation to Mrs. (...) STATEMENTS OF DELEGATIONS By its latest legislation, namely General Assembly resolution 69/250 on the Pattern of Conferences, the General Assembly reiterates its request to ensure the provision of high-quality conference services to member States and other participants in official United Nations meetings. To ensure the smooth running of the meetings, participants need to maintain a normal speed whenever delivering speeches or making statements, so that the required high-quality simultaneous interpretation services can be delivered to the entire satisfaction of all concerned. (...) Ezio Seghetti Phone: +905340303401 CSO Liaison ERPA offices Second floor Mr. Marcos Montoiro Office 205 Phone: +905340303015 E-mail: mmontoiro@unccd.int IT Help Desk Third floor Office 318 Phone: +905340303310 Internet café Mezzanine above the lobby Press working area Second floor straight down from the elevators Ms.
Language:English
Score: 997411.7 - daccess-ods.un.org/acce...en&DS=ICCD/COP(12)/OD/7&Lang=E
Data Source: ods
Since late 2019, the Government of Angola has demonstrated interest on the preparation of a smooth transition strategy, assisted by DESA’s technical cooperation activities3 and more recently by the Inter-agency Task Force Team led by OHRLLS. (...) In view of the impacts of the COVID-19 and the surmounting debt issues, on 29 December 2020, the Government sent a letter to the Chair of the CDP, informing the CDP that the Government is requesting an additional period of time to prepare its smooth transition strategy (see Annex 1). 2 World Bank. (...) That why is requesting Against this background of the government of Angola decided to request an additional period of time of 4 years, to better prepare the smooth transition strategy report with your assistance, technical support and advice to be submitted in February 2025 .
Language:English
Score: 994943.2 - https://www.un.org/development...tes/45/CDP-PL-2021-PL-5B.1.pdf
Data Source: un
We believe UNIDO left this juncture behind and got on the right track, with the smooth election of Mr. Li as DG and the finalization of the strategic guidance document in June this year. (...) Hungary would also like to invite all delegates to the cocktail reception today at 2 o’clock on the second floor of the Hotel in the restaurant Market 770.
Language:English
Score: 992644.6 - https://www.unido.org/sites/de...IDO_GC_HUngary_statement_0.pdf
Data Source: un
UN Capital Development Fund Two UN Plaza, 26 th Floor, New York, NY 10017 | Tel: +1 212 906 6565 | Fax: +1 212 906 6479 | www.uncdf.org  Good morning excellencies, distinguished delegates and colleagues, thank you for having me.  It is critical that the LDC5 Conference delivers concrete solutions that make finance work better for the LDCs and graduating and graduated countries.  The Sustainable Graduation Support Facility (SGSF) is one such measure that can provide graduating and graduated countries the capacity support they need to achieve a smooth transition and address the loss of LDC- specific international support measures.  The LDC5 outcome document also calls for a dedicated financing mechanism that uses catalytic capital to mobilize sustainable private finance.  Together, these two dedicated facilities can play a complementary role in providing graduating LDCs access to finance. http://www.uncdf.org/ 2  In this context it is critical for us in UNCDF to think about how we can be more ambitious and further increase our support in responding to the calls for these dedicated support facilities.  In the coming years, UNCDF aims to accelerate the transition to become a hybrid organization between a development agency and development finance institution.  This means that we will pursue integrated approaches to support SDG achievement by providing a combination of policy and technical support along with catalytic financing and financial advisory services.  Our work to support inclusive digital economies and finance, along with municipal development finance and infrastructure investments, remains a critical foundation for our work.  This helps strengthen the enabling environment, public and private capabilities and domestic market ecosystems that allow countries to 3 increasingly attract investments, including from external public and private capital providers.  For example, to support transformation to digital economies, we work with fintech firms and digital platforms to help link small and medium- sized enterprises (SMEs) to markets, to financial services and to integrate digital solutions in their business models.  We also explore innovative ways for how digital technologies can help mobilize SDG investments.
Language:English
Score: 992644.6 - https://www.un.org/ldc5/sites/...s_lead_discussant_session3.pdf
Data Source: un
PLENARY, TUESDAY 6 SEPTEMBER 2016 (A.M.)
Does any other delegation wish to take the floor? I give the floor to the representative of Cuba. (...) President, we have requested the floor to express our appreciation for the very efficient manner in which you have been conducting our work and, in particular, leading the Conference on Disarmament to a smooth adoption of its annual report for the year 2016. The smooth adoption, of course, does not overshadow the fact and our disappointment that the Conference has not conducted substantive work this year.
Language:English
Score: 988046 - https://daccess-ods.un.org/acc.../get?open&DS=CD/PV.1400&Lang=E
Data Source: ods
The new thermal insulation and windows have been installed with only the 11th floor remaining to be completed. 4. The facade panels have all been cleaned and new sealing joints installed. 5. (...) Training and acceptance protocols will be drawn up and implemented in collaboration with the internal maintenance teams for a smooth transition from worksite to operational systems. (...) As announced at the March 2016 Governing Body session, savings being generated by the value engineering will be reallocated to the provision for unforeseen costs and to the partial renovation of the lower floors: Financial update, as at 31 August 2016 CHF(‘000) Approved budget 205 549 Contracts issued 197 755 Expenditure to date 61 391 Renovation of lower floors 13.
Language:English
Score: 984031.3 - www.ilo.org/wcmsp5/grou...eetingdocument/wcms_532787.pdf
Data Source: un
The new thermal insulation and windows have been installed with only the 11th floor remaining to be completed. 4. The facade panels have all been cleaned and new sealing joints installed. 5. (...) Training and acceptance protocols will be drawn up and implemented in collaboration with the internal maintenance teams for a smooth transition from worksite to operational systems. (...) As announced at the March 2016 Governing Body session, savings being generated by the value engineering will be reallocated to the provision for unforeseen costs and to the partial renovation of the lower floors: Financial update, as at 31 August 2016 CHF(‘000) Approved budget 205 549 Contracts issued 197 755 Expenditure to date 61 391 Renovation of lower floors 13.
Language:English
Score: 984031.3 - https://www.ilo.org/wcmsp5/gro...eetingdocument/wcms_532787.pdf
Data Source: un
United Nations EC
The text of the ATP for the measurement of the external surface area of insulated vans is not practical for all shapes and sizes of vehicle. The smooth contours of a van body make it difficult to establish the most accurate datum point to take measurements from. For example the width of the floor is often different from the ceiling and the front can be narrower than the rear where a side door is installed. 3. (...) For example, in the case of the van floor the external surface would be the line where the original equipment manufacturer floor level is."
Language:English
Score: 983168.3 - daccess-ods.un.org/acce...ECE/TRANS/WP.11/2011/12&Lang=E
Data Source: ods
I feel the texture of the bed linen with my fingers. Cotton satin, smoothness with hints of roughness. I look around, counting five red objects in the room: the wall behind the bed, the stripes on the bed cover, the small wooden box on the desk, the drawing pad, and that curious peg on the shelf. (...) I slide down until my feet touch the floor and through my sweaty socks I feel the hard and cold laminate floor.   After a nearly successful escape from my foggy brain into the present moment, I ask myself: here are my walls, bed, and floor, in the safety of the family home. I do not have to pay for them – so why do I want to move out? 
Language:English
Score: 982238.8 - https://www.unicef.org/croatia...eed-move-out-our-parents-house
Data Source: un
PROPOSAL FOR DRAFT AMENDMENTS TO REGULATION NO. 107, DOUBLE-DECK PASSENGER VEHICLES / TRANSMITTED BY THE SECRETARIAT
The maximum slope of the floor in the access passage shall not exceed 5 per cent when the unladen vehicle is standing on a smooth and horizontal surface in its normal condition of travel (in particular: any kneeling device shall not be engaged).” (...) The maximum slope of the step in any direction shall not exceed 5 per cent when the unladen vehicle is standing on a smooth and horizontal surface in its normal condition of travel (in particular: any kneeling device shall not be engaged).” (...) Paragraph 5.12.2.3. , amend to read: "...... the floor at that position. Exception may be given in the middle of large platforms, but the sum of these exceptions shall not exceed 20 per cent of the total standing area."
Language:English
Score: 978709.2 - daccess-ods.un.org/acce...RANS/WP.29/GRSG/1999/16&Lang=E
Data Source: ods